ML11227A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/10/2011
| issue date = 08/10/2011
| title = IR 05000456-11-005, 05000457-11-005 (Drs), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
| title = IR 05000456-11-005, 05000457-11-005 (Drs), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000456, 05000457
| docket = 05000456, 05000457
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000456/2011005]]
See also: [[see also::IR 05000456/2011005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                          NUCLEAR REGULATORY COMMISSION
REGION III
                                              REGION III
2443 WARRENVILLE ROAD, SUITE 210
                                2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
                                        LISLE, IL 60532-4352
-4352   August 10, 2011
                                          August 10, 2011
  Mr. Michael J. Pacilio
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville
Warrenville, IL 60555
, IL 60555 SUBJECT:   BRAIDWOOD STATION - NOTIFICATION OF AN N
SUBJECT:         BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT
RC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FO
                SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION
R INFORMATION
                INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)
INSPECTION
Dear Mr. Pacilio:
REPORT 05000 456/201100 5; 05000 457/20 1100 5 (DRS) Dear Mr. Pacilio
On Monday, November 28, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin
: On Monday , November 28, 2011 , the U. S. Nuclear Regulatory  
the on-site portion of the Triennial Heat Sink Performance Inspection Braidwood Station. This
Commission (NRC) will begin the on-site portion of the  
inspection will be performed in accordance with NRC baseline inspection procedure (IP)
Triennial Heat Sink Performance Inspection
71111.07T.
Braidwood Station. This inspection will be performed in accordance with NRC baseline inspection procedure (IP)  
In order to minimize the impact that the inspection has on the site and to ensure a productive
71111.07 T. In order to minimize the impact that the inspection has on the site and to ensure a productive  
inspection, we have enclosed a request for documents needed for the inspection. The
inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups.
documents have been divided into three groups.
   The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than
*   The first group lists information necessary for our initial inspection scoping activities. This
October 17, 2011. By October 20, 2011, the inspector will communicate the initial selected set of approximately  
    information should be available to the lead inspector no later than October 17, 2011. By
2-3 risk significant heat exchangers.
    October 20, 2011, the inspector will communicate the initial selected set of approximately
   The second group of documents requested  
    2-3 risk significant heat exchangers.
is those items needed to support our in
*   The second group of documents requested is those items needed to support our in-office
-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than
    preparation activities. This set of documents, including the calculations associated with the
November 14, 2011. This information should be separated for each selected component,  
    selected heat exchangers, should be available at the Regional Office no later than
especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
    November 14, 2011. This information should be separated for each selected component,
.). During the in
    especially if provided electronically (e.g., folder with component name that includes
-office preparation activities, the inspector may identify additional information needed to support the  
    calculations, condition reports, maintenance history, etc.). During the in-office preparation
inspection. The last group includes the additional information above
    activities, the inspector may identify additional information needed to support the
, as well as plant specific reference material. This information should be available onsite to the inspector
    inspection.
on Monday, November 28, 2011. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are  
The last group includes the additional information above, as well as plant specific reference
generated.  
    material. This information should be available onsite to the inspector on Monday,
M. Pacilio
    November 28, 2011. It is also requested that corrective action documents and/or questions
-2- The lead inspector for this inspection is Mr. Gerard O'Dwyer. If there are questions about the material requested, or the inspection, please call Mr. O'Dwyer at (630) 829
    developed during the inspection be provided to the inspector as the documents are
-9 624. Please send the information to the following e
    generated.
-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also an acceptable option. It is important that these documents be as complete as possible in order to minimize the number of documents requested during the preparation week or during the onsite inspection.
 
  All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
M. Pacilio                                     -2-
heat sink performance  
The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the
inspection. If no activities were accomplished
material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send
in that time period, then the request applies to the last applicable document in the previous time period.
the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
required information is also an acceptable option.
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
It is important that these documents be as complete as possible in order to minimize the
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
number of documents requested during the preparation week or during the onsite inspection.
-rm/adams.html (the Public Electronic Reading Room).
All requested documents are to be for the time period from the onsite inspection period back to
Sincerely, /RA by A. Dunlop For/
the documents that were provided in response to the previous heat sink performance
 
inspection. If no activities were accomplished in that time period, then the request applies to
Ann Marie Stone, Chie f , Engineering Branch 2
the last applicable document in the previous time period.
Division of Reactor Safety  
This letter does not contain new or amended information collection requirements subject to the
Docket No.  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
50-456; 50-457 License No. NPF-72; NPF-77 Enclosure:
requirements were approved by the Office of Management and Budget, control number 3150-
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST cc w/encl:
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
Distribution via ListServ
request for information or an information collection requirement unless the requesting
 
document displays a currently valid Office of Management and Budget control number.
TRIENNIAL HEAT
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
SINK PERFORMANCE INSPECTION
enclosure will be available electronically for public inspection in the NRC Public Document
DOCUMENT REQUEST
Room or from the Publicly Available Records (PARS) component of NRC's document system
Enclosure 1 Inspection Report
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
: 05000456/201
(the Public Electronic Reading Room).
1 00 5; 05000457/201
                                              Sincerely,
1 00 5(DRS) Inspection Dates
                                              /RA by A. Dunlop For/
: November 28
                                              Ann Marie Stone, Chief,
thru December 2, 2011
                                              Engineering Branch 2
Inspection
                                              Division of Reactor Safety
Procedure s: IP 71111.07, "Heat Sink Performance"
Docket No. 50-456; 50-457
Lead Inspector(630) 829-9 624 :  Gerard O'Dwyer
License No. NPF-72; NPF-77
I. Information Requested  
Enclosure:       TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT
By October 17, 2011 Gerard.odwyer@nrc.gov
                REQUEST
1. List of the Generic Letter (GL) 89
cc w/encl:       Distribution via ListServ
-13, "Service Water System Problems Affecting Safety-Related Equipment,"
 
heat exchangers in order of risk significance.
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
2. Copy of heat exchanger performance trending data tracked for each GL 89
Inspection Report:             05000456/2011005; 05000457/2011005(DRS)
-13 heat exchanger. 3. List of corrective action program documents (with a short description) associated with GL 89
Inspection Dates:             November 28 thru December 2, 2011
-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous three
Inspection Procedures:         IP 71111.07, Heat Sink Performance
years or since the last corrective action program document list was sent to the NRC for the previous heat sink performance inspection. The list should include all corrective action program documents not on the last corrective action program document list.
Lead Inspector:                Gerard ODwyer
4. Copy of any self
                              (630) 829-9624
-assessment done on any of GL 89-13 heat exchangers.
                              Gerard.odwyer@nrc.gov
5. Last two system health report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers.
I.    Information Requested By October 17, 2011
6. List of engineering
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
-related operator workarounds
          Safety-Related Equipment, heat exchangers in order of risk significance.
(with a short description)
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
associated with GL 89
          exchanger.
-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the
      3. List of corrective action program documents (with a short description) associated
documents that were provided in response to the previous
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
heat sink performance  
          exchanger testing, for the previous three years or since the last corrective action
inspectio n. 7. List of permanent and temporary modifications
          program document list was sent to the NRC for the previous heat sink performance
(with a short description)
          inspection. The list should include all corrective action program documents not on
associated with GL 89
          the last corrective action program document list.
-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
documents that were provided in response to the previous
      5. Last two system health report(s) and maintenance rule system notebooks for all the
heat sink performance  
          GL 89-13 heat exchangers.
inspectio n.
      6. List of engineering-related operator workarounds (with a short description)
TRIENNIAL HEAT
          associated with GL 89-13 heat exchangers. The requested documents are to be for
SINK PERFORMANCE INSPECTION
          the time period from the onsite inspection period back to the documents that were
DOCUMENT REQUEST
          provided in response to the previous heat sink performance inspection.
Enclosure 2 II. Information Requested By
      7. List of permanent and temporary modifications (with a short description) associated
November 14, 2011 1. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to
          with GL 89-13 heat exchangers. The requested documents are to be for the time
the GL 89-13 Heat Exchanger Program.
          period from the onsite inspection period back to the documents that were provided in
2. Copies of procedures developed to implement the recommendations of GL 89
          response to the previous heat sink performance inspection.
-13 (e.g., the GL 89-13 Heat Exchanger Program description
                                                1                                        Enclosure
). 3. For the specific heat exchangers selected:
 
