ML062430442: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML062430442 | | number = ML062430442 | ||
| issue date = 08/31/2006 | | issue date = 08/31/2006 | ||
| title = | | title = Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08 | ||
| author name = Desai | | author name = Desai B | ||
| author affiliation = NRC/RGN-II/DRP/RPB4 | | author affiliation = NRC/RGN-II/DRP/RPB4 | ||
| addressee name = Walt T | | addressee name = Walt T | ||
| addressee affiliation = Carolina Power & Light Co | | addressee affiliation = Carolina Power & Light Co | ||
| docket = 05000261, 07200003, 07200060 | | docket = 05000261, 07200003, 07200060 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2006 | {{#Wiki_filter:Page 1 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues DRP/BR4 - PI&R 3 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/20/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 01/08/2007 01/12/2007 Not Applicable PSB1-RP - RP PUBLIC INSPECTION 3 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/08/2007 01/12/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 01/08/2007 01/12/2007 Baseline Inspections OL EXAM - INITIAL EXAM 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 02/05/2007 02/16/2007 Not Applicable OL RQ - REQUAL INSPECTION 3 2 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 2 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 2 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/29/2007 05/04/2007 Baseline Inspections PS2-EP - EP INSP 1 2 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/16/2007 07/20/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/30/2007 08/03/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures. | ||
-03/31/2008 | |||
Page 2 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FP - INFO TRIP 5 2 IP 7111105T Fire Protection [Triennial] 10/02/2007 10/04/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION INSP 5 2 IP 7111105T Fire Protection [Triennial] 10/22/2007 10/26/2007 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 11/05/2007 11/09/2007 Baseline Inspections PS2-EP - EP EXERCISE 2 2 IP 7111401 Exercise Evaluation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Robinson Inspection / Activity Plan 09/01/2006 | |||
-03/31/2008 | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} |
Latest revision as of 14:32, 23 November 2019
ML062430442 | |
Person / Time | |
---|---|
Site: | Robinson, 07200003, 07200060 |
Issue date: | 08/31/2006 |
From: | Binoy Desai NRC/RGN-II/DRP/RPB4 |
To: | Walt T Carolina Power & Light Co |
Shared Package | |
ML062430434 | List: |
References | |
Download: ML062430442 (2) | |
Text
Page 1 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues DRP/BR4 - PI&R 3 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/20/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 01/08/2007 01/12/2007 Not Applicable PSB1-RP - RP PUBLIC INSPECTION 3 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/08/2007 01/12/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 01/08/2007 01/12/2007 Baseline Inspections OL EXAM - INITIAL EXAM 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 02/05/2007 02/16/2007 Not Applicable OL RQ - REQUAL INSPECTION 3 2 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 2 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 2 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/29/2007 05/04/2007 Baseline Inspections PS2-EP - EP INSP 1 2 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/16/2007 07/20/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/30/2007 08/03/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.
Page 2 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FP - INFO TRIP 5 2 IP 7111105T Fire Protection [Triennial] 10/02/2007 10/04/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION INSP 5 2 IP 7111105T Fire Protection [Triennial] 10/22/2007 10/26/2007 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 11/05/2007 11/09/2007 Baseline Inspections PS2-EP - EP EXERCISE 2 2 IP 7111401 Exercise Evaluation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.