Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2
ML092510260
Person / Time
Site: Beaver Valley
Issue date: 09/08/2009
From: Kent Howard
License Renewal Projects Branch 2
To:
License Renewal Projects Branch 2
Howard K, NRR/DLR/RPB2, 415-2989
Shared Package
ML092510257 List:
References
Download: ML092510260 (1)


Text

September 8, 2009 MEMORANDUM TO:

File FROM:

Kent Howard, Project Manager /RA/

Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DOCKETING OF NRC TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 This Note to File makes the following enclosed correspondence publicly available:

NRC License Renewal Teleconference - September 1, 2009

Enclosure:

As stated cc w/encl: See next page

ML092510257 (Package) ML092510260 (Note to File) ML092510262 (Correspondence)

OFFICE PM:RPB2:DLR NAME KHoward DATE 09/08/09

Beaver Valley Power Station, Units 1 and 2 cc:

Mr. Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH 44308 Mr. James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mr. Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Ms. Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mr. Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mr. David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Mr. Cliff Custer FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Mr. Steve Dort FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077 Ms. Mike Banko FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Route 168 Shippingport, PA 15077