==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71111.01 - Adverse Weather Protection | ==71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)== | ||
{{IP sample|IP=IP 71111.01|count=1}} | {{IP sample|IP=IP 71111.01|count=1}} | ||
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures. | The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures. | ||
==71111.04 - Equipment Alignment | ==71111.04 - Equipment Alignment Partial Walkdown (IP Section 02.01)== | ||
{{IP sample|IP=IP 71111.04|count=3}} | {{IP sample|IP=IP 71111.04|count=3}} | ||
Line 78: | Line 74: | ||
: (3) Unit 3 loss of power sequencer A, on March 22, 2019 | : (3) Unit 3 loss of power sequencer A, on March 22, 2019 | ||
==71111.05Q - Fire Protection | ==71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)== | ||
{{IP sample|IP=IP 71111.05Q|count=6}} | {{IP sample|IP=IP 71111.05Q|count=6}} | ||
Line 91: | Line 85: | ||
: (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019 | : (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019 | ||
==71111.06 - Flood Protection Measures | ==71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)== | ||
{{IP sample|IP=IP 71111.06|count=1}} | {{IP sample|IP=IP 71111.06|count=1}} | ||
Line 101: | Line 93: | ||
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019. | The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019. | ||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)== | ||
{{IP sample|IP=IP 71111.11Q|count=1}} | {{IP sample|IP=IP 71111.11Q|count=1}} | ||
Line 111: | Line 101: | ||
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator. | The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator. | ||
==71111.12 - Maintenance Effectiveness | ==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)== | ||
{{IP sample|IP=IP 71111.12|count=2}} | {{IP sample|IP=IP 71111.12|count=2}} | ||
Line 120: | Line 108: | ||
: (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019 | : (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019 | ||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control | ==71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)== | ||
{{IP sample|IP=IP 71111.13|count=3}} | {{IP sample|IP=IP 71111.13|count=3}} | ||
Line 130: | Line 116: | ||
: (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019 | : (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019 | ||
==71111.15 - Operability Determinations and Functionality Assessments | ==71111.15 - Operability Determinations and Functionality Assessments Sample Selection (IP Section 02.01)== | ||
{{IP sample|IP=IP 71111.15|count=6}} | {{IP sample|IP=IP 71111.15|count=6}} | ||
Line 143: | Line 127: | ||
: (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019 | : (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019 | ||
==71111.18 - Plant Modifications | ==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)== | ||
{{IP sample|IP=IP 71111.18|count=2}} | {{IP sample|IP=IP 71111.18|count=2}} | ||
Line 152: | Line 134: | ||
: (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019 | : (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019 | ||
==71111.19 - Post Maintenance Testing | ==71111.19 - Post Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)== | ||
{{IP sample|IP=IP 71111.19|count=4}} | {{IP sample|IP=IP 71111.19|count=4}} | ||
Line 163: | Line 143: | ||
: (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019 | : (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019 | ||
==71111.22 - Surveillance Testing | ==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: | ||
In Service Testing (IST) (IP Section 03.01)== | |||
In Service Testing (IST) (IP Section 03.01) | |||
{{IP sample|IP=IP 71111.22|count=1}} | {{IP sample|IP=IP 71111.22|count=1}} | ||
Line 176: | Line 154: | ||
: (3) 36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019 | : (3) 36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019 | ||
==71114.06 - Drill Evaluation | ==71114.06 - Drill Evaluation Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01) | ||
(see 71114.06 for sample guidance)== | |||
(see 71114.06 for sample guidance) | |||
{{IP sample|IP=IP 71114.06|count=1}} | {{IP sample|IP=IP 71114.06|count=1}} | ||
The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019. | The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019. | ||
==71114.08 - Exercise Evaluation Scenario Review | ==71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)== | ||
{{IP sample|IP=IP 71114.08|count=1}} | {{IP sample|IP=IP 71114.08|count=1}} | ||
Line 193: | Line 167: | ||
==RADIATION SAFETY== | ==RADIATION SAFETY== | ||
==71124.05 - Radiation Monitoring Instrumentation | ==71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)== | ||
{{IP sample|IP=IP 71124.05|count=1}} | {{IP sample|IP=IP 71124.05|count=1}} | ||
Line 238: | Line 210: | ||
* SAM-12 | * SAM-12 | ||
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment | ==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)== | ||
{{IP sample|IP=IP 71124.06|count=1}} | {{IP sample|IP=IP 71124.06|count=1}} | ||
Line 285: | Line 255: | ||
* Unit 3 Fuel Building Ventilation Exhaust System | * Unit 3 Fuel Building Ventilation Exhaust System | ||
==71124.07 - Radiological Environmental Monitoring Program | ==71124.07 - Radiological Environmental Monitoring Program Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)== | ||
{{IP sample|IP=IP 71124.07|count=1}} | {{IP sample|IP=IP 71124.07|count=1}} | ||
Line 307: | Line 275: | ||
* Essential Pipe Density Tunnel | * Essential Pipe Density Tunnel | ||
==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, | ==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)== | ||
{{IP sample|IP=IP 71124.08|count=1}} | {{IP sample|IP=IP 71124.08|count=1}} | ||
Line 376: | Line 342: | ||
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018. | The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018. | ||
==71152 - Problem Identification and Resolution | ==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)== | ||
{{IP sample|IP=IP 71152|count=2}} | {{IP sample|IP=IP 71152|count=2}} | ||
Revision as of 08:32, 15 November 2019
ML19122A295 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 04/30/2019 |
From: | O'Keefe N NRC/RGN-IV/DRP |
To: | Bement R Arizona Public Service Co |
References | |
IR 2019001 | |
Download: ML19122A295 (41) | |
Text
ril 30, 2019
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2019001, 05000529/2019001, 05000530/2019001, AND 07200044/2019001
Dear Mr. Bement:
On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3 and on April 12, 2019, discussed the results of this inspection with Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Neil F. OKeefe, Chief Project Branch D Division of Reactor Projects Docket Nos. 05000528, 05000529, 05000530, and 07200044 License Nos. NPF-41, NPF-51, NPF-74 Enclosure:
Inspection Report 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 w/attachments:
1. Supplemental Information 2. Information Request
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number(s): 05000528, 05000529, 05000530, and 07200044 License Number(s): NPF-41, NPF-51 and NPF-74 Report Number(s): 05000528/2019001, 05000529/2019001, 05000530/2019001, and 07200044/2019001 Enterprise Identifier: I-2019-001-0013 I-2019-001-0077 Licensee: Arizona Public Service Co.
Facility: Palo Verde Nuclear Generating Station and Independent Spent Fuel Storage Installation Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, Resident Inspector D. You, Resident Inspector R. Bywater, Resident Inspector R. Alexander, Senior Project Engineer L. Carson, Senior Health Physicist P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, PhD, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector J. O'Donnell, Health Physicist C. Alldredge, Allegations/Enforcement Specialist B. Baca, Health Physicist O. Masnyk Bailey, Health Physicist (Region I)
K. Warner, Health Physicist, (Region I)
Approved By: Neil OKeefe, Chief, Project Branch D, Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting baseline inspections at Palo Verde Nuclear Generating Station Units 1, 2, and 3 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
List of Findings and Violations No findings were identified.
Additional Tracking Items None.
