(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/20/2009 | | | issue date = 05/20/2009 |
| | title = Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | | | title = Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 |
| | author name = Howard K L | | | author name = Howard K |
| | author affiliation = NRC/NRR/DLR/RPB2 | | | author affiliation = NRC/NRR/DLR/RPB2 |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:May 20, 2009 NOTE TO: File | | {{#Wiki_filter:May 20, 2009 NOTE TO: File FROM: Kent Howard, Project Manager /RA/ |
| | Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation SUJBECT: DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 This Note to File makes the following enclosed correspondence publicly available: |
| | * NRC License Renewal Teleconference - April 30, 2009 |
|
| |
|
| FROM: Kent Howard, Project Manager /RA/ Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
| | ==Enclosure:== |
|
| |
|
| SUJBECT: DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 This Note to File makes the following enclosed correspondence publicly available:
| | As stated |
| * NRC License Renewal Teleconference - April 30, 2009
| |
|
| |
|
| ==Enclosure:==
| | ML091400166 OFFICE PM:RPB2:DLR NAME KHoward DATE 05/20/09 |
| As stated
| |
|
| |
|
| ML091400166 OFFICE PM:RPB2:DLR NAME KHoward DATE 05/20/09 Note To File from Kent L. Howard dated May 20, 2009
| | Note To File from Kent L. Howard dated May 20, 2009 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 HARD COPY: | | DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 HARD COPY: |
| DLR R/F NRR License Renewal Teleconference - April 30, 2009 ENCLOSURE Items of Discussion: | | DLR R/F |
| : 1. Liner Corrosion 2. MRP-146 Found Indications 3. Submerged Medium - Voltage Cables/Draft SER Open Item Liner Corrosion
| |
|
| |
|
| Larry Freeland presented an overview of the liner flaw found during 1R19 and the corrective actions being performed. | | NRR License Renewal Teleconference - April 30, 2009 Items of Discussion: |
| | : 1. Liner Corrosion |
| | : 2. MRP-146 Found Indications |
| | : 3. Submerged Medium - Voltage Cables/Draft SER Open Item Liner Corrosion Larry Freeland presented an overview of the liner flaw found during 1R19 and the corrective actions being performed. |
| Bill Rogers asked how this recent OE will be incorporated into the LRA and what affect does this OE have on the LR IWE AMP (IX.S1). We responded that the OE will be incorporated into the AMP and appropriate changes will be made. This question and response will be documented in an RAI. | | Bill Rogers asked how this recent OE will be incorporated into the LRA and what affect does this OE have on the LR IWE AMP (IX.S1). We responded that the OE will be incorporated into the AMP and appropriate changes will be made. This question and response will be documented in an RAI. |
| Bill Rogers questioned the condition of the concrete in the area of the removed foreign material and if any other concrete degradation was observed. We responded that no concrete degradation was found in the area of removed foreign material or in the surrounding area. The concrete was said to be in good condition. Additionally, we stated that the void will be filled with suitable grout, one or two studs were cut from the removed liner plate (an engineering evaluation has determined that the studs will remain embedded in the concrete and are not necessary for the repair plate) and a Root Cause evaluation is being performed to further evaluate this occurrence. An RAI will be issued to document questions concerning the condition of the concrete, repairs, and impacts to IWE and IWL programs. | | Bill Rogers questioned the condition of the concrete in the area of the removed foreign material and if any other concrete degradation was observed. We responded that no concrete degradation was found in the area of removed foreign material or in the surrounding area. The concrete was said to be in good condition. Additionally, we stated that the void will be filled with suitable grout, one or two studs were cut from the removed liner plate (an engineering evaluation has determined that the studs will remain embedded in the concrete and are not necessary for the repair plate) and a Root Cause evaluation is being performed to further evaluate this occurrence. An RAI will be issued to document questions concerning the condition of the concrete, repairs, and impacts to IWE and IWL programs. |
| Hansraj Asher asked a question related to our enhanced IWE program due to liner corrosion finding from 2006 and how this differs from the IWE Augmented Code Inspection. We did not respond to this question and requested an RAI. This question and response will be documented in an RAI. | | Hansraj Asher asked a question related to our enhanced IWE program due to liner corrosion finding from 2006 and how this differs from the IWE Augmented Code Inspection. We did not respond to this question and requested an RAI. This question and response will be documented in an RAI. |
| MRP-146 Found Indications Steve Buffington presented an overview of the indications identified on "A" hot leg drain line found during 1r19 and the corrective actions being performed. The NRC was satisfied that we were performing MRP-146 inspections in line with the commitment made for License Renewal. This item is closed. | | MRP-146 Found Indications Steve Buffington presented an overview of the indications identified on A hot leg drain line found during 1r19 and the corrective actions being performed. The NRC was satisfied that we were performing MRP-146 inspections in line with the commitment made for License Renewal. |
