L-2012-305, Revision 15 to the Physical Security Plan, Cover Letter

From kanterella
Jump to navigation Jump to search

Revision 15 to the Physical Security Plan, Cover Letter
ML12220A353
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/03/2012
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-305
Download: ML12220A353 (2)


Text

L SAFEGUARDS INFORMATION L-2012-305 10 CFR 50.4(b)(4) 10 CFR 50.54(p)(2) 10 CFR 73.22 10 CFR 2.390(d)(1)

August 3, 2012 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Re: Florida Power & Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revision 15 to the Physical Security Plan In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions of licenses," Florida Power & Light Company (FPL), the licensee for Turkey Point Nuclear Plant, Units 3 and 4, hereby submits Revision 15 to the "Florida Power &

Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program", collectively the PSP. Note that the PSP title has changed from the PSP title in License Condition 3.E of Renewed Facility Operating Licenses DPR-31 and DPR-41 for Units 3 and 4, respectively. FPL is planning to submit a license amendment request for administrative changes and will include the title change in the application.

Revision 15 incorporates changes resulting from incorporation of NEI 03-12, Revision 7 template language and subsequent Security frequently asked questions that have been reviewed and approved by the NRC. In addition, Revision 15 reflects several minor administrative items and clarifications. The effective date of Revision 15 will be no later than August 3, 2012.

The enclosures to this letter are the FPL Turkey Point Units 3 and 4 PSP, Revision 15 (Enclosure

1) which is safeguards information, and a change synopsis (Enclosure 2). FPL requests that be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1) because the information contained therein is security-related.

SAFEGUARDS INFORMATION (Enclosure 1 contains Safeguards Information. Upon separation this page is decontrolled.)

SAFEGUARDS INFORMATION Florida Power & Light Company Letter L-2012-305 Page 2 of 2 Revision 15 to the Physical Security Plan Should you have any questions regarding this submission, please contact Brent Rittmer (brent.rittmer@fpl.com), Manager, Security, at 305-246-6605 or Robert Tomonto (bob.tomonto@fpl.com), Licensing Manager, at 305-246-7327.

Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant

Enclosures:

1) FPL Turkey Point Units 3 and 4 PSP, Revision 15 (Safeguards Information)
2) Change Synopsis (Security-Related) cc: Regional Administrator, USNRC Region II (with enclosures)

Senior Resident Inspector, USNRC, Turkey Point (without enclosures)

SAFEGUARDS INFORMATION (Enclosure 1 contains Safeguards Information. Upon separation this page is decontrolled.)