PLANT STATUS
Units 1, 2, and 3 operated at or near full power for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme high temperatures.
71111.04 - Equipment Alignment Partial Walkdown (IP Section 02.01)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 3 containment spray system B, on January 24, 2019
- (2) Unit 3 diesel generators A and B jacket water cooling systems, on February 1, 2019
- (3) Unit 3 loss of power sequencer A, on March 22, 2019
71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 3 non-class switchgear and battery rooms, Fire Area TB4, on January 16, 2019
- (2) Unit 2 auxiliary feedwater A room, Fire Area 72, on January 17, 2019
- (3) Unit 1 auxiliary feedwater B room, Fire Area 73, on February 20, 2019
- (4) Unit 3 auxiliary feedwater A room, Fire Area 72, on March 22, 2019
- (5) Unit 1 auxiliary feedwater A room, Fire Area 72, on March 25, 2019
- (6) Unit 1 Class 1E switchgear B room, Fire Area 5B, on March 29, 2019
71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)
The inspectors evaluated internal flooding mitigation protections in the 80 and 100 elevations of the Unit 1, 2, and 3 main steam support structures on March 21, 2019.
Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)
The inspectors evaluated cable submergence protection in Unit 3 Bravo diesel fuel oil vault on March 1, 2019.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
The inspectors observed and evaluated Unit 3 control room operators during a maintenance activity to replace power switch assemblies for control element assembly 22 on February 12, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
The inspectors observed and evaluated a licensed operator continuing training simulator scenario on February 5, 2019. The inspectors assessed the performance of the operators and the control room simulator.
71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Unit 1 chemical and volume control system charging pump discharge pressure relief valve failures, on January 24, 2019
- (2) Unit 3 essential chilled water temperature control valve ECB-TV0030, on March 21, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 2 elevated risk during station blackout generator and high pressure safety injection pump A maintenance, on January 8, 2019
- (2) Unit 1 emergent work for main feedwater pump B mini-flow valve failure, on February 20, 2019
- (3) Unit 3 online risk during diesel generator A super outage, on March 5, 2019
71111.15 - Operability Determinations and Functionality Assessments Sample Selection (IP Section 02.01)
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Unit 3 spent fuel pool decrease in Boron-10 concentration, on January 25, 2019
- (2) Unit 3 control room essential air handing unit B temperature control valve response to handheld radio interference, on February 14, 2019
- (3) Units 1, 2, and 3 analysis of manual compensatory actions to maintain high pressure safety injection operability and availability during reactor water tank full flow recirculation evolutions, on February 20, 2019
- (4) Unit 2 reactor coolant pump vibration monitoring system, on February 22, 2019
- (5) Unit 2 operability of shutdown cooling loop 1 isolation valve SI-653, on March 21, 2019
- (6) Unit 3 pressurizer level control system tuning issues, on March 26, 2019
71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 1 diesel generator A crankcase breather ventilation piping modification DG-1153, on February 28, 2019
- (2) Station blackout generator 1 and 2 modification for permanently adjusting lube oil high pressure alarm set point, on March 20, 2019
71111.19 - Post Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)
The inspectors evaluated the following post maintenance tests:
- (1) Unit 3 control element assembly power switch assembly test following replacement, on February 12, 2019
- (2) Unit 3 diesel generator B fuel oil transfer pump test following terminal board replacement, on February 21, 2019
- (3) Unit 3 diesel generator A fast start following a diesel super outage, on March 8, 2019
- (4) Unit 3 safety injection valve 615 test following periodic maintenance, on March 19, 2019
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:
In Service Testing (IST) (IP Section 03.01)==
77ST-9EW01, Unit 1 essential cooling water A inservice pump test, on January 31, 2019
Surveillance Testing (IP Section 03.01) (3 Samples)
- (1) Unit 3 diesel generator A 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> surveillance and hot restart, on January 7, 2019
- (2) 77ST-9SB19, Unit 1 core protection calculator system channel C functional test, on January 8, 2019
- (3) 36ST-9SA02, Unit 1 engineered safety features actuation system train B subgroup relay functional testing, on February 21, 2019
==71114.06 - Drill Evaluation Drill and/or Simulator-Based Licensed Operator Requalification Training (IP Section 02.01)
(see 71114.06 for sample guidance)==
The inspectors evaluated a dress rehearsal drill that required emergency facilities to respond to a fire in a diesel generator room, a steam generator tube rupture, and a steam line break on February 5, 2019.
71114.08 - Exercise Evaluation Scenario Review Inspection Review (IP Section 02.01 - 02.04)
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on February 11, 2019. This review did not constitute approval of the scenario.
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)
The inspectors evaluated the calibration and testing program implementation.
Alarm set point and calibration method check of personnel contamination monitors, portal monitors and small article monitors:
- iPCM-12
- SAM-12 Failure to meet calibration or source check acceptance criteria:
- SAC-4
- PNR-4
- MGTM
Walk Downs and Observations (IP Section 02.01) (1 Sample)
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspector observed the following:
Portable survey instruments:
- BC-4
- SAC-4
- RM-20 (multiple)
- FH40GL
- CM-11 Source check demonstration:
- RM-20
- FH40GL
- SAM-12 Area radiation monitors and continuous air monitors:
- RU-1
- RU-2
- RU-3
- RU-8
- RU-12
- RU-15
- RU-16
- RU-33
- RU-34
- RU-37
- RU-140
- RU-142A-D
- RU-149
- RU-152A
- RU-155D
- RU-158D Personnel contamination monitors, portal monitors and small article monitors:
- iPCM-12
- PCM-12
- SAM-12
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
- RU-12, Unit 1 Waste Gas Decay Tank Monitor Calibration
- RU-144, Unit 1 Plant Vent Monitor High Calibration
- RU-143, Unit 2 Plant Vent Monitor Low Calibration
- RU-145, Unit 2 Fuel Building B Vent Exhaust Monitor Low Calibration
- RU-143, Unit 3 Plant Vent Monitor Low Calibration
- RU-146, Unit 3 Fuel Building B Vent Exhaust Monitor High Calibration Dose Calculations (IP Section 02.05) (1 Sample):
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
- Permit 20172058, Unit 2 Refueling Purge
- Permit 20182030, Unit 2 Plant Vent
- Permit 20182103, Unit 2 Fuel Building Vent
- Permit 20181142, Unit 1 Plant Vent
- Permit 20181145, Unit 1 Fuel Building Vent
- Permit 20191015, Unit 1 Fuel Building Vent
- Permit 20192013, Unit 2 Plant Vent
- Permit 20192015, Unit 2 Fuel Building Vent The inspectors also reviewed the following annual radiological effluent release reports:
- 2017 Annual Radioactive Effluent Release Report Abnormal gaseous or liquid tank discharges:
- CR-2018-14265, Oily Waste Separator Tank Overflow
Instrumentation and Equipment (IP Section 02.04) (1 Sample)
The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
- STWO 4777407, Unit 1 Containment Building Purge Air Filtration Unit
- STWO 4813386, Unit 2 Fuel and Aux Building Essential Air Filtration Unit
- STWO 4836778, Unit 1 Fuel and Aux Building Essential Air Filtration Unit
- STWO 4866355, Unit 3 Fuel and Aux Building Essential Air Filtration Unit
Sampling and Analysis (IP Section 02.03) (1 Sample)
The inspectors reviewed the following radioactive effluent sampling and analysis activities:
- RU-145, Unit 3 Fuel Building Radiation Monitor Filter Change out and Gas Grab Sample
- RU-143, Unit 2 Plant Ventilation Radiation Monitor Filter Change out and Gas Grab Sample
- Unit 2 Primary to Secondary Sampling Effluent discharges:
- Unit 3 Fuel Building Vent Gas Effluent Discharge Permit
- Unit 2 Plant Vent Gas Effluent Discharge Permit
Walk Downs and Observations (IP Section 02.01) (1 Sample)
The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
- Unit 2 Plant Vent Radiation Monitoring System
- Unit 3 Plant Vent Radiation Monitoring System
- Unit 3 Fuel Building Radiation Monitoring System
- Unit 3 Fuel Building Ventilation Exhaust System
71124.07 - Radiological Environmental Monitoring Program Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)
The inspectors evaluated the licensee's groundwater monitoring program.