a. Copies of the applicable
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
UFSAR sections for each heat exchanger. b. Copy of system description and design basis document for the heat  
II. Information Requested By November 14, 2011
exchangers (as applicable).
    1.   Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to
c. Provide a list of calculations  
          the GL 89-13 Heat Exchanger Program.
(with a short description
    2.   Copies of procedures developed to implement the recommendations of GL 89-13
) which currently apply to each heat exchanger
          (e.g., the GL 89-13 Heat Exchanger Program description).
. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers.
    3.   For the specific heat exchangers selected:
4. For the ultimate heat sink (UHS) and the safety
          a. Copies of the applicable UFSAR sections for each heat exchanger.
-related service water system (or equivalent):
          b. Copy of system description and design basis document for the heat
a. Copies of the applicable UFSAR sections
              exchangers (as applicable).
. b. Copy of system description and design basis document (as applicable).
          c. Provide a list of calculations (with a short description) which currently apply to
c. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety
              each heat exchanger.
-related service water system
          d. Copy of any operability determinations or other documentation of degradation
. d. Copy of the document
              associated with the heat exchangers or the systems that support the operation
(e.g. UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.
              for the selected heat exchangers.
5. A schedule of all inspections, cleanings, maintenance, or testing of any 6. Copies of Corrective Action Program implementing procedures.
    4.   For the ultimate heat sink (UHS) and the safety-related service water system (or
  safety-related plant
          equivalent):
heat exchanger to be performed during the on
          a.   Copies of the applicable UFSAR sections.
-site portion of
          b.   Copy of system description and design basis document (as applicable).
the inspection
          c.   Copy of any operability determinations or other documentation of degradation
. 7. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, Final Safety Analysis Report, and Technical Report Manual
                associated with the UHS and the safety-related service water system.
.
          d.   Copy of the document (e.g. UFSAR or Technical Requirements Manual)
TRIENNIAL HEAT
                that states the maximum cooling water system inlet temperature limit that
SINK PERFORMANCE INSPECTION
                still allows full licensed power operation of the nuclear reactor.
DOCUMENT REQUEST
    5.   A schedule of all inspections, cleanings, maintenance, or testing of any
Enclosure 3 III. Information Requested to be Available on First Day of Inspection, November 28 , 2011 1. For the specific heat exchangers selected:
          safety-related plant heat exchanger to be performed during the on-site portion of
  a. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g.
          the inspection.
basis for surveillance test acceptance criteria)
    6.   Copies of Corrective Action Program implementing procedures.
b. Copies of the two most recent completed tests and evaluation data confirming thermal performance
    7.   If available, electronic copies of the current Technical Specifications, Technical
for those heat exchangers which are performance tested
          Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
c. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests
                                                2                                    Enclosure
d. Information regarding any alarms which monitor on
 
-line performance
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
e. Copy of the document describing the inspection results
III. Information Requested to be Available on First Day of Inspection, November 28,
of each heat exchanger. The requested documents are to be for the time period from the onsite inspection period back to the
      2011
documents that were provided in response to the previous
      1.   For the specific heat exchangers selected:
heat sink performance  
          a.   Copy of the calculation which correlates surveillance testing results from these
inspectio n;  f. The cleaning and inspection maintenance schedule for each heat exchanger for the next  
                heat exchangers with design basis heat removal capability (e.g. basis for
5 years;   g. Copy of the design specification and heat exchanger data sheets for each heat exchanger;   h. Copy of the vendor manuals including component drawings for each heat exchanger;   i. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers
                surveillance test acceptance criteria);
j. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded
          b.   Copies of the two most recent completed tests and evaluation data confirming
k. Copy of the calculations or documents which evaluate the potential for water hammer in each heat exchanger or associated piping
                thermal performance for those heat exchangers which are performance tested;
l. Copy of the calculations that evaluate excessive tube vibration in each heat exchanger and the documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation;  
          c.   Documentation and procedures that identify the types, accuracy, and location
TRIENNIAL HEAT
                of any special instrumentation used for the two most recently completed
SINK PERFORMANCE INSPECTION
                thermal performance tests for the heat exchangers (e.g., high accuracy
DOCUMENT REQUEST
                ultrasonic flow instruments or temperature instruments). Include calibration
Enclosure 4 m. Copy of the periodic flow testing at or near maximum design flow. The requested documents are to be for the time period from the onsite inspection period back to the
                records for the instruments used during these tests;
documents that were provided in response to the previous
          d.   Information regarding any alarms which monitor on-line performance;
heat sink performance  
          e.   Copy of the document describing the inspection results of each heat
inspectio n;  n. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger
                exchanger. The requested documents are to be for the time period from the
o. Copy of the document establishing the repair criteria (plugging limit) for  
                onsite inspection period back to the documents that were provided in response
degraded tubes which are identified in each heat exchanger; p. Copies of the documents that verify the structural integrity of the heat exchanger (e.g., eddy current summary sheets, ultrasonic testing results
                to the previous heat sink performance inspection;
, and visual inspection results
          f.   The cleaning and inspection maintenance schedule for each heat exchanger
); and q. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
                for the next 5 years;
2. For the ultimate heat sink (UHS) and the safety
          g.   Copy of the design specification and heat exchanger data sheets for each heat
-related service water system (or equivalent):
                exchanger;
a. Copies of any design
          h.   Copy of the vendor manuals including component drawings for each heat
change performed on the UHS. The requested documents are to be for the time period from the onsite inspection period  
                exchanger;
back to the
          i.   Copy of the calculation which establishes the limiting (maximum) design basis
documents that were provided in response to the previous
                heat load which is required to be removed by each of these heat exchangers;
heat sink performance  
          j.   Copy of the operating procedure that ensures that the maximum cooling water
inspectio n;  b. Copies of any design
                system inlet temperature limit is not exceeded;
change performed on the safety
          k.   Copy of the calculations or documents which evaluate the potential for water
-related service water system. The requested documents are to be for the time period from the onsite inspection period back to the
                hammer in each heat exchanger or associated piping;
documents that were provided in response to the previous
          l.   Copy of the calculations that evaluate excessive tube vibration in each heat
heat sink performance  
                exchanger and the documents that describe the controls that prevent heat
inspectio n;  c. Copies of procedures for a loss of UHS
                exchanger degradation due to excessive flow induced vibration during
d. Copies of procedures for a loss of service water system
                operation;
e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt, dead mussel shells, or debris) and biotic fouling (e.g.
                                                3                                      Enclosure
, fish, algae, grass, or kelp). The requested documents are to be for
 
