ML120650596: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML120650596
| number = ML120650596
| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Summer - EOC Report 22
| title = EOC Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 1 03/05/2012 08:39:58 Report 22 03/01/2012
{{#Wiki_filter:Page 1 of 1                                                                                 Summer 03/05/2012     08:39:58                                                         Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit         Planned Dates                                                                                                                                     No. of Staff Number        Start     End     Inspection Activity                                                               Title                                         on Site TI-177       - TI-177 GAS INTRUSION                                                                                                     3 1         03/26/2012  03/30/2012  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System SUM TFPI     - TRIENNIAL FIRE PROTECTION INSPECTION                                                                                     5 1         04/24/2012   04/26/2012   IP 7111105T            Fire Protection [Triennial]
-06/30/2013 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Summer TI-177-TI-177 GAS INTRUSION 3 1     IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/26/2012 03/30/2012 SUM TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1     IP Fire Protection [Triennial]
1          05/07/2012   05/11/2012   IP 7111105T            Fire Protection [Triennial]
7111105T 04/24/2012 04/26/2012 1    IP Fire Protection [Triennial]
1          05/21/2012   05/25/2012   IP 7111105T            Fire Protection [Triennial]
7111105T 05/07/2012 05/11/2012 1    IP Fire Protection [Triennial]
NRR           - NFPA 805 AUDIT BY NRR                                                                                                 17 1         06/04/2012  06/08/2012  IP 7111105P            Fire Protection-NFPA 805 Transition Period [Triennial]
7111105T 05/21/2012 05/25/2012 NRR-NFPA 805 AUDIT BY NRR 17 1     IP Fire Protection-NFPA 805 Transition Period [Triennial]
PSB1-RP       - PUBLIC RADIATION SAFETY BASELINE                                                                                         3 1         08/27/2012  08/31/2012  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/27/2012   08/31/2012   IP 71124.07            Radiological Environmental Monitoring Program 1          08/27/2012   08/31/2012   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1          08/27/2012   08/31/2012   IP 71151                Performance Indicator Verification PSB1EP       - EMERGENCY PREPAREDNESS INSPECTION                                                                                       2 1         09/10/2012  09/14/2012  IP 7111402              Alert and Notification System Testing 1          09/10/2012   09/14/2012   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          09/10/2012   09/14/2012   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          09/10/2012   09/14/2012   IP 71151                Performance Indicator Verification PI&R         - PROBLEM IDENTIFICATION AND RESOLUTION                                                                                   5 1         09/10/2012   09/14/2012   IP 71152B              Problem Identification and Resolution 1          09/24/2012   09/28/2012   IP 71152B              Problem Identification and Resolution PSB1-RP       - RADIOLOGICAL HAZARD ASSESSMENT                                                                                           2 1         10/15/2012   10/19/2012   IP 71124.01            Radiological Hazard Assessment and Exposure Controls EB3 ISI       - SUM ISI AND RPVH EXAMS                                                                                                   2 1         10/22/2012   10/26/2012   IP 7111108P            Inservice Inspection Activities - PWR TI-182       - TI-182 BURIED PIPING/TANK - PHASE 1                                                                                     1 1         03/11/2013  03/15/2013  IP 2515/182            Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MODS         - PERM MODS 50.59 INSPECTION                                                                                               4 1         04/01/2013  04/05/2013  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1          04/15/2013   04/19/2013   IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications HS           - TRIENNIAL HEAT SINK PERFORMANCE                                                                                         1 1         06/17/2013   06/21/2013   IP 7111107T            Heat Sink Performance This report does not include INPO and OUTAGE activities.
7111105P 06/04/2012 06/08/2012 PSB1-RP-PUBLIC RADIATION SAFETY BASELINE 3 1     IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/27/2012 08/31/2012 1    IP Radiological Environmental Monitoring Program 71124.07 08/27/2012 08/31/2012 1    IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/27/2012 08/31/2012 1    IP Performance Indicator Verification 71151 08/27/2012 08/31/2012 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 2 1     IP A lert and Notification System Testing 7111402 09/10/2012 09/14/2012 1    IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/10/2012 09/14/2012 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/10/2012 09/14/2012 1    IP Performance Indicator Verification 71151 09/10/2012 09/14/2012 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1     IP Problem Identification and Resolution 71152B 09/10/2012 09/14/2012 1    IP Problem Identification and Resolution 71152B 09/24/2012 09/28/2012 PSB1-RP-RADIOLOGICAL HAZARD ASSESSMENT 2 1     IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2012 10/19/2012 EB3 ISI-SUM ISI AND RPVH EXAMS 2 1     IP Inservice Inspection Activities - PWR 7111108P 10/22/2012 10/26/2012 TI-182-TI-182 BURIED PIPING/TANK - PHASE 1 1 1     IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/11/2013 03/15/2013 MODS-PERM MODS 50.59 INSPECTION 4 1     IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/01/2013 04/05/2013 1    IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/15/2013 04/19/2013 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1     IP Heat Sink Performance 7111107T 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                               Enclosure}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 07:14, 12 November 2019

EOC Report 22
ML120650596
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
Shared Package
ML120650581 List:
References
IR-11-007
Download: ML120650596 (1)


Text

Page 1 of 1 Summer 03/05/2012 08:39:58 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-177 - TI-177 GAS INTRUSION 3 1 03/26/2012 03/30/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System SUM TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 1 04/24/2012 04/26/2012 IP 7111105T Fire Protection [Triennial]

1 05/07/2012 05/11/2012 IP 7111105T Fire Protection [Triennial]

1 05/21/2012 05/25/2012 IP 7111105T Fire Protection [Triennial]

NRR - NFPA 805 AUDIT BY NRR 17 1 06/04/2012 06/08/2012 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial]

PSB1-RP - PUBLIC RADIATION SAFETY BASELINE 3 1 08/27/2012 08/31/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/27/2012 08/31/2012 IP 71124.07 Radiological Environmental Monitoring Program 1 08/27/2012 08/31/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/27/2012 08/31/2012 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 2 1 09/10/2012 09/14/2012 IP 7111402 Alert and Notification System Testing 1 09/10/2012 09/14/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/10/2012 09/14/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/10/2012 09/14/2012 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 09/10/2012 09/14/2012 IP 71152B Problem Identification and Resolution 1 09/24/2012 09/28/2012 IP 71152B Problem Identification and Resolution PSB1-RP - RADIOLOGICAL HAZARD ASSESSMENT 2 1 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EB3 ISI - SUM ISI AND RPVH EXAMS 2 1 10/22/2012 10/26/2012 IP 7111108P Inservice Inspection Activities - PWR TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1 1 1 03/11/2013 03/15/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MODS - PERM MODS 50.59 INSPECTION 4 1 04/01/2013 04/05/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 04/15/2013 04/19/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/17/2013 06/21/2013 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure