MONTHYEARRA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)2012-07-13013 July 2012
[Table View]Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12) Project stage: Request NOC-AE-12002878, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 142012-07-17017 July 2012 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 14 Project stage: Request ML12214A2642012-07-25025 July 2012 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 Project stage: Request CP-201200875, Report of Changes to the Physical Security Plan (Revision 7)2012-07-26026 July 2012 Report of Changes to the Physical Security Plan (Revision 7) Project stage: Request ML12214A5812012-07-30030 July 2012 Associated ISFSIs - Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program Project stage: Request RBG-47269, Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan2012-08-0202 August 2012 Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Project stage: Request L-2012-305, Revision 15 to the Physical Security Plan, Cover Letter2012-08-0303 August 2012 Revision 15 to the Physical Security Plan, Cover Letter Project stage: Request ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 102012-08-0303 August 2012 Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10 Project stage: Request ML12219A2282012-08-0303 August 2012 Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 Project stage: Request ML12221A3362012-08-0808 August 2012 Draft RAI on Revision to Security Plan Project stage: Draft RAI ML12229A2872012-08-13013 August 2012 Security Plan, Revision 9 to the Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML12237A0772012-08-23023 August 2012 Draft Request for Information Email - Related to Physical Security Plant (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: Draft RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) Project stage: RAI ML12251A0472012-09-11011 September 2012 Request for Additional Information, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML12255A0742012-09-18018 September 2012 Request for Additional Information, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12286A3362012-10-0404 October 2012 (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan Project stage: Request ML12284A0182012-10-0505 October 2012 NRR E-mail Capture - (D91660) Request for Additional Information (RAI) Draft Questions Corporate Security Plans Submitted 7/30/2012 Project stage: Draft RAI ULNRC-05921, Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660)2012-10-18018 October 2012 Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660) Project stage: Response to RAI ML12296A0102012-10-19019 October 2012 NRR E-mail Capture - D91660 - Dominion Physical Security Plan - Request for Additional Information - This Message Is Publically Available and non-sensitive Project stage: RAI ML12296A9302012-10-23023 October 2012 Enclosudraft Request for Additional Information Project stage: RAI ML12305A0432012-10-29029 October 2012 Email Security-Related Request for Additional Information, Review of Revision 10 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12305A0192012-10-30030 October 2012 NRR E-mail Capture - FW: D91660 - NextEra Energy Duane Arnold Physical Security Plan - RAI - This Message Is Publically Available and non-sensitive Project stage: RAI ML12306A5462012-11-0101 November 2012 E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660) Project stage: RAI ML12292A3222012-11-0101 November 2012 Request for Additional Information Regarding Revision 9 to Security Plant, Training & Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installa Project stage: RAI ML12297A3602012-11-0101 November 2012 Request for Additional Information, Review of Revision 14 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: RAI ML12300A0372012-11-0505 November 2012 Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Project stage: RAI ML12300A3222012-11-0505 November 2012 Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12307A3692012-11-0707 November 2012 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML12310A0292012-11-16016 November 2012 Request for Additional Information Related to Physical Security Plan, Revision 16 Project stage: RAI ML12314A3562012-11-20020 November 2012 Request for Additional Information, Round 2, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12335A0112012-11-28028 November 2012 Response to Request for Additional Information Regarding Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 Project stage: Response to RAI ML12347A3022012-12-12012 December 2012 Email, Request for Additional Information on Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15, (TAC No. D91660) Project stage: RAI ML12341A1592012-12-18018 December 2012 Request for Additional Information Regarding Physical Security Plan, Training Qualifications Plan, and Safeguards Contingency Security Program Revision 15 Project stage: RAI ML13002A0352012-12-19019 December 2012 Response to Request for Additional Information Regarding Revision 9 to the Wolf Creek Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Response to RAI ML12356A2182012-12-21021 December 2012 Email, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (TAC No. D91660) Project stage: RAI ML13010A5522013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan Project stage: RAI ML13010A5512013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML13023A4072013-01-23023 January 2013 Request for Additional Information Email, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 7 Project stage: RAI ULNRC-05954, Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660)2013-01-28028 January 2013 Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660) Project stage: Response to RAI ML13029A7132013-01-29029 January 2013 Email, Request for Additional Information, Revision 13 to Physical Security, Safeguards Contingency, and Training and Qualification Plan (TAC No. D91660) Project stage: RAI ML13077A3372013-03-18018 March 2013 Email, Request for Additional Information, Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML13120A0832013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13120A0842013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13165A3442013-06-12012 June 2013 Revision 15 of the ANO Security Plan Project stage: Request ML13165A0842013-06-13013 June 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 21 (TAC No. D91660) Project stage: RAI ML13116A3702013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (TAC No. D91660) Project stage: Approval ML13116A0942013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9 (TAC No. D91660) Project stage: Approval ML13116A3912013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660) Project stage: Approval ML13120A2322013-07-18018 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revisions 14 and 15 (TAC D91660) Project stage: Approval ML13275A3102013-11-25025 November 2013 Cover Memo from Robert Caldwell to Robert Pascarelli, RAI for V C Summer Revision 10 Security Plan Review Project stage: RAI 2012-07-26 |
ML12220A353 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 08/03/2012 |
From: | Kiley M Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-2012-305 | |
Download: ML12220A353 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024
[Table view]Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25 |
Text
L SAFEGUARDS INFORMATION L-2012-305 10 CFR 50.4(b)(4) 10 CFR 50.54(p)(2) 10 CFR 73.22 10 CFR 2.390(d)(1)
August 3, 2012 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision 15 to the Physical Security Plan In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions of licenses," Florida Power & Light Company (FPL), the licensee for Turkey Point Nuclear Plant, Units 3 and 4, hereby submits Revision 15 to the "Florida Power &
Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program", collectively the PSP. Note that the PSP title has changed from the PSP title in License Condition 3.E of Renewed Facility Operating Licenses DPR-31 and DPR-41 for Units 3 and 4, respectively. FPL is planning to submit a license amendment request for administrative changes and will include the title change in the application.
Revision 15 incorporates changes resulting from incorporation of NEI 03-12, Revision 7 template language and subsequent Security frequently asked questions that have been reviewed and approved by the NRC. In addition, Revision 15 reflects several minor administrative items and clarifications. The effective date of Revision 15 will be no later than August 3, 2012.
The enclosures to this letter are the FPL Turkey Point Units 3 and 4 PSP, Revision 15 (Enclosure
- 1) which is safeguards information, and a change synopsis (Enclosure 2). FPL requests that be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1) because the information contained therein is security-related.
SAFEGUARDS INFORMATION (Enclosure 1 contains Safeguards Information. Upon separation this page is decontrolled.)
SAFEGUARDS INFORMATION Florida Power & Light Company Letter L-2012-305 Page 2 of 2 Revision 15 to the Physical Security Plan Should you have any questions regarding this submission, please contact Brent Rittmer (brent.rittmer@fpl.com), Manager, Security, at 305-246-6605 or Robert Tomonto (bob.tomonto@fpl.com), Licensing Manager, at 305-246-7327.
Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant
Enclosures:
- 2) Change Synopsis (Security-Related) cc: Regional Administrator, USNRC Region II (with enclosures)
Senior Resident Inspector, USNRC, Turkey Point (without enclosures)
SAFEGUARDS INFORMATION (Enclosure 1 contains Safeguards Information. Upon separation this page is decontrolled.)