MONTHYEARL-13-395, Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis2013-12-17017 December 2013
[Table View]Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis Project stage: Request ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat Project stage: Meeting ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley Project stage: Request ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, Project stage: Meeting ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 Project stage: Request ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station Project stage: Meeting ML15254A2732015-09-10010 September 2015 Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information Project stage: Other ML16063A2882016-03-0202 March 2016 Response to NRC Request for Additional Information, Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML16105A2112016-04-26026 April 2016 Nrc'S Plan for the Audit of First Energy Nuclear Operating Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MF3286 Project stage: Other 2015-07-20 |
ML15201A481 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 07/20/2015 |
From: | Juan Uribe Japan Lessons-Learned Division |
To: | Mohamed Shams Japan Lessons-Learned Division |
Uribe J, NRR/JLD, 415-3809 | |
References | |
Download: ML15201A481 (3) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2024-09-25025 September 2024
[Table view]Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML24109A0412024-04-18018 April 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL & Sus ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20221289, Meeting with Energy Harbor Nuclear Corp. to Discuss a Request for Additional Information Response for the Decay Time License Amendment Request2022-12-16016 December 2022 Meeting with Energy Harbor Nuclear Corp. to Discuss a Request for Additional Information Response for the Decay Time License Amendment Request ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20220203, Notice of Pre-submittal Meeting with Energy Harbor Nuclear Corp. for Beaver Valley Power Station, Units 1 and 22022-03-0404 March 2022 Notice of Pre-submittal Meeting with Energy Harbor Nuclear Corp. for Beaver Valley Power Station, Units 1 and 2 PMNS20220029, License Amendment Regarding Operating Limits Report (COLR)2022-01-21021 January 2022 License Amendment Regarding Operating Limits Report (COLR) PMNS20220027, License Amendment Regarding Operating Limits Report (COLR)2022-01-13013 January 2022 License Amendment Regarding Operating Limits Report (COLR) ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210390, Steam Generator Sleeve Inspection License Amendment Request Discussion2021-04-0505 April 2021 Steam Generator Sleeve Inspection License Amendment Request Discussion PMNS20210008, Forthcoming Meeting with the NRC Petition Review Board (PRB) and Nuclear Energy Oversight Project Regarding the 2.206 Petitions Submitted on October 31 and November 8, 20202021-01-0707 January 2021 Forthcoming Meeting with the NRC Petition Review Board (PRB) and Nuclear Energy Oversight Project Regarding the 2.206 Petitions Submitted on October 31 and November 8, 2020 ML20168A2782020-06-16016 June 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) Corrected Registration Link ML20139A1532020-05-18018 May 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) ML19136A0962019-05-15015 May 2019 Notice of Category 3 Public Meeting (Webinar) - Joint Annual Assessment Meeting for Beaver Valley, Limerick, Peach Bottom, Susquehanna, and Three Mile Island ML17061A2072017-03-0707 March 2017 Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 ML16067A3282016-03-0808 March 2016 Notice of Public Meeting - Beaver Valley Power Station Annual Assessment Meeting, March 21, 2016 ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley ML15082A3852015-03-24024 March 2015 Notice of Annual Assessment Meeting and Open House on April 9, 2015 ML14161A1482014-06-17017 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 ML14078A0882014-03-19019 March 2014 April 03, 2014 Notice of Category 3 Public Meeting with Beaver Valley, Units 1 and 2, to Discuss Annual Safety Assessment ML14078A0662014-03-19019 March 2014 April 3, 2014 Notice of Category 3 Meeting with Firstenergy Nuclear Generation, LLC, Beaver Valley, Units 1 and 2, to Discuss Assessment of Safety Performance ML13252A1712013-09-0909 September 2013 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) IR 05000412/20132012013-08-26026 August 2013 FENOC, Closed Meeting Notice 13-02, Requested a Regulatory Conference with the NRC to Discuss