the time period from the onsite inspection period back to the
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
documents that were provided in response to the previous
    m. Copy of the periodic flow testing at or near maximum design flow. The
heat sink performance  
          requested documents are to be for the time period from the onsite inspection
inspectio n;  f. Copies of documents associated with the monitoring of pump performance for  
          period back to the documents that were provided in response to the previous
potential strong-pump vs. weak
          heat sink performance inspection;
-pump interaction
    n.   Copy of the document which identifies the current number of tubes in service
; and  
          for each heat exchanger and the supporting calculation which establishes the
TRIENNIAL HEAT
          maximum number of tubes which can be plugged in each heat exchanger;
SINK PERFORMANCE INSPECTION
    o.   Copy of the document establishing the repair criteria (plugging limit) for
DOCUMENT REQUEST
          degraded tubes which are identified in each heat exchanger;
Enclosure 5 g. Copies of the testing
    p.   Copies of the documents that verify the structural integrity of the heat
, inspection, or monitoring
          exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and
program procedures
          visual inspection results); and
for buried or inaccessible piping and the associated results
    q.   Copies of those documents that describe the methods taken to control water
. The requested documents are to be for the time period from the onsite inspection period back to the
          chemistry in the heat exchangers.
documents that were provided in response to the previous
2. For the ultimate heat sink (UHS) and the safety-related service water system (or
heat sink performance  
    equivalent):
inspectio n.  h. Copies of the procedures to monitor , assess , and disposition active thru wall pipe leaks, including structural evaluations and/or planned corrective actions.
        a. Copies of any design change performed on the UHS. The requested
i. History of any thru wall pipe leak on the system. The requested documents are to be for the time period from the onsite inspection period back to the
            documents are to be for the time period from the onsite inspection period
documents that were provided in response to the previous
            back to the documents that were provided in response to the previous heat
heat sink performance  
            sink performance inspection;
inspectio n.  j. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion.
        b. Copies of any design change performed on the safety-related service water
k. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the service water pump bay.
            system. The requested documents are to be for the time period from the
l. Copies of surveillance procedures and testing results performed
            onsite inspection period back to the documents that were provided in
on the service water pump bay water level instruments. The requested documents are to be for the time period from the onsite inspection period back to the
            response to the previous heat sink performance inspection;
documents that
        c. Copies of procedures for a loss of UHS;
were provided in response to the previous
        d. Copies of procedures for a loss of service water system;
heat sink performance  
        e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt,
inspectio n.  If the information requested above will not be available, please contact
            dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or
Gerard O'Dwyer
            kelp). The requested documents are to be for the time period from the onsite
as soon as possible at (630)  
            inspection period back to the documents that were provided in response to
8 29-9624, or email Gerard.ODwyer@nrc.gov
            the previous heat sink performance inspection;
.
        f.   Copies of documents associated with the monitoring of pump performance for
  M. Pacilio
            potential strong-pump vs. weak-pump interaction; and
-2- The lead inspector for this inspection is Mr. Gerard O'Dwyer. If there are questions about the material requested, or the inspection, please call Mr. O'Dwyer at (630) 829
                                          4                                        Enclosure
-9624. Please send the information to the following e
 
