IR 05000261/2011001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110630060
| number = ML110630060
| issue date = 03/04/2011
| issue date = 03/04/2011
| title = H. B. Robinson Steam Electric Plant, Unit 2, Annual Assessment Letter (Report 05000261/2011001)
| title = Annual Assessment Letter (Report 05000261/2011001)
| author name = McCree V M
| author name = Mccree V
| author affiliation = NRC/RGN-I/ORA
| author affiliation = NRC/RGN-I/ORA
| addressee name = Duncan R J
| addressee name = Duncan R
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261
| docket = 05000261
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/04/2011 06:53:11 Report 22 03/01/2011
{{#Wiki_filter:Page 1 of 2     Robinson 03/04/2011 06:53:11   Inspection / Activity Plan Report 22     03/01/2011 - 06/30/2012 Unit Planned Dates         No. of Staff Number Start End Inspection Activity     Title   on Site 95002 - 95002 SUPPLEMENTAL INSPECTION     8 2 05/31/2011 06/10/2011 IP 95002  Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION     2 2 03/21/2011 03/25/2011 IP 95001  Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP     5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151  Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE      3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151  Performance Indicator Verification OL EXAM - INITIAL EXAM PREP       4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1       4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2       4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1       3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151  Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION       1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2       4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151  Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2     Robinson 03/04/2011 06:53:11   Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates       No. of Staff Number Start End Inspection Activity   Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION   5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION   1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151  Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION   1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson 95002-95002 SUPPLEMENTAL INSPECTION 8 2 IP Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95002 05/31/2011 06/10/2011 95001-95001 SUPPLEMENTAL INSPECTION 2 2 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 03/21/2011 03/25/2011 PSB1-RP-RP PUBLIC RADIATION SAFETY INSP 5 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/23/2011 05/27/2011 2 IP Occupational Dose Assessment 71124.04 05/23/2011 05/27/2011 2 IP Radiation Monitoring Instrumentation 71124.05 05/23/2011 05/27/2011 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/23/2011 05/27/2011 2 IP Performance Indicator Verification 71151 05/23/2011 05/27/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 2 IP Exercise Evaluation 7111401 05/23/2011 05/27/2011 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/23/2011 05/27/2011 2 IP Performance Indicator Verification 71151 05/23/2011 05/27/2011 OL EXAM-INITIAL EXAM PREP 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 11/07/2011 11/11/2011 OL EXAM-INITIAL EXAM - WEEK 1 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 11/28/2011 12/02/2011 OL EXAM-INITIAL EXAM - WEEK 2 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 12/05/2011 12/09/2011 PSB1-RP-OCCUPATIONAL RP BASELINE WK1 3 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/23/2012 01/27/2012 2 IP Occupational ALARA Planning and Controls 71124.02 01/23/2012 01/27/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/23/2012 01/27/2012 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/23/2012 01/27/2012 2 IP Performance Indicator Verification 71151 01/23/2012 01/27/2012 EB3 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 01/30/2012 02/03/2012 PSB1-RP-OCCUPATIONAL RP BASELINE WK2 4 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/06/2012 02/10/2012 2 IP Occupational ALARA Planning and Controls 71124.02 02/06/2012 02/10/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/06/2012 02/10/2012 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/06/2012 02/10/2012 2 IP Performance Indicator Verification 71151 02/06/2012 02/10/2012 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Inspection / Activity Plan Page 2 of 2 03/04/2011 06:53:11 Report 22 03/01/2011
-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 2 IP Identification and Resolution of Problems 71152B 05/07/2012 05/11/2012 2 IP Identification and Resolution of Problems 71152B 05/21/2012 05/25/2012 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 2 IP A lert and Notification System Testing 7111402 05/21/2012 05/25/2012 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/21/2012 05/25/2012 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/21/2012 05/25/2012 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/21/2012 05/25/2012 2 IP Performance Indicator Verification 71151 05/21/2012 05/25/2012 EB3 HS-TRIENNIAL HEAT SINK INSPECTION 1 2 IP Heat Sink Performance 7111107T 06/04/2012 06/08/2012 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 02:28, 13 November 2019

Annual Assessment Letter (Report 05000261/2011001)
ML110630060
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2011
From: Mccree V
Region 1 Administrator
To: Duncan R
Carolina Power & Light Co
Shared Package
ML110630051 List:
References
IR-11-001
Download: ML110630060 (2)


Text

Page 1 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95002 - 95002 SUPPLEMENTAL INSPECTION 8 2 05/31/2011 06/10/2011 IP 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP 5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.