ML13043A406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13043A406
| number = ML13043A406
| issue date = 02/12/2013
| issue date = 02/12/2013
| title = Susquehanna Steam Electric Station Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to In
| title = Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to Increase Diesel
| author name = Mathew R K
| author name = Mathew R
| author affiliation = NRC/NRR/DE/EEEB
| author affiliation = NRC/NRR/DE/EEEB
| addressee name = Khanna M K
| addressee name = Khanna M
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| docket = 05000387, 05000388
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| license number = NPF-014, NPF-022
| contact person = Li R S
| contact person = Li R
| case reference number = TAC ME9607
| case reference number = TAC ME9607
| document type = Memoranda, Request for Additional Information (RAI)
| document type = Memoranda, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 12, 2013 MEMORANDUM TO:                 Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                         Roy Mathew, Acting Chief       /RA/
February 12, 2013 MEMORANDUM TO:   Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:       Roy Mathew, Acting Chief /RA/ Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)  
SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)
 
By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.
By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.
In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum
In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum  


==Enclosure:==
==Enclosure:==


As stated CONTACTS: Rui Li, NRR/EEEB (301) 415-3554  
As stated CONTACTS: Rui Li, NRR/EEEB (301) 415-3554 G. Matharu, NRR/EEEB (301) 415-4057


G. Matharu, NRR/EEEB (301) 415-4057 February 12, 2013 MEMORANDUM TO:   Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:       Roy Mathew, Acting Chief /RA/ Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
February 12, 2013 MEMORANDUM TO:                   Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                             Roy Mathew, Acting Chief       /RA/
Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)
SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)
By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.  
By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.
 
In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum
In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum  


==Enclosure:==
==Enclosure:==
As stated  CONTACTS: Rui Li, NRR/EEEB  (301) 415-3554  (301) 415-4057  DISTRIBUTION:  RLi  GMatharu  RMathew EEEB R/F JWhited    NRR_DE_DPR_Resource  RidsNrrDeEeeb 


ADAMS ACCESSION No.: ML13043A406 OFFICE NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB NAME RLi GMatharu RMathew DATE 02/1/13 02/1 /13 02/12/13       OFFICIAL RECORD COPY ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION REGARDING SUSQUEHANNA STEAM ELECTRIC STATION  LICENSE AMENDMENT REQUEST TO CHANGE  DIESEL GENERATOR SURVEILLANCE REQUIREMENTS TAC NO. ME9607    By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8. that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.
As stated CONTACTS:        Rui Li, NRR/EEEB (301) 415-3554 (301) 415-4057 DISTRIBUTION: RLi                GMatharu        RMathew      EEEB R/F      JWhited NRR_DE_DPR_Resource              RidsNrrDeEeeb ADAMS ACCESSION No.: ML13043A406 NRR/DE/EEEB         NRR/DE/EEEB         NRR/DE/EEEB OFFICE NAME                 RLi             GMatharu           RMathew DATE               02/1/13             02/1 /13           02/12/13 OFFICIAL RECORD COPY


Surveillance requirements must assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operations are met. The Electrical Engineering Branch has reviewed the license amendment request (LAR) and developed the following questions regarding the proposed change.
REQUEST FOR ADDITIONAL INFORMATION REGARDING SUSQUEHANNA STEAM ELECTRIC STATION LICENSE AMENDMENT REQUEST TO CHANGE DIESEL GENERATOR SURVEILLANCE REQUIREMENTS TAC NO. ME9607 By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8. that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.
1. The proposed change modifies voltage requirements in selective SRs only. The License Amendment Request (LAR) states that SRs associated with DG operation in droop mode are not being revised as voltage and frequency are manually adjusted to allow connection to the grid. The staff considers that all SRs in TS 3.8.1, associated with the DG, demonstrate operational readiness of the DG to perform its intended design functions as delineated in the SSES FSAR Section 8.1.1. The SRs which require DG operation in droop mode should also demonstrate the ability of the DG to achieve required voltage and frequency prior to connecting to the grid. Explain: a. The intent of the voltage range in the SRs not included for change in the amendment. b. How the steady state voltage requirements, currently associated with droop mode SRs, will demonstrate DG operability if the safety busses are below the minimum required 4000 Volts proposed in the LAR. 2. The LAR proposes a new voltage range of  4000 V and  4400 V for SRs 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19. The current requirements of induction motors and other voltage sensitive equipment vary according to available voltage and frequency. Provide excerpts from calculations that validate DG loading when operating at extremes of the proposed voltage range.  
Surveillance requirements must assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operations are met.
}}
The Electrical Engineering Branch has reviewed the license amendment request (LAR) and developed the following questions regarding the proposed change.
: 1. The proposed change modifies voltage requirements in selective SRs only. The License Amendment Request (LAR) states that SRs associated with DG operation in droop mode are not being revised as voltage and frequency are manually adjusted to allow connection to the grid. The staff considers that all SRs in TS 3.8.1, associated with the DG, demonstrate operational readiness of the DG to perform its intended design functions as delineated in the SSES FSAR Section 8.1.1. The SRs which require DG operation in droop mode should also demonstrate the ability of the DG to achieve required voltage and frequency prior to connecting to the grid. Explain:
: a. The intent of the voltage range in the SRs not included for change in the amendment.
: b. How the steady state voltage requirements, currently associated with droop mode SRs, will demonstrate DG operability if the safety busses are below the minimum required 4000 Volts proposed in the LAR.
: 2. The LAR proposes a new voltage range of  4000 V and  4400 V for SRs 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19. The current requirements of induction motors and other voltage sensitive equipment vary according to available voltage and frequency.
Provide excerpts from calculations that validate DG loading when operating at extremes of the proposed voltage range.
ENCLOSURE}}