IR 05000354 and 05000412/2013201 ML13073A3372013-03-14014 March 2013 April 11, 2013 Notice of Public Meeting with Beaver Valley Power Station, Units 1 and 2, to Discuss Fenoc'S Performance During Cy 2012 ML12265A2032012-10-0202 October 2012 Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12263A4312012-09-27027 September 2012 Notice of Meeting Teleconference Meeting with First Energy Nuclear Operating Company to Discuss NRC RAI Extension Request for the Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 ML12256A7922012-09-12012 September 2012 Notice of All-FENOC Public Meeting to Discuss Fleet Wide Performance ML12194A5622012-07-16016 July 2012 Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12067A0552012-03-0707 March 2012 Notice of Public Meeting with First Energy Nuclear Operating Company (FENOC) to Discuss the Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 ML1115401312011-06-0202 June 2011 Notice of Significant Licensee Meeting, Beaver Valley, Perry, & Davis-Besse Nuclear Generating Stations to Discuss Firstenergy Nuclear Operating Company Fleet Wide Performance with FENOC Management ML1109803912011-04-0808 April 2011 Notice of Public Meeting for Beaver Valley Power Station ML1025107802010-09-14014 September 2010 Notice of Forthcoming Meeting with First Energy Nuclear Operating Company, Beaver Valley Power Station, Unit No. 2 & Holtec, Inc., to Discuss the Licensee'S Responses, Dated August 9, 2010 ML1009600412010-04-0606 April 2010 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 & 2 for Calendar Year 2009, as Described in Annual Assessment Letter Dated 03/03/2010 ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 ML1006006372010-03-0101 March 2010 Stations Public Meeting Notice, to Discuss Firstenergynuclearoperating Company Fleet-Wide Performance with FENOC Management ML0907712222009-03-18018 March 2009 Notice of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Nrc'S Assessment of Safety Performance of Beaver Valley Power Station for Calendar Year 2008 & Role of NRC in Ensuring Safe Plant Operations ML0835901482008-12-24024 December 2008 Meeting Notice, Significant Licensee Meeting with Firstenergy Nuclear Operating Company (FENOC) Regarding Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations ML0833100872008-11-26026 November 2008 Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace ML0829107022008-10-20020 October 2008 10/30/08 Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 and 2 ML0807009652008-03-10010 March 2008 Notice of Public Meeting with Firstenergy Nuclear Operating Company to Discuss Nrc'S Assessment of the Safety Performance of the Beaver Valley Nuclear Power Station for Calendar Year 2007 ML0735504672007-12-21021 December 2007 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss FENOC Fleet Wide Performance ML0731005762007-11-0808 November 2007 11/27/2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review ML0718002422007-07-10010 July 2007 08/02/2007, Revised for Room Change, Forthcoming Meeting with Firstenergy Nuclear Operating Company Regarding the Beaver Valley Power Station, Units 1 and 2, License Renewal Application ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0708512152007-04-0909 April 2007 Meeting with Firstenergy Nuclear Operation Company to Discuss Nrc'S Assessment of the Safety Performance of the Beaver Valley Nuclear Power Station for Calendar Year 2006 ML0706104772007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Beaver Valley Station ML0633902812006-11-30030 November 2006 Notice of Multi-Regional NRC Meeting with FENOC Management to Discuss FENOC Fleet-wide Performance 2024-09-25 Category:Memoranda MONTHYEARML22019A2652022-01-27027 January 2022
[Table view]Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B ML20080J7892020-04-28028 April 2020 Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19085A5132019-04-0101 April 2019 Review of Updated Final Safety Analysis Report, Revision 23 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML18067A1132018-03-0909 March 2018 Notice of Public Meeting on March 27, 2018 ML17061A2072017-03-0707 March 2017 Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML14195A0742014-07-14014 July 2014 Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936) IR 05000334/20004122014-07-0808 July 2014 NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote ML14189A1212014-07-0808 July 2014 NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues ML14189A1192014-07-0808 July 2014 NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues ML14161A1482014-06-17017 