| Submerged Medium-Voltage Cables/Draft SER Open Item Discussion was led by Bill Rogers. Upon review of the BVPS cable program, the NRC has concluded that our program is not applicable to the in-scope RW/SW cables. The XI.E3 program was not intended to bound cables that experience continuous submergence. It was stated that our plant-specific program also does not bound the environment of continues submergence. The NRC stated that we have not demonstrated that the cables are "qualified" for submergence and we lack an appropriate program to mange aging. | | This item is closed. |
| | Submerged Medium-Voltage Cables/Draft SER Open Item Discussion was led by Bill Rogers. Upon review of the BVPS cable program, the NRC has concluded that our program is not applicable to the in-scope RW/SW cables. The XI.E3 program was not intended to bound cables that experience continuous submergence. It was stated that our plant-specific program also does not bound the environment of continues submergence. The NRC stated that we have not demonstrated that the cables are qualified for submergence and we lack an appropriate program to mange aging. |
| | ENCLOSURE |
|
| |
|
| Brian Murtagh led a discussion on why isn't the current commitment for cables acceptable and how do we differ from Wolf Creek commitment. The NRC stated we differ from other plants due to our situation of continuous submergence. It was discussed that we will need an AMP that matches the environment or alter the current environment to match a GALL define environment. We questioned whether a commitment to alter the environment prior to the PEO and replacement of submerged cables prior to the PEO would be acceptable. The NRC will issue an RAI on the subject of submerged medium-voltage cables. | | Brian Murtagh led a discussion on why isnt the current commitment for cables acceptable and how do we differ from Wolf Creek commitment. The NRC stated we differ from other plants due to our situation of continuous submergence. It was discussed that we will need an AMP that matches the environment or alter the current environment to match a GALL define environment. |
| Summary: BVPS will receive four (4) license renewal RAIs. Three (3) pertaining to liner corrosion and one (1) pertaining to submerged medium-voltage cables. The item concerning MRP-146 is closed.}} | | We questioned whether a commitment to alter the environment prior to the PEO and replacement of submerged cables prior to the PEO would be acceptable. The NRC will issue an RAI on the subject of submerged medium-voltage cables. |
| | Summary: |
| | BVPS will receive four (4) license renewal RAIs. Three (3) pertaining to liner corrosion and one (1) pertaining to submerged medium-voltage cables. The item concerning MRP-146 is closed.}} |
Letter Sequence Meeting |
---|
|
Results
Other: L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System., L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass)., L-08-261, Schedule for Submittal of Annual Update for License Renewal Application, L-08-262, Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd)., L-08-263, Submittal of Revision to License Renewal Application Amendment No. 24, L-08-292, Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms)., L-08-316, License Renewal Application Amendment No. 26 (TAC Nos. MD6593 and MD6594), Revisions, L-08-393, License Renewal Application, Amendment No. 33, L-09-058, Comments on Safety Evaluation Report with Open Item Related to the License Renewal, L-09-138, License Renewal Application, Amendment No. 36, L-09-151, License Renewal Application Amendment No. 37, ML081000322, ML081000323, ML081000324, ML081000326, ML081000327, ML081000328, ML081000329, ML081000330, ML081000331, ML081000332, ML081640592, ML081640593, ML081640594, ML081640596, ML081640597, ML081640598, ML081640599, ML081640600, ML081640601, ML081640602, ML081640603, ML081640604, ML082550686, ML082550687, ML082550688, ML083010249, ML092740576, ML092920050, NRC-2009-0496, Beaver Valley Federal Register Notice - Record of Decision to Renew License
|
MONTHYEARL-07-130, Submittal of Pressure and Temperature Limits Report, Revision 42007-09-19019 September 2007 Submittal of Pressure and Temperature Limits Report, Revision 4 Project stage: Request ML0805902622008-03-0303 March 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0806402162008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 and 2, LRA Project stage: RAI ML0806010202008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807202882008-03-21021 March 2008 Request for Additional Information, Section B.2.35 Project stage: RAI ML0807907442008-03-26026 March 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application, for Sections B.2.6, B.2.19, and B.2.23 Project stage: RAI L-08-122, Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings2008-03-31031 March 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings Project stage: Response to RAI ML0807903922008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807905382008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI L-08-124, Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 52008-04-0202 April 2008 Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 5 Project stage: Response to RAI ML0807907352008-04-0303 April 2008 RAI for the Reveiw of the Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI ML0810002962008-04-0303 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application, Amendment No. 4, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0810003222008-04-0303 April 2008 Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System. Project stage: Other ML0810003232008-04-0303 April 2008 Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System. Project stage: Other ML0810003242008-04-0303 April 2008 Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers. Project stage: Other ML0810003262008-04-0303 April 2008 Drawing Lr 1-09-2, Rev. 4, Vent and Drain System. Project stage: Other ML0810003272008-04-0303 April 2008 Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System. Project stage: Other ML0810003282008-04-0303 April 2008 Drawing Lr 1-14A-1, Rev. 7, Sample System. Project stage: Other ML0810003292008-04-0303 April 2008 Drawing Lr 1-14A-2, Rev. 5, Sample System. Project stage: Other ML0810003302008-04-0303 April 2008 Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System. Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System. Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System.2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. Project stage: Other ML0810003312008-04-0303 April 2008 Drawing Lr 1-24-1, Rev. 6, Feedwater System. Project stage: Other ML0809804832008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810503332008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI L-08-143, Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 62008-04-18018 April 2008 Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 6 Project stage: Response to RAI L-08-144, Reply to Request for Additional Information for the Review of License Renewal Application2008-04-25025 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application Project stage: Response to RAI ML0811303942008-04-28028 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810502702008-04-30030 April 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI L-08-146, Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 72008-04-30030 April 2008 Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 7 Project stage: Response to RAI L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-0202 May 2008 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-0505 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0814104162008-05-0808 May 2008 Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings Project stage: Request ML0810505432008-05-0808 May 2008 Request for Additional Information, Sections 3.5.2.2, B.2.1, B.2.3 and 4.6 of License Renewal Application Project stage: RAI ML0811604672008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0812009202008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593 and MD6594) Project stage: RAI ML0811205392008-05-15015 May 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0814405432008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Amendment No. 9. and Revised License Renewal Boundary Drawings Project stage: Response to RAI L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0811304122008-05-22022 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0811505772008-05-28028 May 2008 Request for Additional Information for Sections B.2.27, 4.3 and 4.7.4 of the BVPS LRA Project stage: RAI L-08-180, Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-28028 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-147, Reply to Request for Additional Information for Renewal License Application2008-06-0202 June 2008 Reply to Request for Additional Information for Renewal License Application Project stage: Response to RAI ML0814306872008-06-0404 June 2008 Request for Additional Information the Review of Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI L-08-181, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 102008-06-0606 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 10 Project stage: Response to RAI ML0816405052008-06-0909 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application License Renewal Application Amendment No. 11, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0816405922008-06-0909 June 2008 Drawing Lr 1-14A-1, Rev. 8, Sample System (Ss). Project stage: Other ML0816405932008-06-0909 June 2008 Drawing Lr 1-21-1, Rev. 6, Main Steam System (Ms). Project stage: Other ML0816405942008-06-0909 June 2008 Drawing Lr 1-22-1, Rev. 4, Condensate System (Cn). Project stage: Other 2008-04-03
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML22019A2652022-01-27027 January 2022 Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B ML20080J7892020-04-28028 April 2020 Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19085A5132019-04-0101 April 2019 Review of Updated Final Safety Analysis Report, Revision 23 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML18067A1132018-03-0909 March 2018 Notice of Public Meeting on March 27, 2018 ML17061A2072017-03-0707 March 2017 Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML14195A0742014-07-14014 July 2014 Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936) IR 05000334/20004122014-07-0808 July 2014 NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote ML14189A1212014-07-0808 July 2014 NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues ML14189A1192014-07-0808 July 2014 NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues ML14161A1482014-06-17017 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 ML13186A0382013-07-0808 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report ML13179A3182013-07-0101 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports ML13154A4392013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2 ML12265A2032012-10-0202 October 2012 Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12263A4202012-09-20020 September 2012 Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment Request ML12207A5672012-07-26026 July 2012 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5 ML12194A5622012-07-16016 July 2012 Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12123A7032012-05-17017 May 2012 Safety Evaluation by the Office of Nuclear Reactor Regulation Annual Financial Test for a Parent Company Guarantee Firstenergy Nuclear Operating Company Beaver Valley Power Station, Unit 1; Docket No. DPR-66 and Perry Nuclear Power Plant ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 ML0932102822009-11-17017 November 2009 Verbal Authorization