Site Inspection (IP Section 02.01) (1 Sample)
The inspectors evaluated the radiological environmental monitoring program implementation.
Walkdowns and calibration and maintenance record review:
- Air Sampling Station Site 4 The inspectors observed the following environmental sample collections and preparation:
- Sites 4, 6A, 7A, 14A, 15, 17A, 21, 29, 35, and 40
- Goat milk Licensee actions in response to missed sample, inoperable sampler, lost thermoluminescent detector (TLD) or anomalous measurement:
- Air Sample Site 6A
- Milk Sample Site 53
- TLD Site 16 Sampling program for the potential of licensed material entering groundwater
- Reactor Water Makeup Tank
- Reactor Water Tank
- Holdup Tank
- Essential Pipe Density Tunnel
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)
The inspectors evaluated radioactive material storage in the follow areas:
- Dry Active Waste Processing and Storage (DAWPS) Facility
- Low Level Radioactive Materials Storage Facility (LLRWSF)
Container check (e.g., swelling, leakage and deformation):
- 10-4191 Main Steam Safety Valve container
- 12-0197 Main Steam Safety Valve container
- 14-210H Shipping Cask
- 17-1-044 55 gallon drum of In Core Instruments (ICI's)
- 17-1-045 55 gallon drum of ICIs
- 17-1-046 55 gallon drum of ICIs
- 18-3-097 Sealand Dry Active Waste (DAW)
- 19-2-004 Sealand DAW
- 19-2-007 Intermodal Asphalt
- 19-2-008 Intermodal Asphalt
- 19-3-006 Sealand DAW Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)
The inspectors evaluated the following radioactive waste processing systems and processes during plant walkdowns.
Liquid or solid radioactive waste processing systems:
- Dry Active Waste Processing and Storage (DAWPS) Facility
- Low Level Radioactive Materials Storage Facility (LLRWSF)
Radioactive waste resin and/or sludge discharges processes:
- High Integrity Container Receipt, Handling, Use, and Closure
- Self-Engaging Rapid Dewatering Systems (SERDS) Operation
Shipment Preparation (IP Section 02.04) (1 Sample)
The inspectors were not able to evaluate and observe radioactive material shipment preparation processes as no shipments were in process. However, the inspectors reviewed several shipment packages that included surveys, pictures, and assessments in preparation for shipment.
Shipping Records (IP Section 02.05) (1 Sample)
The inspectors evaluated the following non-excepted package shipment records:
- 17-SH-036
- 17-SH-068
- 18-RW-026
- 18-RW-028
- 18-RW-034
- 18-SH-018
- 18-SH-062 Waste Characterization and Classification (IP Section 02.03) (1 Sample)
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
- Dry Active Waste streams for Unit 1 (Sample ID: 1-17-042),
Unit 2 (Sample ID: 2-17-014), and Unit 3 (Sample ID: 3-18-040)
- Filter analysis associated with shipping packages 18-RW-026 and 18-RW-028
- Unit 2 waste oil analysis (Sample ID: 2-18-037)
- Resin analysis associated with shipping package 18-SH-062
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018 IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03)
(3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018 MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (3 Samples)
Units 1, 2, and 3, January 1, 2018-December 31, 2018
Drill/Exercise Performance (IP Section 02.12) (1 Sample)
The inspector reviewed data for the Drill/Exercise Performance indicator for the period January 1, 2018, through December 31, 2018.
ERO Drill Participation (IP Section 02.13) (1 Sample)
The inspector reviewed data for the ERO Participation Performance indicator for the period January 1, 2018, through December 31, 2018.
Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
The inspector reviewed data for the Alert and Notification Performance indicator for the period January 1, 2018, through December 31, 2018.
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Units 1 and 3 control element drive mechanism control system power switch assembly failures
- (2) Unit 1 balance of plant engineered safety features actuation system train A troubleshooting, and replacement of the train A engineered safety features load sequencer module
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)
An ISFSI inspection was conducted at PVNGS on March 19-21, 2019, by inspectors from Region I, Division of Nuclear Materials Safety. The PVNGS ISFSI was licensed as a general 10 CFR Part 72 licensee. The licensee had been utilizing the NAC, Universal Multi-Purpose Canister system (UMS), approved under Certificate of Compliance (CoC) 72-1015, Amendment 5, and NAC UMS Final Safety Analysis Report (FSAR), Revision 11, to load and store spent fuel at their ISFSI. At the time of the on-site inspection, PVNGSs ISFSI pad contained 152 NAC ventilated concrete casks (VCCs), each containing the steel Transportable Storage Container (TSC) with a capacity for 24 pressurized water reactor (PWR) spent fuel assemblies. The last routine ISFSI inspection was performed in March 2017 (ADAMS Accession No. ML17130B002).
Under the provisions of 10 CFR 72.210 and 10 CFR 72.212, PVGNS has decided to adopt and utilize a different storage system to store spent fuel casks at their ISFSI. The licensee has elected to utilize the NAC, Magnastor System under CoC 72-1031, Amendment 7, and FSAR Revision 10. The Magnastor TSC has the capacity to store 37 PWR spent fuel assemblies in each VCC.
The purpose of the inspection was to observe and evaluate the licensees pre-operational testing and training exercises required to be performed by a general licensee prior to use of the system to load spent fuel assemblies. The NAC Magnastor CoC 72-1031, Appendix A, Technical Specification (TS) 5.8 contains a list of loading, closure, handling, unloading, and transfer operations that are required to be performed. During the inspection the NRC inspectors observed PVNGS perform the following demonstrations from TS 5.8 (c): closing and sealing of the TSC to demonstrate welding; weld inspection and documentation; and leak testing. PVNGS still has a number of demonstrations that are required to be completed before the licensee can utilize the Magnastor system. Those demonstrations are projected to be performed in the summer of 2019.
The ISFSI activities specifically reviewed during the on-site inspection:
- (1) Evaluated and observed dry run operations which included welding, weld inspection and documentation, and leak testing in accordance with TS 5.8 (c).
- (2) Reviewed welder qualification program, welder performance qualifications, welding procedure specifications, and welding procedure qualification records.
- (3) Reviewed NDE program procedure, NDE personnel certification records, the qualification program for visual test and liquid penetrant exams, liquid penetrant procedure, visual testing procedure, and helium leak testing procedure.
- (4) Review Certified Material Test reports for liquid penetrant chemicals and welder filler metals.
