ML13116A391: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13116A391
| number = ML13116A391
| issue date = 07/12/2013
| issue date = 07/12/2013
| title = Columbia Generating Station - (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660)
| title = (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660)
| author name = Lyon C F
| author name = Lyon C
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Reddeman M E
| addressee name = Reddeman M
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
| license number = NPF-021
| license number = NPF-021
| contact person = Lyon C F
| contact person = Lyon C
| case reference number = TAC D91660
| case reference number = TAC D91660
| document type = Letter
| document type = Letter
| page count = 3
| page count = 3
| project = TAC:D91660
| stage = Approval
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 12, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
==SUBJECT:==
COLUMBIA GENERATING STATION - REVIEW OF PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 17 (TAC NO. D91660)
==Dear Mr. Reddemann:==
By letter dated August 1, 2012, as supplemented by letter dated November 15, 2012, Energy Northwest (the licensee) submitted Revision 17 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for Columbia Generating Station, under the provisions of paragraph 50.54(p)(2) of Title 10 of the Code of Federal Regulations (10 CFR).
Pursuant to 10 CFR 50.54(p)(2), the licensee may make changes to the plans without prior U.S. Nuclear Regulatory Commission (NRC) approval if the changes do not decrease the safeguards effectiveness of the security plans. The NRC staffs review consisted of determining whether the licensee properly concluded that the changes did not decrease the safeguards effectiveness of the Commission-approved security plans.
The NRC staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions, as noted in the enclosure. The staff's review is documented in the enclosure, which is internal information not available to the public. The effectiveness of the implementation of Revision 17 is subject to future NRC review and inspection.
M. Reddemann                                -2 If you have any questions, please contact me at 301-415-2296 or via e-mail at fred.lyon@nrc.gov.
Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397
==Enclosure:==
As stated cc w/Letter only: Distribution via Listserv
NON*PUBLIC Letter/
==Enclosure:==
ML13116A393 PUBLIC Letter: ML13116A391
*b)y memo dated OFFICE    NRRlDORULPL4/PM    NRRlDORULPL4/LA NSIRIDSP/RSLB !BC NRRlDORULPL4/BC NRRlDORULPL4/PM '
NAME      FLyon              JBurkhardt      RFelts*          MMarkley        FLyon DATE      7/10/13            5/6113          4/13/13          7/12/13        7/12/13}}

Latest revision as of 13:37, 17 November 2019

(Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660)
ML13116A391
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/12/2013
From: Lyon C
Plant Licensing Branch IV
To: Reddeman M
Energy Northwest
Lyon C
References
TAC D91660
Download: ML13116A391 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 12, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT:

COLUMBIA GENERATING STATION - REVIEW OF PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 17 (TAC NO. D91660)

Dear Mr. Reddemann:

By letter dated August 1, 2012, as supplemented by letter dated November 15, 2012, Energy Northwest (the licensee) submitted Revision 17 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, for Columbia Generating Station, under the provisions of paragraph 50.54(p)(2) of Title 10 of the Code of Federal Regulations (10 CFR).

Pursuant to 10 CFR 50.54(p)(2), the licensee may make changes to the plans without prior U.S. Nuclear Regulatory Commission (NRC) approval if the changes do not decrease the safeguards effectiveness of the security plans. The NRC staffs review consisted of determining whether the licensee properly concluded that the changes did not decrease the safeguards effectiveness of the Commission-approved security plans.

The NRC staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions, as noted in the enclosure. The staff's review is documented in the enclosure, which is internal information not available to the public. The effectiveness of the implementation of Revision 17 is subject to future NRC review and inspection.

M. Reddemann -2 If you have any questions, please contact me at 301-415-2296 or via e-mail at fred.lyon@nrc.gov.

Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

As stated cc w/Letter only: Distribution via Listserv

NON*PUBLIC Letter/

Enclosure:

ML13116A393 PUBLIC Letter: ML13116A391

  • b)y memo dated OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NSIRIDSP/RSLB !BC NRRlDORULPL4/BC NRRlDORULPL4/PM '

NAME FLyon JBurkhardt RFelts* MMarkley FLyon DATE 7/10/13 5/6113 4/13/13 7/12/13 7/12/13