of Relief Request ML0926704712009-09-22022 September 2009 G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station ML0925200672009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 ML0925102602009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0921800382009-08-0606 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0920405122009-07-21021 July 2009 G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station ML0915602002009-06-0808 June 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0914001662009-05-20020 May 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0835003252009-01-21021 January 2009 Summary of Telephone Conf Call Held on Sept. 26, 2008 Between NRC and Firstenergy Nuclear Operating Company Concerning the RAI Pertaining to the Refurbishment Activities at the Bvps. Units 1&2 LRA ML0832504202008-12-19019 December 2008 Summary of Telephone Conference Call Held on 11/17/08, Between the NRC and FENOC, Concerning Requests for Additional Information Pertaining to the Beaver Valley Power Station, Units 1 and 2, LRA ML0833100872008-11-26026 November 2008 Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace ML0830102492008-11-13013 November 2008 Summary of Telephone Conference Call Held on 10/8/08, Between the NRC and Firstenergy Nuclear Operating Company, Concerning Open Items Pertaining to the BVPS, Units 1 and 2, License Renewal SER ML0830202902008-11-13013 November 2008 Summary of Telephone Conference Call Held on 8/28/08, Between the NRC and FENOC, Concerning RAI Pertaining to the BVPS, Units 1 and 2, LRA ML0829107022008-10-20020 October 2008 10/30/08 Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 and 2 ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0731005762007-11-0808 November 2007 11/27/2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0631104002006-11-0909 November 2006 Notice of Closed Meeting Between Fenco Security and NSIR to Discuss Fenco Fleet Security Matters 2022-01-27
[Table view] |
Text
May 20, 2009 NOTE TO: File FROM: Kent Howard, Project Manager /RA/
Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation SUJBECT: DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 This Note to File makes the following enclosed correspondence publicly available:
Enclosure:
As stated
ML091400166 OFFICE PM:RPB2:DLR NAME KHoward DATE 05/20/09
Note To File from Kent L. Howard dated May 20, 2009
SUBJECT:
DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 HARD COPY:
DLR R/F
NRR License Renewal Teleconference - April 30, 2009 Items of Discussion:
- 1. Liner Corrosion
- 2. MRP-146 Found Indications
- 3. Submerged Medium - Voltage Cables/Draft SER Open Item Liner Corrosion Larry Freeland presented an overview of the liner flaw found during 1R19 and the corrective actions being performed.
Bill Rogers asked how this recent OE will be incorporated into the LRA and what affect does this OE have on the LR IWE AMP (IX.S1). We responded that the OE will be incorporated into the AMP and appropriate changes will be made. This question and response will be documented in an RAI.
Bill Rogers questioned the condition of the concrete in the area of the removed foreign material and if any other concrete degradation was observed. We responded that no concrete degradation was found in the area of removed foreign material or in the surrounding area. The concrete was said to be in good condition. Additionally, we stated that the void will be filled with suitable grout, one or two studs were cut from the removed liner plate (an engineering evaluation has determined that the studs will remain embedded in the concrete and are not necessary for the repair plate) and a Root Cause evaluation is being performed to further evaluate this occurrence. An RAI will be issued to document questions concerning the condition of the concrete, repairs, and impacts to IWE and IWL programs.
Hansraj Asher asked a question related to our enhanced IWE program due to liner corrosion finding from 2006 and how this differs from the IWE Augmented Code Inspection. We did not respond to this question and requested an RAI. This question and response will be documented in an RAI.
MRP-146 Found Indications Steve Buffington presented an overview of the indications identified on A hot leg drain line found during 1r19 and the corrective actions being performed. The NRC was satisfied that we were performing MRP-146 inspections in line with the commitment made for License Renewal.
This item is closed.
Submerged Medium-Voltage Cables/Draft SER Open Item Discussion was led by Bill Rogers. Upon review of the BVPS cable program, the NRC has concluded that our program is not applicable to the in-scope RW/SW cables. The XI.E3 program was not intended to bound cables that experience continuous submergence. It was stated that our plant-specific program also does not bound the environment of continues submergence. The NRC stated that we have not demonstrated that the cables are qualified for submergence and we lack an appropriate program to mange aging.
ENCLOSURE
Brian Murtagh led a discussion on why isnt the current commitment for cables acceptable and how do we differ from Wolf Creek commitment. The NRC stated we differ from other plants due to our situation of continuous submergence. It was discussed that we will need an AMP that matches the environment or alter the current environment to match a GALL define environment.
We questioned whether a commitment to alter the environment prior to the PEO and replacement of submerged cables prior to the PEO would be acceptable. The NRC will issue an RAI on the subject of submerged medium-voltage cables.
Summary:
BVPS will receive four (4) license renewal RAIs. Three (3) pertaining to liner corrosion and one (1) pertaining to submerged medium-voltage cables. The item concerning MRP-146 is closed.