- (5) Evaluated and observed licensees radiation protection implementation during the dry run observations.
- (6) Evaluated and observed licensees implementation of foreign material exclusion program during welding demonstrations.
The inspectors did not identify any issues of concern requiring documentation.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On February 8, 2019, the inspector presented the baseline radiation safety inspection results to Mr. J. Cadogan, Senior Vice President of Site Operations, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
On March 21, 2019, the inspectors presented the results from the ISFSI pre-operational welding demonstration inspection to Ms. Maria Lacal, Senior Vice President of Regulatory Oversight, and other members of the licensee staff. Licensee personnel acknowledged the information presented. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
On April 12, 2019, the inspector presented the quarterly resident inspector inspection results to Mr. Jack Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff. The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
DOCUMENTS REVIEWED
71111.01Adverse Weather Protection
Procedures
Number Title Revision
40OP-9ZZ19 Hot Weather Protection 7
40OP-9HS01 Site Building HVAC 16
Calculations
Number Title Revision
13-MC-SP-0307 SP/EW System Thermal Performance Design Bases 9
Analysis
71111.04Equipment Alignment
Condition Reports
17-02911
Work Orders
2711244 2781196
Procedures
Number Title Revision
40OP-9DG01 Emergency Diesel Generator A 79
40ST-9SI13 Train A LPSI and CS System Alignment Verification 36
Drawings
Number Title Revision
13-M-DGP-0001 P & I Diagram Diesel Generator System 61
71111.05AQFire Protection Annual/Quarterly
Miscellaneous Documents Revision
Number Title or Date
PVGS Pre-Fire Strategies Manual 26
13-MC-ZA-0808 MSSS Flooding At Elevation 81 6
Fire Protection Database Detailed Report 05/09/1998
PVNGS Safety Evaluation Report
71111.06Flood Protection Measures
Condition Reports
19-02890 19-02658 19-02418 19-02625
Procedures
Number Title Revision
40DP-9OPA3 Auxiliary Building Station Rounds 84
40AL-9RK2B Panel B02B Alarm Response 59
40OP-9RD01 Radwaste Facility Sumps and Drains 19
Drawings
Number Title Revision
01-M-RDP-002 Radioactive Waste Drain System 14
2-M-RDP-002 Radioactive Waste Drain System 18
03-M-RDP-002 Radioactive Waste Drain System 13
Miscellaneous Documents Revision
Number Title or Date
Pre-Fire Strategies Manual 26
13-MC-ZA-0808 MSSS Flooding at Elevation 81 6
PO EDC-2019- Revise Calculation 13-MC-ZA-0808 03/01/2019
00144
71111.11Licensed Operator Requalification Program and Licensed Operator Performance
Procedures
Number Title Revision
40DP-9OP02 Conduct of Operations 72
01DP-0AP57 Management of Critical Evolutions and Infrequently 2
Performed Test or Evolutions
Miscellaneous Documents
Number Title Date
Licensed Operator Continuing Training Simulator 02/05/2019
Evaluation Scenario
71111.12Maintenance Effectiveness
Condition Reports
18-16615 18-02240 18-01811 19-02330 19-02133
18-10880 18-10879 19-02364
Work Orders
4441828 4441462
Miscellaneous Documents
Number Title Date
19-02330-006 Engineering Evaluation 02/21/2019
Palo Verde Maintenance Rule Database
71111.13Maintenance Risk Assessments and Emergent Work Control
Condition Reports
16-15545
Procedures
Number Title Revision
40DP-9RS01 Operations Department Online Nuclear Risk 4
Management in Modes 1 and 2
70DP-0RA05 Assessment and Management of Risk When Performing 23
Maintenance
40DP-9AP21 Protected Equipment 7
Miscellaneous Documents
Number Title Date
EOOS 4.1 Schedulers Evaluation for Palo Verde Unit 1 02/21/2019 09:41
EOOS 4.1 Schedulers Evaluation for Palo Verde Unit 3 03/05/2019
71111.15Operability Determinations and Functionality Assessments
Condition Reports
18-16665 17-04204 18-18476 19-02567 19-02330
19-01290 18-17794 19-01962 19-01941 14-00853
19-04380 19-04382
Work Orders
5071741
Procedures
Number Title Revision
40DP-9OP26 Operations Condition Reporting Process and Operability 46
Determination / Functionality Assessment
73DP-0EE05 Engineering Preventive Maintenance Program 0
Procedures
Number Title Revision
40OP-9SV01 Loose Parts and Vibration Monitoring 14
73TI-9ZZ35 Ultrasonic Examination of Reactor Coolant Pump Shafts 7
31MT-9RC23 Reactor Coolant Pump Sulzer Bingham Seal 38
Replacement
40TI-9SF01 Pressurizer Level Control System Tuning 0
Miscellaneous Documents Revision
Number Title or Date
18-17794-004 Level 2 Cause Analysis Report 0
TR-100491 EPRI: UPS Maintenance and Application Guide
Design Basis Manual: Safety Injection System 38
CRAI 3245187 Evaluation of the Class-1E and PK Inverters and
Associated Subcomponents
CRDR 3300933 10 Year SCR Replacement for PN and PK Inverters
RCTSAI 4524360 RCP Vibration Monitoring 04/17/2014
RCTSAI 4524358 RCP Shaft Ultrasonic Inspection Following Seal 04/17/2014
Replacement
RCTS 4524352 RCP Vibration Monitoring and Shaft UT Inspections 04/18/2014
PVAR 4524366 Actions for License Amendments 84, 72, and 56 04/17/2014
71111.18Plant Modifications
Condition Reports
16-19472 19-02927 14-00965 18-04376
Work Orders
3094267 4805058
Miscellaneous Documents
Number Title Revision
S-19-0005 10 CFR 50.59 Screening/Evaluation 0
18-04376-004 Design Equivalent Change Package: TMOD SBOG#! 0
Lube Oil High Pressure Alarm Set point Schedule
Adjustment
71111.19Post Maintenance Testing
Condition Reports
16-03732 19-03482 19-04033
Work Orders
5103635 4945749 4498502 4507037 4752532 5055992 5076980
4960255 5085998
Procedures
Number Title Revision
40OP-9DG01 Emergency Diesel Generator A 79
40OP-9DF01 Diesel Fuel Oil Storage and Transfer 43
73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 28
40OP-9SF01 Control Element Drive Mechanism Control System 30
(CEDMCS) Operation
71111.22Surveillance Testing
Work Orders
4802907 4936283 4937964 4940893
Procedures
Number Title Revision
36ST-9SA02 ESFAS Train B Subgroup Relay Functional Test 47
40ST-9DG01 Diesel Generator A Test 50
73ST-9DG07 Class 1E Diesel Generator Load Rejection 24 Hour 10
Rated Load And Hot Start Test Train A
77ST-9SB19 CPCS Channel C Functional Test 12
73ST-9EW01 Essential Cooling Water Pumps - Inservice Test 33
71114.06Drill Evaluation
Miscellaneous Documents
Number Title Date
1901 Dress Rehearsal Controller Guide
TSC - Position Log 02/05/2019
Significant Events Log 02/05/2019
Form EP-0541 Palo Verde NAN Emergency Message Form
71124.05Radiation Monitoring Instrumentation
Procedures
Number Title Revision
74DP-9CY08 Radiological Monitoring Program 25
Procedures
Number Title Revision
74ST-9SQ23 Radiation Monitoring Calibration Test for New Scope Area 18
