Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22019A265 | 27 January 2022 | Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B | Safe Shutdown Loop seal Mission time Coatings Foreign Material Exclusion |
ML20080J789 | 28 April 2020 | Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval | VT-2 Incorporated by reference Through-Wall Leak |
ML19182A356 | 23 July 2019 | Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 | Fukushima Dai-Ichi |
ML19085A513 | 1 April 2019 | Review of Updated Final Safety Analysis Report, Revision 23 | |
ML18099A081 | 6 April 2018 | Bv Annual Assessment Meeting Summary and Attendance List 2018 | |
ML18067A113 | 9 March 2018 | Notice of Public Meeting on March 27, 2018 | Open House |
ML17061A207 | 7 March 2017 | Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 | Open House |
ML16224A765 | 20 October 2016 | Review of Updated Final Safety Analysis Report, Revision 22 | |
ML15201A481 | 20 July 2015 | Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 | |
ML15182A191 | 16 July 2015 | Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation | |
ML15135A298 | 21 May 2015 | Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, | |
ML15110A406 | 23 April 2015 | Notice of Closed Meeting with FENOC on Beaver Valley | |
ML15016A439 | 20 January 2015 | Draft Request for Additional Information | |
ML14195A074 | 14 July 2014 | Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936) | |
IR 05000334/2000412 | 8 July 2014 | NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote | |
ML14189A121 | 8 July 2014 | NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues | |
ML14189A119 | 8 July 2014 | NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues | |
ML14161A148 | 17 June 2014 | Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 | |
ML13186A038 | 8 July 2013 | Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report | |
ML13179A318 | 1 July 2013 | Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports | |
ML13154A439 | 4 June 2013 | Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2 | |
ML12265A203 | 2 October 2012 | Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule | |
ML12263A420 | 20 September 2012 | Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment Request | Enforcement Discretion Probabilistic Risk Assessment |
ML12207A567 | 26 July 2012 | Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5 | Safe Shutdown |
ML12194A562 | 16 July 2012 | Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal | |
ML12158A400 | 8 June 2012 | 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) | |
ML12123A703 | 17 May 2012 | Safety Evaluation by the Office of Nuclear Reactor Regulation Annual Financial Test for a Parent Company Guarantee Firstenergy Nuclear Operating Company Beaver Valley Power Station, Unit 1; Docket No. DPR-66 and Perry Nuclear Power Plant | |
ML101410517 | 21 May 2010 | Summary of the May 2010 Annual Assessment Open-House Public Meeting | Open House |
ML100840756 | 31 March 2010 | Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 | |
ML093210282 | 17 November 2009 | Verbal Authorization of Relief Request | High Radiation Area Weld Overlay Nondestructive Examination |
ML092670471 | 22 September 2009 | G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station | Aging Management |
ML092520067 | 9 September 2009 | Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | |
ML092510226 | 8 September 2009 | Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 | |
ML092510260 | 8 September 2009 | Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | |
ML092180038 | 6 August 2009 | Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | |
ML092040512 | 21 July 2009 | G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station | Aging Management |
ML091560200 | 8 June 2009 | Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | Coatings Moisture barrier |
ML091400166 | 20 May 2009 | Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 | |
ML083500325 | 21 January 2009 | Summary of Telephone Conf Call Held on Sept. 26, 2008 Between NRC and Firstenergy Nuclear Operating Company Concerning the RAI Pertaining to the Refurbishment Activities at the Bvps. Units 1&2 LRA | |
ML083250420 | 19 December 2008 | Summary of Telephone Conference Call Held on 11/17/08, Between the NRC and FENOC, Concerning Requests for Additional Information Pertaining to the Beaver Valley Power Station, Units 1 and 2, LRA | Aging Management Fire Protection Program |
ML083310087 | 26 November 2008 | Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace | |
ML083010249 | 13 November 2008 | Summary of Telephone Conference Call Held on 10/8/08, Between the NRC and Firstenergy Nuclear Operating Company, Concerning Open Items Pertaining to the BVPS, Units 1 and 2, License Renewal SER | Operating Basis Earthquake Design basis earthquake |
ML083020290 | 13 November 2008 | Summary of Telephone Conference Call Held on 8/28/08, Between the NRC and FENOC, Concerning RAI Pertaining to the BVPS, Units 1 and 2, LRA | |
ML082910702 | 20 October 2008 | 10/30/08 Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 and 2 | Open House License Renewal |
ML080730116 | 21 March 2008 | Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In | |
ML080740084 | 14 March 2008 | Draft Regulatory Guide for Comment | |
ML073100576 | 8 November 2007 | 11/27/2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review | Open House |
ML071710346 | 21 June 2007 | Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event | |
ML071620212 | 13 June 2007 | Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse | |
ML063110400 | 9 November 2006 | Notice of Closed Meeting Between Fenco Security and NSIR to Discuss Fenco Fleet Security Matters |