ML062430442: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML062430442
| number = ML062430442
| issue date = 08/31/2006
| issue date = 08/31/2006
| title = H. B. Robinson Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
| title = Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Walt T D
| addressee name = Walt T
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261, 07200003, 07200060
| docket = 05000261, 07200003, 07200060
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2006
{{#Wiki_filter:Page 1 of 2                                                                                      Robinson 08/30/2006    15:40:16                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                      on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                           1 2            IP 2515/169              Mitigating Systems Performance Index Verification                                                    08/01/2006 12/31/2006 Safety Issues DRP/BR4       - PI&R                                                                                                     3 2            IP 71152B                Identification and Resolution of Problems                                                            10/02/2006 10/20/2006 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     01/08/2007 01/12/2007 Not Applicable PSB1-RP        - RP PUBLIC INSPECTION                                                                                      3 2           IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                       01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             01/08/2007 01/12/2007 Baseline Inspections 2           IP 71151                 Performance Indicator Verification                                                                   01/08/2007 01/12/2007 Baseline Inspections OL EXAM        - INITIAL EXAM                                                                                              5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     02/05/2007 02/16/2007 Not Applicable OL RQ         - REQUAL INSPECTION                                                                                         3 2            IP 7111111B              Licensed Operator Requalification Program                                                            02/26/2007 03/02/2007 Baseline Inspections EB3-ISI       - U2 INSERVICE INSPECTION                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/16/2007 04/20/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                                             2 2           IP 7112101               Access Control to Radiologically Significant Areas                                                   04/16/2007 04/20/2007 Baseline Inspections 2           IP 7112102               ALARA Planning and Controls                                                                         04/16/2007 04/20/2007 Baseline Inspections 2           IP 71151                 Performance Indicator Verification                                                                   04/16/2007 04/20/2007 Baseline Inspections EB3SGISI       - U2 STEAM GENERATOR ISI                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                         2 2           IP 71111                 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity                             04/29/2007 05/04/2007 Baseline Inspections PS2-EP         - EP INSP                                                                                                   1 2            IP 71151                Performance Indicator Verification                                                                  06/25/2007 06/29/2007 Baseline Inspections EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                         6 2            IP 7111121              Component Design Bases Inspection                                                                    06/25/2007 06/29/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   07/16/2007 07/20/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   07/30/2007 08/03/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   08/13/2007 08/17/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI INSPECTION BY RESIDENT                                                                 1 2           IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                     07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities.                                                                                                 Enclosure This report shows only on-site and announced inspection procedures.
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2  2515/169 IP Mitigating Systems Performance Index Verification 3 DRP/BR4-PI&R Baseline Inspections 10/02/2006 10/20/2006 2  71152B IP Identification and Resolution of Problems 5 OL PREP-INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2   V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 PSB1-RP-RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2   7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2   7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2   7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2   71151 IP Performance Indicator Verification 5 OL EXAM-INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2   V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 OL RQ-REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2  7111111B IP Licensed Operator Requalification Program 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2  7111108P IP Inservice Inspection Activities - PWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2   7112102 IP A LARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2   71151 IP Performance Indicator Verification 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2  7111108P IP Inservice Inspection Activities - PWR 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
 
Baseline Inspections 04/29/2007 05/04/2007 2   71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1 PS2-EP-EP INSP Baseline Inspections 06/25/2007 06/29/2007 2  71151 IP Performance Indicator Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2  7111121 IP Component Design Bases Inspection 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2   60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                                Robinson 08/30/2006    15:40:16                                                          Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                      No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                              Title                        on Site       Start    End            Type TFP           - TRIENNIAL FP - INFO TRIP                                                             5 2            IP 7111105T              Fire Protection [Triennial]                                                      10/02/2007 10/04/2007 Baseline Inspections TFP            - TRIENNIAL FIRE PROTECTION INSP                                                        5 2           IP 7111105T             Fire Protection [Triennial]                                                     10/22/2007 10/26/2007 Baseline Inspections 2           IP 7111105T             Fire Protection [Triennial]                                                     11/05/2007 11/09/2007 Baseline Inspections PS2-EP         - EP EXERCISE                                                                           2 2           IP 7111401               Exercise Evaluation                                                             12/03/2007 12/07/2007 Baseline Inspections 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                               12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP01           Drill/Exercise Performance                                                       12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP02           ERO Drill Participation                                                         12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP03           Alert & Notification System                                                     12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5 TFP-TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2   7111105T IP Fire Protection [Triennial]
5 TFP-TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2   7111105T IP Fire Protection [Triennial]
Baseline Inspections 11/05/2007 11/09/2007 2  7111105T IP Fire Protection [Triennial]
2 PS2-EP-EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2   7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:32, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430442
Person / Time
Site: Robinson, 07200003, 07200060  Duke Energy icon.png
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Walt T
Carolina Power & Light Co
Shared Package
ML062430434 List:
References
Download: ML062430442 (2)


Text

Page 1 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues DRP/BR4 - PI&R 3 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/20/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 01/08/2007 01/12/2007 Not Applicable PSB1-RP - RP PUBLIC INSPECTION 3 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/08/2007 01/12/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 01/08/2007 01/12/2007 Baseline Inspections OL EXAM - INITIAL EXAM 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 02/05/2007 02/16/2007 Not Applicable OL RQ - REQUAL INSPECTION 3 2 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 2 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 2 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/29/2007 05/04/2007 Baseline Inspections PS2-EP - EP INSP 1 2 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/16/2007 07/20/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/30/2007 08/03/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FP - INFO TRIP 5 2 IP 7111105T Fire Protection [Triennial] 10/02/2007 10/04/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION INSP 5 2 IP 7111105T Fire Protection [Triennial] 10/22/2007 10/26/2007 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 11/05/2007 11/09/2007 Baseline Inspections PS2-EP - EP EXERCISE 2 2 IP 7111401 Exercise Evaluation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.