Letter Sequence Request |
|---|
|
|
MONTHYEARL-13-395, Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis2013-12-17017 December 2013 Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis Project stage: Request ML14184B1962014-08-14014 August 2014 Summary of June 18, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Firstenergy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Stat Project stage: Meeting L-14-413, Submittal of Discharge Monitoring Report2014-12-17017 December 2014 Submittal of Discharge Monitoring Report Project stage: Request ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley Project stage: Request ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, Project stage: Meeting ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 Project stage: Request ML15225A4812015-08-14014 August 2015 July 23, 2015, Summary of Meeting with Representatives of the U.S. Army Corps, U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station Project stage: Meeting ML15254A2732015-09-10010 September 2015 Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information Project stage: Other ML16063A2882016-03-0202 March 2016 Response to NRC Request for Additional Information, Per 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML16105A2112016-04-26026 April 2016 NRCs Plan for the Audit of First Energy Nuclear Operating Companys Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MF3286 a Project stage: Other 2015-05-21
[Table View] |
Text
MEMORANDUM TO:
FROM:
SUBJECT:
DATE AND TIME:
LOCATION:
PURPOSE:
PARTICIPANTS:
MEETING CONTACT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 20, 2015 Mohamed K. Shams, Chief Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation~
Juan F. Uribe, Project Manager
---~
Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation FORTHCOMING CLOSED MEETING TO DISCUSS BASIN-WIDE PROBABLE MAXIMUM FLOOD ANALYSIS FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 Thursday, July 23, 2015 1 :00 p.m. - 4:00 p.m. EST USACE Pittsburgh District Office 2200 William S. Moorhead Federal Building 1000 Liberty Avenue Pittsburgh, PA 15222-4186 The purpose of this meeting is to discuss with FirstEnergy Nuclear Operating Co. (FENOC), the analysis of basin wide probable maximum flood for the Beaver Valley Power Station, Units 1 and 2, and the potential impact(s) on site flooding NRC A Campbell, NRO B. Harvey, NRO K. See, NRO J.Uribe, NRR Juan F. Uribe, NRR/JLD 301-415-3809 Juan.Uribe@nrc.gov FE NOC G. Halnon C. Mancuso S. Osting G. Ebeck C. Keller E. Hohman K. Roblyer P. Lashley Docket Nos. 50-334 and 50-412 cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING CLOSED MEETING WITH FIRSTENERGY NUCLEAR OPERATING CO.
TO DISCUSS BASIN-WIDE PROBABLE MAXIMUM FLOOD ANALYSIS FOR 1 :00- 1 :30pm 1 :30- 3:00pm 3:00- 4:00pm BEAVER VALLEY POWER STATION, UNITS 1 AND 2 JULY 23. 2015 1 :00 p.m. - 4:00 p.m., EST Welcome and Introduction U.S. Army Corps of Engineers presentation on Basin-Wide Probable Maximum Flood Update Question and answer period
- Times and agenda topics are approximate Enclosure
ML15201A481
- via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/LA NRR/JLD/JHMB/BC*
NRR/JLD/JHMB/PM NAME JUribe SLent MS hams JUribe DATE 07/20/15 07/20/15 07/20/15 07/20/15