Monitors
74ST-9SQ33 Radiation Monitoring Calibration Test for Main Steam Line 1
Monitors
75RP-9EQ04 Calibration of the Eberline PNR-4 Neutron Dose Rate 9
Instrument
75RP-9EQ13 Canberra Whole Body Counting System Calibration 5
75RP-9EQ31 Calibration, Response Check and Operation of the SAM-12 4
Small Article Monitor
75RP-9EQ47 Calibration of the Eberline Model HP Series Frisker Probes 1
75RP-9EQ66 Calibration of the Thermo Scientific Model RO-20 1
Ion Chamber Survey Meter
75RP-9ME05 Scaler Counting Systems Performance Checks 20
Audits and Self-Assessments
Number Title Date
2Q 2017 Integrated Performance Assessment Report: 09/14/2017
Radiation Protection Department
2018-001 Audit Plan and Report: Chemistry 04/06/2018
218-04312 2017 Annual Radiation Protection Program Summary Report 07/11/2018
2018-007 Audit Plan and Report: Radiation Safety 12/14/2018
Condition Reports
17-01400 17-02247 17-08311 17-11014 17-13020
17-13492 17-15582 17-17353 18-02590 18-09583
Portable Instrumentation Calibration Data Sheet
Number Title Date
4380 PNR-4/NRD-1 Calibration Data Sheet 07/10/2018
8143 RO-20 Meter Data Sheet 09/07/2018
2708085 DRM 1/2 Calibration Data Sheet 10/01/2018
2914/12818 AMS-4 Calibration Data Sheet 10/09/2018
RAS-1 Air Sampler Calibration Data Sheet 10/19/2018
1182 RM-20 Count Rate Meter Data Sheet 01/04/2019
2927 FH 40 GL Internal Detector Calibration Data Sheet 01/15/2019
Portable Instrumentation Calibration Data Sheet
Number Title Date
11499 FHZ 612 Teleprobe Detector Calibration Data Sheet 01/24/2019
Stationary Radiation Instrument Calibration Records
Number Title Date
668 Small Article Monitor Calibration Data Sheet 09/18/2018
FastScan2 Calibration Verification Data Sheet 01/16/2019
364 BC-4 Instrument Calibration Data Sheet 01/22/2019
2983 3030P Calibration Data Sheet 01/23/2019
24 CM-11 Calibration Data Sheet 01/24/2019
213 PM-12 Calibration Cover Sheet 01/31/2019
2020 iPCM-12 Calibration Cover Sheet 02/05/2019
Calibration Source Records
Number Title Date
N997-0358 Kaman Report of Calibration Model KDA-HR High Range 01/23/1980
Area Monitor Ion Chamber Detector
8143 Shepherd Model 89 Verification Sheet 10/14/2018
940521 CDM-21 Calibrator Verification Report 10/24/2018
Work Order Records
Number Title Date
4980211 74ST9SQ343 Radiation Monitoring Calibration Test for 03/08/2018
Waste Gas Decay Tank RMC Monitor (Unit 3) RU-12
4867547 74ST9SQ333 Radiation Monitoring Calibration Test for Main 04/23/2018
Steam Line Monitors. (Unit 3) (RU-139/140)
4889856 "B" CTMT Build Refueling Purge Exhaust Monitor (Unit 1 07/25/2018
RU-34)
4898443 Personnel IARM A-Side (Unit 1 RU-155D) 08/28/2018
4948127 "A" Essential Cooling Water Radiation Monitor (Unit 3 RU-02) 09/13/2018
4911530 74ST9SQ232 Radiation Monitoring Calibration Test for 10/23/2018
Baseline Area Monitors (Unit 2 RU-148-151)
Miscellaneous Documents
Number Title Date
LS-6500 (U1, U2, & U3) QC: Observed Source Response - dpm 2018
U1 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM 2018
Miscellaneous Documents
Number Title Date
U2 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM 2018
U3 MCA Detectors 1, 2, & 3 QC: 88 and 1332 keV Activity and 1332 keV FWHM 2018
237-03041-CAS 2nd Quarter 2018 Chemistry Hot Cross Checks 07/27/2018
237-03046-CAS 4th Quarter 2018 Chemistry Hot Cross Checks 01/22/2019
71124.06Radioactive Gaseous and Liquid Effluent Treatment
Procedures
Number Title Revision
74AL-9SQ01 Radiation Monitoring Systems Alarm Validation and Response 001
74RM-9EF20 Gaseous Radioactive Release Permits and Offsite Dose 018
Assessment
74RM-9EF23 Secondary System Liquid Discharge 016
74RM-9EF40 Radiation Monitoring System Operations 012
74RM-9EF41 Radiation Monitoring System Alarm Response 023
74RM-9EF42 Radiation Monitor Alarm Setpoint Determination 033
74RM-9EF43 Actions for Non-Functional Radiation Monitors: Preplanned 017
Alternate Sampling Program
74RM-9EF60 RMS Sample Collection 032
74RM-9EF63 RU-143 Sample Operations 001
74RM-9EF65 RU-145 Sample Operations 000
74RM-9EF80 RMS/Effluent Action Documentation 006
75RM-9EF01 Determination of Primary-to-Secondary Leak Rate 000
Audits and Self-Assessments
Number Title Date
17-11047-003 Radiological Monitoring Program 09/07/2017
2018-001 Nuclear Assurance Department (NAD): Chemistry 04/06/2018
2018-04312 2017 Annual Radiation Protection Program Summary 07/11/2018
Report
2018-007 Nuclear Assurance Department (NAD): Radiation Safety 12/14/2018
Condition Reports
16-02244 17-0299 17-01573 17-01926 17-05289
17-07961 17-11047 17-11559 17-13603 17-17884
18-02621 18-04140 18-04530 18-06915 18-08466
18-09004 18-11148 18-12193 18-13299 18-14265
18-14342 18-17591 19-00212 19-01531
Effluent Monitor Calibration Records
Number Title Date
STWO 04715454 RU-145 Unit 2 Fuel Building B Vent Exhaust Monitor Low 02/22/2017
STWO 04736183 RU-143 Unit 3 Plant Vent Monitor Low 04/22/2017
STWO 04760261 RU-146 Unit 3 Fuel Building B Vent Exhaust Monitor High 05/10/2017
Calibration
STWO 04863095 RU-144 Unit 1 Plant Vent Monitor High 09/15/2017
STWO 04980503 RU-12 Unit 1 Waste Gas Decay Tank Monitor 03/19/2018
STWO 04904815 RU-143 Unit 2 Plant Vent Monitor Low 09/20/2018
Air Cleaning System Surveillance Test Records
Number Title Date
STWO 4777407 Unit 1 Containment Building Purge Air Filtration Unit 09/06/2017
STWO 4813386 Unit 2 Fuel and Aux Building Essential Air Filtration Unit 12/21/2017
STWO 4836778 Unit 1 Fuel and Aux Building Essential Air Filtration Unit 02/09/2018
STWO 4866355 Unit 3 Fuel and Aux Building Essential Air Filtration Unit 05/29/2018
Gaseous Discharge Permits
Number Title Date
20172058 Unit 2 Refueling Purge 05/02/2017
20182030 Unit 2 Plant Vent 03/15/2018
20182103 Unit 2 Fuel Building Vent 09/11/2018
20181142 Unit 1 Plant Vent 11/08/2018
20181145 Unit 1 Fuel Building Vent 11/20/2018
20191015 Unit 1 Fuel Building Vent 01/29/2019
20192013 Unit 2 Plant Vent 01/31/2019
20192015 Unit 2 Fuel Building Vent 02/05/2019
Counting Detector Calibrations
Number Title Date
GMAR4L HpGE Geometry - Unit 3 4500 cc gas Marinelli beaker 01/14/2016
PFIL1 HpGE Geometry - Unit 1 Particulate filer on shelf 1 07/20/2016
CCART1 HpGE Geometry - Unit 1 F&J cartridge on shelf 1 07/22/2016
CP1001 HpGE Geometry - Unit 2 CP100 charcoal face down shelf 1 11/21/2017
GMAR1L HpGE Geometry - Unit 1 Gas 1L Marinelli beaker on detector face 12/08/2017
GVIAL1 HpGE Geometry - Unit 2 9.2 cc gas vial shelf 1 12/14/2017
Miscellaneous Documents
Number Title Date
Palo Verde Generating Station Daily Status Report 02/5-8/2019
Miscellaneous Documents
Number Title Date
Offsite Dose Calculation Manual (ODCM) Palo Verde 03/24/2016
Nuclear Generating Station Units 1, 2, and 3