Latest revision as of 23:12, 4 November 2019

Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to Increase Diesel
ML13043A406
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/12/2013
From: Roy Mathew
Electrical Engineering Branch
To: Meena Khanna
Plant Licensing Branch 1
Li R
References
TAC ME9607
Download: ML13043A406 (3)


Text

February 12, 2013 MEMORANDUM TO: Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Roy Mathew, Acting Chief /RA/

Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)

By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.

In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum

Enclosure:

As stated CONTACTS: Rui Li, NRR/EEEB (301) 415-3554 G. Matharu, NRR/EEEB (301) 415-4057

February 12, 2013 MEMORANDUM TO: Meena K Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Roy Mathew, Acting Chief /RA/

Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 309 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 280 TO LICENSE NPF-22: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12, AND 3.8.1.19 TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NO. ME9607)

By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8.1 that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.

In an effort to complete our review, the EEEB staff has attached a request for additional information that should be transmitted to the licensee for a formal written response. The written response should be provided to the EEEB staff within 45 days upon the issuance date of this memorandum

Enclosure:

As stated CONTACTS: Rui Li, NRR/EEEB (301) 415-3554 (301) 415-4057 DISTRIBUTION: RLi GMatharu RMathew EEEB R/F JWhited NRR_DE_DPR_Resource RidsNrrDeEeeb ADAMS ACCESSION No.: ML13043A406 NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB OFFICE NAME RLi GMatharu RMathew DATE 02/1/13 02/1 /13 02/12/13 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION REGARDING SUSQUEHANNA STEAM ELECTRIC STATION LICENSE AMENDMENT REQUEST TO CHANGE DIESEL GENERATOR SURVEILLANCE REQUIREMENTS TAC NO. ME9607 By letter dated September 18, 2012 (Agencywide Documents Access and Management System Accession No. ML12262A322), PPL Susquehanna, LLC (PPL) submitted a request for amendment to the Technical Specifications (TS), of the Facility Operating License No. NPF-14 and NPF22 for the Susquehanna Steam Electric Station (SSES). The changes would modify the TS Surveillance Requirements (SR) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19, in TS 3.8. that will improve operation and testing of Diesel Generators (DG) and will provide a more restrictive voltage band for operation.

Surveillance requirements must assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operations are met.

The Electrical Engineering Branch has reviewed the license amendment request (LAR) and developed the following questions regarding the proposed change.

1. The proposed change modifies voltage requirements in selective SRs only. The License Amendment Request (LAR) states that SRs associated with DG operation in droop mode are not being revised as voltage and frequency are manually adjusted to allow connection to the grid. The staff considers that all SRs in TS 3.8.1, associated with the DG, demonstrate operational readiness of the DG to perform its intended design functions as delineated in the SSES FSAR Section 8.1.1. The SRs which require DG operation in droop mode should also demonstrate the ability of the DG to achieve required voltage and frequency prior to connecting to the grid. Explain:
a. The intent of the voltage range in the SRs not included for change in the amendment.
b. How the steady state voltage requirements, currently associated with droop mode SRs, will demonstrate DG operability if the safety busses are below the minimum required 4000 Volts proposed in the LAR.
2. The LAR proposes a new voltage range of 4000 V and 4400 V for SRs 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19. The current requirements of induction motors and other voltage sensitive equipment vary according to available voltage and frequency.

Provide excerpts from calculations that validate DG loading when operating at extremes of the proposed voltage range.

ENCLOSURE