ML053070490

From kanterella
Jump to navigation Jump to search
Forthcoming Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna, Units 1 and 2 to Conduct a Working level-discussion Related to the Schedule, Approach, and Strategy for the Proposed Extended Power Uprate Application..
ML053070490
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/03/2005
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLA
To: Richard Laufer
NRC/NRR/ADRO/DORL/LPLA
Guzman R, NRR/DLPM 415-1030
References
Download: ML053070490 (7)


Text

November 3, 2005 MEMORANDUM TO: Richard J. Laufer, Branch Chief Plant Licensing Branch A Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (NRR)

FROM: Richard V. Guzman, Project Manager /RA/

Plant Licensing Branch A Division of Operating Reactor Licensing, NRR

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL),

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2)

DATE & TIME: Tuesday, November 15, 2005 9:00 a.m. - 12:30 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-12-B-4 Rockville, Maryland PURPOSE: To conduct a working level-discussion related to the schedule, approach, and strategy for the proposed SSES 1 and 2 extended power uprate (EPU) application related to flow induced vibration, steam dryers, and containment analysis.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting (see Agenda) and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned.

MEETING CONTACTS: Rich Guzman, NRR Tim Colburn, NRR 301-415-1030 301-415-1402 rvg@nrc.gov tgc@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

R. Laufer PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and General Electric (GE).

NRC Thomas Alexion, NRR, Division of Policy and Rulemaking (DPR),

Special Projects Branch Quynh Nguyen, NRR, DPR, Special Projects Branch Rich Guzman, NRR, Division of Operating Reactor Licensing Kamal Manoly, NRR, Division of Engineering (DE), Engineering Mechanics Branch Cheng-Ih Wu, NRR, Engineering Mechanics Branch Robert Dennig, NRR, Division of Risk Assessment, Containment and Ventilation Branch PPL John Bartos, EPU Engineering Lead John Oddo, EPU Licensing Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems Joseph Ferrante (Consulant, Delta Energy Services)

Santo Ferrarello (Consultant, Applied Analysis Corporation)

Kevin McNulty (Consultant, Aerotek Energy Services)

Lillian Schor (Consultant, Areva)

Alan Bilanin (Consultant, Continuum Dynamics)

Karen Fujikawa (Consultant, Structural Integrity Engineering)

GE Dan Papone, Principal Engineer Larry King, Project Manager George Stramback, Licensing Manager Dilip Rao, Containment Analysis Lead Docket Nos. 50-387 and 50-388

Enclosure:

Agenda cc w/encl: See next page

R. Laufer PARTICIPANTS: Participants consist of members of the Office of Nuclear Reactor Regulation (NRR), PPL Susquehanna, and General Electric (GE).

NRC Thomas Alexion, NRR, Division of Policy and Rulemaking (DPR),

Special Projects Branch Quynh Nguyen, NRR, DPR, Special Projects Branch Rich Guzman, NRR, Division of Operating Reactor Licensing Kamal Manoly, NRR, Division of Engineering (DE), Engineering Mechanics Branch Cheng-Ih Wu, NRR, Engineering Mechanics Branch Robert Dennig, NRR, Division of Risk Assessment, Containment and Ventilation Branch PPL John Bartos, EPU Engineering Lead John Oddo, EPU Licensing Kevin Browning, EPU Nuclear Steam Supply System/Emergency Core Cooling Containment Spray Systems Joseph Ferrante (Consulant, Delta Energy Services)

Santo Ferrarello (Consultant, Applied Analysis Corporation)

Kevin McNulty (Consultant, Aerotek Energy Services)

Lillian Schor (Consultant, Areva)

Alan Bilanin (Consultant, Continuum Dynamics)

Karen Fujikawa (Consultant, Structural Integrity Engineering)

GE Dan Papone, Principal Engineer Larry King, Project Manager George Stramback, Licensing Manager Dilip Rao, Containment Analysis Lead Docket Nos. 50-387 and 50-388

Enclosure:

Agenda cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLA R/F SLittle RLaufer RGuzman BSheron TMarsh/CHaney CHolden PMNS KManoly OPA TMensah ACRS OGC CWu CMiller, EDO, RGN-I TColburn BBickett JTrapp RDennig Receptionist (OWFN and TWFN) TAlexion QNguyen ACCESSION NO.: ML053070490 OFFICE NRR/LPLA/PM NRR/LPLA/LA NRR/LPLA/BC NAME RGuzman SLittle RLaufer DATE 11/03/05 11/03/05 11/03/05 OFFICIAL RECORD COPY

PPL SUSQUEHANNA, LLC U.S. NUCLEAR REGULATORY COMMISSION NOVEMBER 15, 2005 EXTENDED POWER UPRATE PRE-APPLICATION MEETING RELATED TO FLOW INDUCED VIBRATION, STEAM DRYER, AND CONTAINMENT ANALYSIS AGENDA INTRODUCTIONS 9:00 a.m. - 9:05 a.m.

OBJECTIVES 9:05 a.m. - 9:10 a.m.

INITIAL STAFF COMMENTS 9:10 a.m. - 9:30 a.m.

VIBRATION MONITORING METHOD 9:30 a.m. - 10:15 a.m.

AND ACCEPTANCE CRITERIA STEAM DRYER PREDICTION, ASSESSMENT, 10:15 a.m. - 10:45 a.m.

AND TESTING BREAK 10:45 a.m. - 11:00 a.m.

CONTAINMENT ANALYSIS 11:00 a.m. - 11:50 a.m.

SUMMARY

AND SCHEDULE REVIEW 11:50 a.m. - 12:10 p.m.

PUBLIC COMMENTS 12:10 p.m. - 12:25 p.m.

CONCLUSIONS AND CLOSING REMARKS 12:25 p.m. - 12:30 p.m.

Enclosure

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinney Michael H. Crowthers Sr. Vice President and Supervising Engineer Chief Nuclear Officer Nuclear Regulatory Affairs PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENPL4 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert A. Saccone Steven M. Cook Vice President - Nuclear Operations Manager - Quality Assurance PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Berwick, PA 18603-0467 Aloysius J. Wrape, III Luis A. Ramos General Manager - Performance Community Relations Manager, Improvement and Oversight Susquehanna PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 634 Salem Blvd., SSO Allentown, PA 18101-1179 Berwick, PA 18603-0467 Terry L. Harpster Bryan A. Snapp, Esq General Manager - Plant Support Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSA4 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Richard D. Pagodin Supervisor - Document Control Services General Manager - Nuclear Engineering PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB3 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Walter E. Morrissey Pennsylvania Department of Supervising Engineer Environmental Protection Nuclear Regulatory Affairs Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803