RCTSAI 1566 2016 Annual Radioactive Effluent Release Report 04/15/2017
2-17-014 Waste Stream Report: Unit 2 Dry Active Waste 04//18/2017
1-17-042 Waste Stream Report: Unit 1 Dry Active Waste 10/28/2017
3-18-040 Waste Stream Report: Unit 3 Dry Active Waste 04/15/2018
RCTSAI 1566 2017 Annual Radioactive Effluent Release Report 04/25/2018
71124.07Radiological Environmental Monitoring Program
Procedures
Number Title Revision
74RM-0EN02 Radiological Environmental Air Sampling 21
74RM-0EN03 Radiological Environmental Sampling 33
74RM-0EN05 Environmental TLD Exchange/Reporting 15
74RM-0EN07 Land Use Census 14
Audits and Self-Assessments
Number Title Date
Integrated Performance Assessment Report - Radiation 06/22/2017
Protection Department Quarter #1
Integrated Performance Assessment Report - Radiation 09/14/2017
Protection Department Quarter #2
Integrated Performance Assessment Report - Radiation 12/19/2017
Protection Department Quarter #3
Integrated Performance Assessment Report - Radiation 03/09/2018
Protection Department Quarter #4
218-04312 Annual Radiation Protection Program Summary Report 07/11/2018
Integrated Performance Assessment Report - Radiation 08/15/2018
Protection 1st Half 2018
SWMS Groundwater Protection Initiative NEW 07-07 12/06/2018
No. 15-04023-003
2018-007 Nuclear Assurance Department (NAD) Audit Plan and 12/14/2018
Report - Radiation Safety
Condition Reports
17-00760 17-01085 17-01203 17-01859 17-03281
17-03798 17-04052 17-04054 17-04212 17-04747
17-06259 17-07102 17-07269 17-08535 17-10101
17-10463 17-10476 17-10693 17-15048 17-17823
Condition Reports
17-18260 18-00109 18-00633 18-01069 18-01383
18-01500 18-01583 18-03310 18-04530 18-06018
18-10111 18-10649 18-10739 18-11127 18-11210
18-12934 18-14265 18-15019
Groundwater Protection Documents Revision
Number Title or Date
75DP-9AP01 Ground Water Protection Program 0
SWMS No. Groundwater Protection Initiative NEI 07-07 12/06/2018
15-04023-003
Meteorological Calibration Records
Number Title Date
WO 4905809 Met System Redundant Cab 12/12/2017
WO 4905809 Met System Primary Cab A 11/06/2017
WO 4988254 Met System Calibration (Primary System) 10/10/2018
WO 4988280 Met System Calibration (Redundant System) 10/10/2018
Miscellaneous Documents
Number Title Date
2016 Annual Radiological Environmental Operating Report 04/14/2017
2017 Annual Radiological Environmental Operating Report 04/10/2018
71124.08Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation
Procedures
Number Title Revision
75RP-9RP15 Control and Storage of Radioactive Material and Radioactive 30
Wastes
76DP-0AP12 Low Level Radioactive Material Storage Facility Overview 3
76-DP-0RP01 Radioactive Waste Management Program Overview 7
76-DP-0RP03 Radwaste Process Control Program 9
76-RP-0RW03 Waste Stream Sampling and Database Maintenance 2
76-RP-0RW05 Packaging and Classification of Radioactive Waste 6
76-RP-0RW06 Packaging of Radioactive Material 5
76-RP-0RW07 Shipping Radioactive Materials 16
76-RP-0RW08 High Integrity Container Receipt, Handling, Use, and Closure 4
76-RP-0RW09 Transfer, Storage and Processing of Radioactive Filters 8
Procedures
Number Title Revision
76-RP-0RW10 Handling and Storage of Radioactively Contaminated 3
Chemical Waste and Mixed Waste
76-RP-0RW82 Self-Engaging Rapid Dewatering System (SERDS) 4
Operation
91-DP-0EN50-02 Waste Stream Characterization Administrative Guideline 0
Audits and Self-Assessments
Number Title Date
202 NUPIC Audit: WMG, Inc. 03/18/2016
24365 NUPIC Audit: Energy Solutions 12/04/2017
2017-002 NAD Audit: Procurement and Material Control 05/05/2017
2018-007 NAD Audit: Radiation Safety 12/14/2018
2-03734 January 2018 Offsite Safety Review Committee Meeting 18-001, 01/26/2018
Operations, Chemistry and Radiation Protection Subcommittee
Report
Shipping Packages
17-RW-004 17-SH-036 17-SH-055 17-SH-068 18-RW-009
18-RW-020 18-RW-022 18-RW-026 18-RW-028 18-RW-034
18-SH-018 18-SH-062
Condition Reports
17-02737 17-04797 17-12153 17-13693 17-17333
17-18114 18-00790 18-03801 18-07057
Surveys
Survey Number Title Date
0-M-20190110-1 DAWPS Processing Area Monthly Survey 01/10/2019
0-M-20190110-3 LLRMSF Monthly Survey 01/10/2019
0-M-20190102-2 DAWPS Monthly Yard Survey 01/10/2019
0-M-20190123-1 DAWPS Storage Area Monthly Routine Survey 01/23/2019
Sample Analyses
Type Sample ID Date
Unit 1 DAW 1-17-042 12/28/2018
Unit 2 DAW 2-17-014 12/28/2018
Unit 3 DAW 3-18-040 12/28/2018
Unit 2 Oil 2-18-037 09/01/2017
Miscellaneous Documents
Number Title Date
NBA11C000113 Radiation Protection Technician Training 08/14/2018
Program: Packaging Radioactive Material
NBA19C000109 Radiation Protection Technician Training 07/31/2015
Program: Shipping Radioactive Material
2016 Annual Radioactive Effluent Release Report 04/15/2017
2017 Annual Radioactive Effluent Release Report 04/15/2018
Employee Training Records: Shipping Radioactive 03/31/2017 and
Material 08/11/2017
Waste Control Specialist Generator Certification 11/03/2017 and
Approval Letter 09/07/2018
71151Performance Indicator Verification
Miscellaneous Documents
Number Title Revision
NEI 99-02 Regulatory Performance Indicator Document 7
71152Problem Identification and Resolution
Condition Reports
19-00802 18-18324 18-19112 18-15793 18-18212
19-02376 19-02956 19-03063
Work Orders
4481512 5101889
Procedures
Number Title Revision
36ST-9SA05 FBEVAS, CREFAS, and CRVIAS 18 month Functional 24
Test
40OP-9SA01 BOP ESFAS Modules Operation 32
40OP-9SA02 De-Energization of BOP ESFAS 25
40AL-9RK5A Panel B05A Alarm Response 2
40DP-9OP06 Operations Department Repetitive Task Program 130
Drawings
Number Title Revision
01-E-SAB-004 Elementary Diagram ESF Actuation System BOP- 1
ESFAS Intertying Circuits Train A & Train B
Miscellaneous Documents
Number Title Revision
4OA5Other Activities (IP 60854)
Condition Reports
19-04069
Procedures
Number Title Revision
GQP 9.0 PCI Training, Qualification, Examination, and 20
Certification of NDE Personnel
GQP 9.1 PCI Training, Qualification, Examination, and 6
Certification of Inspection and Testing Personnel
GQP 9.2 PCI High Temperature Liquid Penetrant Examination 10
and Acceptance Standards for Welds
GQP 9.7 PCI Liquid Penetrant Examination and Acceptance 19
Standards for Welds (40 - 125 degrees F)
GQP 9.6 PCI Visual Examination of Welds 18
75DC-9SF02 Radiation Protection for Magnastor 0
PI-CNSTR-OP-PV- Closure Welding of Magnastor Canisters for PV 1
NMS-01
30DP-9MP23 Foreign Material Exclusion Controls 6
MSLT-PCI-PV Helium Mass Spectrometer Leak Test Procedure 4108-0
Design Basis Documents
Number Title Revision
ISFSI FSAR NAC Magnastor Final Safety Analysis Report 10
