Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARPLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage Project stage: Request ML12291A4992012-10-19019 October 2012 Acceptance of Requested Licensing Action Change to Technical Specification Surveillance Requirement 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State. Project stage: Acceptance Review ML13043A4062013-02-12012 February 2013 Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to Increase Diesel Project stage: Other ML13305A8912013-11-13013 November 2013 Request for Additional Information Regarding Request to Change Technical Specification 3.3.6.1 Project stage: RAI ML13298A7582014-03-0707 March 2014 Request for Additional Information Regarding Request for Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage (TAC ME9607 and ME960) Project stage: RAI PLA-7243, Withdrawal of Proposed Amendments for Diesel Generator Testing Use of Increased Minimum Steady State Voltage and New Frequency Tolerance2014-12-22022 December 2014 Withdrawal of Proposed Amendments for Diesel Generator Testing Use of Increased Minimum Steady State Voltage and New Frequency Tolerance Project stage: Withdrawal ML15027A6112015-02-0909 February 2015 Withdrawal of an Amendment Request Project stage: Withdrawal 2013-02-12
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23352A2542023-12-18018 December 2023 NRC LIC-109 Acceptance Review Results for Susquehanna Steam Electric Station, License Amendment Request to Revise Technical Specifications (TS) to Adopt TSTF-568 ML20178A6502020-06-26026 June 2020 Acceptance Review for Susquehanna - Revise Technical Specification 3.8.1 to Create a New Condition for an Inoperable Manual Synchronization Circuit ML19234A1222019-08-19019 August 2019 Acceptance Review: Susquehanna Units 1 and 2 License Amendment Request for TSTF-535 ML19039A0892019-02-0808 February 2019 Acceptance of Requested Licensing Action License Amendment Request to Revise Emergency Service Water Piping Technical Specifications During Replacement ML19003A4752019-01-0303 January 2019 Acceptance Review Susquehanna Units 1 and 2 License Amendment Request for TSTF-501 ML17089A3132017-04-0505 April 2017 Acceptance of Requested Licensing Action License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (CAC Nos. MF9131 & MF9132) ML16263A3442016-09-23023 September 2016 Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re: License Amendment Request to Address Secondary Containment Access Openings (CAC Nos. MF8214 and MF8215) ML16109A3362016-04-26026 April 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 to Allow Replacement of Unit 1 480 Volt Engineered Safeguard System Load Center Transformers ML16060A2302016-03-24024 March 2016 Acceptance of Requested Licensing Action License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.71 and 3.87 to Allow Replacement of Unit 1 480V Ess Load Center Transformers ML15183A3452015-07-0202 July 2015 E-mail from Jwhited to Jjennings SSES Relief Requests 3RR-19, 3RR-20, and 3RR-21 Identified Information Insufficiencies (TAC Nos. MF6302 Through MF6307) ML15050A2192015-02-19019 February 2015 Acceptance of Requested Licensing Action Changes to the Cyber Security Plan Implementation Schedule ML14350B3542014-12-16016 December 2014 E-mail from J. Whited to D. Filchner: Susquehanna Steam Electric Station Acceptance of License Amendment Request Implementation of TSTF-425 ML14330A2392014-11-26026 November 2014 E-mail from J. Whited to D. Filchner Susquehanna Steam Electric Station Units 1 and 2 Acceptance of Requested Licensing Action Relief Request 4RR-01 ML14216A5562014-08-0404 August 2014 Acceptance of Requested Licensing Action Request for Order Approving Indirect Transfer of Control and Conforming License Amendments ML13127A2702013-05-0707 May 2013 Acceptance of Requested Licensing Action Relief Request 3RR-20 ML13018A4402013-01-18018 January 2013 Email Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Re_ Low Pressure Safety Limit and Reference Changes (TAC Nos. MF0410 and MF0411) ML12291A4992012-10-19019 October 2012 Acceptance of Requested Licensing Action Change to Technical Specification Surveillance Requirement 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State. ML1112401992011-05-0404 May 2011 ME6036 & ME6037, Acceptance Review CLIIP LAR to Adopt TSTF- 514. Rev 3 ML1018807512010-07-0707 July 2010 Acceptance of Requested Licensing Action Susquehanna Units 1 and 2 Relief Request RR-02 (TAC No. ME4068 & ME4069) ML1007501422010-03-16016 March 2010 TAC ME3320, Acceptance Review Relief Request RR-07 on Test Frequency for Ms SRVs ML0935800172009-12-24024 December 2009 ME2629 & ME2888, Acceptance Review of Relief Requests RR-07 & RR-08 Extension of Testing Interval for Ms SRVs 2023-12-18
[Table view] Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 19, 2012 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603-0467 SUB~IECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CHANGE TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS TO INCREASE DIESEL GENERATOR MINIMUM STEADY STATE VOLTAGE (TAC NOS. ME9607 AND ME9608)
Dear Mr. Rausch:
By letter dated September 18, 2012,1 PPL Susquehanna, LLC, (PPL) submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2. The proposed amendments would change Technical Specification Surveillance Requirements 3.8.1.9, 3.8.1 .11, 3.8.1.12 and 3.8.1.19 in TS 3.8.1, !lAC Source- Operating." Specifically, the proposed amendments will increase Diesel Generator acceptable minimum steady state voltage when operating in emergencyfisochronous mode. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
1 Agencywide Documents Access and Management System Accession No. ML12262A322.
T. Rausch - 2 In your September 18, 2012, letter you requested that the NRC review be completed by April 12, 2013. The NRC staff did not find adequate justification for an expedited review, and cannot guarantee that the review will be completed by April 12, 2013. The NRC staff considers any review that is requested to be completed in less than 12 months to be an expedited review.
This was conveyed to Mr. John Tripoli, of your staff, on October 3, 2012.
If you have any questions, please contact me, at (301) 415-4090.
Sincerely, fffti U4 Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc: Distribution via Listserv
ML12291A499 *via email OFFICE DORLILPLI-21 PM DORLlLPL 1-2/LAit DORLILPLI-21 LA DE/EEEB/BC' MKhanna NAME JWhited SLent ABaxter* JAndersen JWhited (PBamford for)
-'---~~~-'-----11 DATE 10/18/2012 10/18/2012 10/18/2012 10/19/2012 10/19/2012 10/19/201