-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also an acceptable option.
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
It is important that these documents be as complete as possible in order to minimize the number of  
                g. Copies of the testing, inspection, or monitoring program procedures for buried
documents requested during the preparation week or during the onsite inspection. All requested documents are to be for the time period from the onsite inspection period back to the documents that  
                    or inaccessible piping and the associated results. The requested documents
were provided in response to the previous heat sink performance inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period.
                    are to be for the time period from the onsite inspection period back to the
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
                    documents that were provided in response to the previous heat sink
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
                    performance inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure  
                h. Copies of the procedures to monitor, assess, and disposition active thru wall
will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
                    pipe leaks, including structural evaluations and/or planned corrective actions.
-rm/adams.html (the Public Electronic Reading Room).
                i. History of any thru wall pipe leak on the system. The requested documents
Sincerely, /RA by A. Dunlop For/
                    are to be for the time period from the onsite inspection period back to the
  Ann Marie Stone, Chief,
                    documents that were provided in response to the previous heat sink
Engineering Branch 2
                    performance inspection.
Division of Reactor Safety  
                j. Copies of the documents associated with the periodic inspection program
Docket No. 50
                    used to detect protective coating failure, corrosion, and erosion.
-456; 50-457 License No. NPF-72; NPF-77 Enclosure:
                k. Copies of the documents associated with the monitoring, trending, and
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST cc w/encl:
                    remediation of silt accumulation at the service water pump bay.
Distribution via ListServ
                l. Copies of surveillance procedures and testing results performed on the
DISTRIBUTIONSee next page
                    service water pump bay water level instruments. The requested documents
: DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress
                    are to be for the time period from the onsite inspection period back to the
\Ltr. 081011 Braidwood HS RFI GFO.docx
                    documents that were provided in response to the previous heat sink
  Publicly Available
                    performance inspection.
  Non-Publicly Available       Sensitive         Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/en
If the information requested above will not be available, please contact Gerard ODwyer as soon
c l "N" = No copy
as possible at (630) 829-9624, or email Gerard.ODwyer@nrc.gov.
OFFICE RIII RIII     NAME GODwyer:ls AMStone   DATE 8/   /11 8/     /11  
                                                  5                                      Enclosure
  OFFICIAL RECORD COPY  
 
  Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated August  
M. Pacilio                                                                     -2-
10, 2011. SUBJECT:
The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the material
BRAIDWOOD STATION  
requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send the information to
- NOTIFICATION OF AN N
the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also
RC TRIENNIAL HEAT SINK PERFORMANCE INSPECTI
an acceptable option.
ON AND REQUEST FOR INFORMATION
It is important that these documents be as complete as possible in order to minimize the number of
INSPECTION
documents requested during the preparation week or during the onsite inspection. All requested
REPORT 05000 456/2011005; 05000
documents are to be for the time period from the onsite inspection period back to the documents that
457/2011005 (DRS)
were provided in response to the previous heat sink performance inspection. If no activities were
DISTRIBUTIONRidsNrrDorlLpl3
accomplished in that time period, then the request applies to the last applicable document in the previous
-2 Resource
time period.
: Daniel Merzke
This letter does not contain new or amended information collection requirements subject to the
RidsNrrPMBraidwood Resource
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
RidsNrrDirsIrib Resource
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
Cynthia Pederson
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                                Sincerely,
                                                                                /RA by A. Dunlop For/
                                                                                Ann Marie Stone, Chief,
                                                                                Engineering Branch 2
                                                                                Division of Reactor Safety
Docket No. 50-456; 50-457
License No. NPF-72; NPF-77
Enclosure:                 TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
cc w/encl:                 Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 081011 Braidwood HS RFI GFO.docx
Publicly Available                     Non-Publicly Available                       Sensitive                 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE                             RIII                             RIII
NAME                               GODwyer:ls                       AMStone
DATE                               8/ /11                           8/ /11
                                                              OFFICIAL RECORD COPY
 
Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated August 10, 2011.
SUBJECT:       BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK
              PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION
              INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
Daniel Merzke
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Steven Orth
Jared Heck
Jared Heck
Allan Barker
Allan Barker
DRPIII DRSIII Carole Ariano
DRPIII
Linda Linn Patricia Buckley
DRSIII
Tammy Tomczak
Carole Ariano
ROPreports Resource
Linda Linn
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 17:04, 12 November 2019

IR 05000456-11-005, 05000457-11-005 (Drs), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
ML11227A162
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/10/2011
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-11-005
Download: ML11227A162 (9)


See also: IR 05000456/2011005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 10, 2011

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT

SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)

Dear Mr. Pacilio:

On Monday, November 28, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin

the on-site portion of the Triennial Heat Sink Performance Inspection Braidwood Station. This

inspection will be performed in accordance with NRC baseline inspection procedure (IP)

71111.07T.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 17, 2011. By

October 20, 2011, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

selected heat exchangers, should be available at the Regional Office no later than

November 14, 2011. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the

inspection.

  • The last group includes the additional information above, as well as plant specific reference

material. This information should be available onsite to the inspector on Monday,

November 28, 2011. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

M. Pacilio -2-

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the

material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send

the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the

required information is also an acceptable option.

It is important that these documents be as complete as possible in order to minimize the

number of documents requested during the preparation week or during the onsite inspection.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop For/

Ann Marie Stone, Chief,

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-456; 50-457

License No. NPF-72; NPF-77

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl: Distribution via ListServ

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000456/2011005; 05000457/2011005(DRS)

Inspection Dates: November 28 thru December 2, 2011

Inspection Procedures: IP 71111.07, Heat Sink Performance

Lead Inspector: Gerard ODwyer

(630) 829-9624

Gerard.odwyer@nrc.gov

I. Information Requested By October 17, 2011

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two system health report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

1 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

II. Information Requested By November 14, 2011

1. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to

the GL 89-13 Heat Exchanger Program.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. For the specific heat exchangers selected:

a. Copies of the applicable UFSAR sections for each heat exchanger.

b. Copy of system description and design basis document for the heat

exchangers (as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

4. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g. UFSAR or Technical Requirements Manual)

that states the maximum cooling water system inlet temperature limit that

still allows full licensed power operation of the nuclear reactor.

5. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion of

the inspection.

6. Copies of Corrective Action Program implementing procedures.

7. If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

2 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection, November 28,

2011

1. For the specific heat exchangers selected:

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g. basis for

surveillance test acceptance criteria);

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested;

c. Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests;

d. Information regarding any alarms which monitor on-line performance;

e. Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response

to the previous heat sink performance inspection;

f. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years;

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

h. Copy of the vendor manuals including component drawings for each heat

exchanger;

i. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers;

j. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded;

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping;

l. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during

operation;

3 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

m. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection;

n. Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger;

p. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and

visual inspection results); and

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of any design change performed on the UHS. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection;

b. Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection;

c. Copies of procedures for a loss of UHS;

d. Copies of procedures for a loss of service water system;

e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or

kelp). The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to

the previous heat sink performance inspection;

f. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction; and

4 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

g. Copies of the testing, inspection, or monitoring program procedures for buried

or inaccessible piping and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

h. Copies of the procedures to monitor, assess, and disposition active thru wall

pipe leaks, including structural evaluations and/or planned corrective actions.

i. History of any thru wall pipe leak on the system. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

j. Copies of the documents associated with the periodic inspection program

used to detect protective coating failure, corrosion, and erosion.

k. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

l. Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

If the information requested above will not be available, please contact Gerard ODwyer as soon

as possible at (630) 829-9624, or email Gerard.ODwyer@nrc.gov.

5 Enclosure

M. Pacilio -2-

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the material

requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send the information to

the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also

an acceptable option.

It is important that these documents be as complete as possible in order to minimize the number of

documents requested during the preparation week or during the onsite inspection. All requested

documents are to be for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection. If no activities were

accomplished in that time period, then the request applies to the last applicable document in the previous

time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop For/

Ann Marie Stone, Chief,

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-456; 50-457

License No. NPF-72; NPF-77

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 081011 Braidwood HS RFI GFO.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII RIII

NAME GODwyer:ls AMStone

DATE 8/ /11 8/ /11

OFFICIAL RECORD COPY

Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated August 10, 2011.

SUBJECT: BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)

DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource

Daniel Merzke

RidsNrrPMBraidwood Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

DRPIII

DRSIII

Carole Ariano

Linda Linn

Patricia Buckley

Tammy Tomczak

ROPreports Resource