CoC 1031 CoC and Technical Specifications for Magnastor Amendment 7
System
Miscellaneous Documents Revision
Number Title or Date
Q-16A Leak Test Specialist NDE LT Level III Personnel 09/19/2018
Certificate
SAP #27044 PCI NDE VT/PT Level II Personnel Certificate 01/15/2019
CMTRs Spotcheck Penetrant, SKL-SP2 Spotcheck Developer Various dates
SKD-S2, SKC-S, and Sherwin Certification for D-100, D-
350, KO-17, KO-19 Liquid Penetrant Materials
Certificate of #915501-02 Various Welding Shims and Wire Various dates
Compliance
Miscellaneous Documents Revision
Number Title or Date
MC-GTAW PCI Welding Procedure Specification Machine Gas 16
Tungsten Arc Welding
PQR-62 PCI Procedure Qualification Record for WPS 8 3
PQE-63 PCI Procedure Qualification Record for Manual GTAW 6
PQR-600 PCI Procedure Qualification Record for Machine GTAW 8
PQR-899 PCI Procedure Qualification Record for Machine 8 4
The following items are requested for the
Public Radiation Safety Inspection
at Palo Verde
Dates of Inspection: 02/04/2019 to 02/08/2019
Integrated Report 2019001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before Monday, January 21, 2019.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled
5-A, applicable organization charts in file/folder 5-B, etc.
The information should be provided in electronic format or a secure document management
service. If information is placed on a secured document management system, please ensure
the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the
inspectors will have access to the information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
5. Radiation Monitoring Instrumentation (71124.05)
Date of Last Inspection: January 23, 2017
A. List of contacts and telephone numbers for the following areas below. Please include
area code and prefix. If work cell numbers are appropriate, then please include them as
well.
1. Process monitor calibration (Include Chemistry, Systems Engineering and I&C, as
applicable)
2. Radiation protection instrument calibration (Portable and Stationary)
3. Installed instrument calibrations (Include Systems Engineering and I&C)
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as
applicable)
5. EP contacts for Equipment Important to Emergency Response/Preparedness
(EITER)
6. Licensing/Regulatory Affairs
- B. Applicable organization charts, including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
- C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support,
LARs, and LERs, performed since the date of the last inspection, related to:
1. Portable Radiation instruments: Area radiation monitors, portable continuous air
monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational
air sampling), electronic dosimeters, teledosimetry
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel
contamination monitors, or whole body counters
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors
(non-effluent), criticality monitors, accident monitors
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters
D. Procedure indexes for radiation protection procedures and other related disciplines.
1. Calibration, use, and operation of continuous air monitors, portable survey
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
2. Calibration use and operation of portal monitors, small article monitors, personnel
contamination monitors, and whole body counters
3. Calibration of installed area radiation monitors, process monitors, criticality monitors,
and accident monitors
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)
(include bench top counters here)
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as
appropriate.
E. Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure index.
1. Calibration of portable ion chambers
2. Calibration of Friskers
3. Calibration of telescoping high range instruments
4. Calibration of portable neutron instruments
5. Calibration of SAMs
6. Whole body counter calibration
7. Laboratory instrumentation quality control
8. Calibration of Containment/Drywell high range radiation monitor
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
1. Area radiation monitors, continuous air monitors, portable survey instruments,
electronic dosimeters, and teledosimetry
2. Portal monitors, small article monitors, personnel contamination monitors, and whole
body counters
3. Installed radiation monitors, criticality monitors, accident range monitors
4. Count room radiation instruments
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H. State the required calibration frequency and provide the most recent calibration data for
the whole body counters, at least one portable survey instrument, one area radiation
monitor, one air sampler, one continuous air monitor, and one drywell/containment high-
range monitor.
- I. Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation
noted in request above, in 5-I.
J. Provide the alarm set point values for the portal and personnel contamination monitors in
operation.
K. Radiation Monitoring System health report for the previous 12 months
- L. Provide the following lists of instruments to include make, model, identifier (S/N or plant
ID), and location:
1. Portable radiation instruments currently in use (for EADs just make, model, and
quantity).
2. Stationary radiation instruments currently in use.
3. Installed Radiation monitors
a. Area radiation monitors and
b. Process radiation monitors.
(Include their instrumentation designator, function and calibration procedure
number and title.) Please indicate which, if any, detectors have been
replaced within the past 2 years (since the last inspection).
c. Radiation instrumentation abandoned in place.
d. Radiation instrumentation covered by the maintenance rule.
installed radiation monitoring instruments.
N. Provide the NIST traceability and calibration or verification of the primary sources for
instrument calibration and the procedures used to achieve this.
6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
Date of Last Inspection: January 23, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological effluent control (liquid & gaseous) and reporting
(RP, Chemistry, RW, Ops, etc.)
2. Effluent Monitor calibration (liquid and gaseous) and maintenance
(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
3. Engineered safety feature air cleaning systems for effluent release
(Systems Engineering, I&C, Maintenance, etc.)
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles for the above individuals
and also for their supportive Management. Please include as appropriate for your site,
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency
Protection. (Recent pictures are appreciated.)