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 ML13186A0382013-07-0808 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report ML13179A3182013-07-0101 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports ML13154A4392013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2 ML12265A2032012-10-0202 October 2012 Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12263A4202012-09-20020 September 2012 Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment Request ML12207A5672012-07-26026 July 2012 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5 ML12194A5622012-07-16016 July 2012 Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12123A7032012-05-17017 May 2012 Safety Evaluation by the Office of Nuclear Reactor Regulation Annual Financial Test for a Parent Company Guarantee Firstenergy Nuclear Operating Company Beaver Valley Power Station, Unit 1; Docket No. DPR-66 and Perry Nuclear Power Plant ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 ML0932102822009-11-17017 November 2009 Verbal Authorization of Relief Request ML0926704712009-09-22022 September 2009 G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station ML0925200672009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 ML0925102602009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0921800382009-08-0606 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0920405122009-07-21021 July 2009 G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station ML0915602002009-06-0808 June 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0914001662009-05-20020 May 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0835003252009-01-21021 January 2009 Summary of Telephone Conf Call Held on Sept. 26, 2008 Between NRC and Firstenergy Nuclear Operating Company Concerning the RAI Pertaining to the Refurbishment Activities at the Bvps. Units 1&2 LRA ML0832504202008-12-19019 December 2008 Summary of Telephone Conference Call Held on 11/17/08, Between the NRC and FENOC, Concerning Requests for Additional Information Pertaining to the Beaver Valley Power Station, Units 1 and 2, LRA ML0833100872008-11-26026 November 2008 Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace ML0830102492008-11-13013 November 2008 Summary of Telephone Conference Call Held on 10/8/08, Between the NRC and Firstenergy Nuclear Operating Company, Concerning Open Items Pertaining to the BVPS, Units 1 and 2, License Renewal SER ML0830202902008-11-13013 November 2008 Summary of Telephone Conference Call Held on 8/28/08, Between the NRC and FENOC, Concerning RAI Pertaining to the BVPS, Units 1 and 2, LRA ML0829107022008-10-20020 October 2008 10/30/08 Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 and 2 ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0731005762007-11-0808 November 2007 11/27/2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0631104002006-11-0909 November 2006 Notice of Closed Meeting Between Fenco Security and NSIR to Discuss Fenco Fleet Security Matters 2022-01-27 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 20, 2015 MEMORANDUM TO: Mohamed K. Shams, Chief Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation~
FROM: Juan F. Uribe, Project Manager ---~
Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CLOSED MEETING TO DISCUSS BASIN-WIDE PROBABLE MAXIMUM FLOOD ANALYSIS FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DATE AND TIME: Thursday, July 23, 2015 1:00 p.m. - 4:00 p.m. EST LOCATION: USACE Pittsburgh District Office 2200 William S. Moorhead Federal Building 1000 Liberty Avenue Pittsburgh, PA 15222-4186 PURPOSE: The purpose of this meeting is to discuss with FirstEnergy Nuclear Operating Co. (FENOC), the analysis of basin wide probable maximum flood for the Beaver Valley Power Station, Units 1 and 2, and the potential impact(s) on site flooding PARTICIPANTS: NRC FE NOC A Campbell, NRO G. Halnon B. Harvey, NRO C. Mancuso K. See, NRO S. Osting J.Uribe, NRR G. Ebeck C. Keller E. Hohman K. Roblyer P. Lashley MEETING CONTACT: Juan F. Uribe, NRR/JLD 301-415-3809 Juan.Uribe@nrc.gov Docket Nos. 50-334 and 50-412 cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING CLOSED MEETING WITH FIRSTENERGY NUCLEAR OPERATING CO.
TO DISCUSS BASIN-WIDE PROBABLE MAXIMUM FLOOD ANALYSIS FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 JULY 23. 2015 1:00 p.m. - 4:00 p.m., EST 1:00- 1:30pm Welcome and Introduction 1:30- 3:00pm U.S. Army Corps of Engineers presentation on Basin-Wide Probable Maximum Flood Update 3:00- 4:00pm Question and answer period
- Times and agenda topics are approximate Enclosure