- C. Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
1. Radioactive effluents and effluent radiation monitors
2. Engineered Safety Feature Air cleaning systems
D. Procedure indexes for the following areas and related disciplines.
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for
effluents)
E. Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Sampling and analysis of radioactive effluents
2. Effluent monitor setpoint determination
3. Generating radioactive effluent release permits
4. Effluent Monitor Calibrations (Include associated flow monitors)
5. Laboratory instrumentation quality control
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust
systems and other effluent air-cleaning systems, but not breathing air systems
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, associated with:
1. Radioactive effluents
2. Effluent radiation monitors (include associated effluent flow monitors)
3. Engineered Safety Feature Air cleaning systems (effluents, not breathing air)
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H. Annual Radioactive Effluent Release Reports for the latest two calendar years
parts for effluents) and any changes made since the last inspection.
J. The inter-laboratory comparison results for laboratory quality control performance of
effluent sample analysis for the latest two calendar years
K. Effluent sampling schedule for the week of the inspection
- L. Provide the last three annual trends of vent/stack effluent flow rates, by chart or table.
M. Operations department (or other responsible dept.) log records for effluent monitors
removed from service or out of service or a list of the same and compensatory actions
taken during the out of service condition.
N. Listing or log of liquid and gaseous release permits since the date of the last inspection
O. A list of the technical specification-required air cleaning systems with the two most
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
associated with the surveillances (and their system number/name).
- P. System Health Report for radiation monitoring instrumentation. Also, please provide a
specific list of all effluent radiation monitors that were considered inoperable for 7 days
or more since the date of the last inspection. If applicable, please provide the relative
Special Report and condition report(s). If not covered by maintenance rule, please
provide rationale.
Q. A list of significant changes made to the gaseous and liquid effluent process monitoring
system since the date of the last inspection. If applicable, please provide the
corresponding UFSAR section in which this change was documented.
R. A list of any occurrence in which a non-radioactive system was contaminated by a
radioactive system since the date of the last inspection. Please include any relevant
condition report(s).
S. Current Part 61 analyses for hard to detect radionuclides
T. Latest Land Use Census (coordinate with 71124.07)
U. Effluent based procedures for EALs or EOPs.
7. Radiological Environmental Monitoring Program (71124.07)
Date of Last Inspection: January 23, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)
2. Meteorological monitoring (RP, Chemistry, EP, I&C, System Engineering, etc.)
3. Maintenance and calibration of the above equipment
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
- C. Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
1. Radiological environmental monitoring program (including contractor environmental
laboratory audits, if used to perform environmental program functions)
2. Environmental TLD processing facility
3. Meteorological monitoring program
D. Procedure index for the following areas and other related disciplines.
1. Radiological environmental monitoring program
2. Meteorological monitoring program
3. Maintenance and calibration of related instrumentation, including the meteorological
tower
E. Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Sampling, collection and preparation of environmental samples
2. Sample analysis (if performed onsite)
3. Laboratory instrumentation quality control
4. Meteorological Tower sensor calibrations
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to the following
programs:
1. Radiological environmental monitoring (include TLDs and air sample pumps or their
infrastructure)
2. Meteorological monitoring (include Met Tower sensors and support equipment)
These lists should include a description of the condition that provides sufficient
detail that the inspectors can ascertain the regulatory impact, the significance
level assigned to the condition, the status of the action (e.g., open, working,
closed, etc.) and the search criteria used. Please provide in document formats
which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H. Copies of the two most recent calibration packages for the meteorological tower
instruments
I. Copies of the Annual Radiological Environmental Operating Reports and Land Use
Census for the latest two calendar years, and current revision of the Offsite Dose
Calculation Manual. Please include any supportive documentation for the changes
made to the ODCM since the last inspection.
J. Copy of the environmental laboratorys inter-laboratory comparison program results for
the latest two calendar years, if not included in the Annual Radiological Environmental
Operating Report
K. Data from the environmental laboratory documenting the analytical detection sensitivities
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
- L. Quality Assurance audits (e.g., NUPIC) for contracted services
M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most
recent monitoring results for each monitoring well per the GPI. Provide a separate list of
any missed samples, as applicable.
N. Technical requirements manual or licensee controlled specifications which list the
meteorological instruments calibration requirements
- O. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to
groundwater since the date of the last inspection. Please indicate what external
communications were made regarding each spill/leak.
P. Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.
- Q. Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in
the selection of your required REMP sampling locations. If these are different values
from your most recent meteorological assessment, please provide that assessment and
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also
indicate your noted predominant and least prevalent wind direction/sector, as used in
your REMP analysis.
R. Provide the height of the highest effluent release point. Please indicate if the height
accounts for plant grade elevation. Please also provide the most probable atmospheric
release height, if different from the highest effluent release point.
are scheduled to be onsite performing this inspection.
8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation (71124.08)
Date of Last Inspection: January 23, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,
Engineering, etc.)
2. Transportation of radioactive material/waste (RP, Maintenance, Ops, Security,
Chemistry, etc.)
3. personnel involved in solid radwaste processing, transferring, and transportation of
radioactive waste/materials)
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
- C. Copies of audits, department self-assessments, and LERs written since the date of the
last inspection, related to:
1. Solid radioactive waste management
2. Radioactive material/waste transportation program
D. Procedure index for the following areas and other related disciplines.
1. Solid radioactive waste management
2. Radioactive material/waste transportation
E. Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure indexes.
1. Process control program and any changes made since the last inspection
2. Solid and liquid radioactive waste processing
3. Waste stream sampling and analysis
4. Waste characterization and classification
5. Radioactive material/waste packaging & shipping
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to:
1. Solid radioactive waste
2. Transportation of radioactive material/waste
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
- H. Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,
packaging, and shipping
I. Provide a summary list or log of radioactive material and radioactive waste shipments for
the two most recent calendar years, in addition to the current calendar year.
J. Please provide at least two different radioactive waste stream sample analysis results
and resulting scaling factors for the latest two calendar years.
K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the
items stored in each facility with the most recent dose rates/surveys.
- L. A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that
will be completed during our onsite inspection period. If available, please provide the
applicable shipping manifests/waste characterizations and most recent surveys for each
shipment.
M. A list of significant changes made to the liquid or solid radwaste processing systems
since the date of the last inspection. If applicable, please provide the corresponding
UFSAR section in which this change was documented. Provide any supportive
documentation for the changes made or have it readily available for review.
N. List of radioactive waste processing systems or equipment abandoned in place since the
last inspection.
O. Please provide a schedule of radioactive material or waste processing or shipment
activities during the inspection week. Please indicate the current storage location of the
stored RAM or waste prepared for shipment, as well as any supportive surveys of its
measured dose rates. If available, please indicate its current stated waste class.
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JDixon Yes No Publicly Available Sensitive
OFFICE DRP/SRI DRP/RI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2
NAME CPeabody DReinert DYou RBywater VGaddy GPick
SIGNATURE CAP DRR DDY RLB vgg GAP
DATE 4/24/2019 4/29/2019 4/25/2019 4/24/2019 4/25/2019 4/25/2019
OFFICE C:DRS/OB C:DNMS/RIB TL:IPAT C:DRS/RCB C:DRP/D
NAME GWerner GWarnick RKellar NMakris NOKeefe
SIGNATURE GEW JFK for RLK NM NFO