ML060810701

From kanterella
Jump to navigation Jump to search
04/05/06 - Forthcoming Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) on License Renewal and Extended Power Uprate
ML060810701
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/22/2006
From: Hoffmann S
NRC/NRR/ADRO/DLR/RLRB
To: Jacob Zimmerman
NRC/NRR/ADRO/DLR/RLRB
Hoffman ST, NRR, 415-3245
References
Download: ML060810701 (6)


Text

March 22, 2006

MEMORANDUM TO:Jacob I. Zimmerman, Branch Chief License Renewal Branch B Division of License Renewal Office of Nuclear Reactor RegulationFROM:Stephen T. Hoffman, Senior Project Manager /ra/License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL), SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) ON LICENSE RENEWAL AND EXTENDED POWER UPRATEDATE & TIME:Wednesday, April 5, 20061:30 p.m. - 2:30 p.m. LOCATION:U.S. Nuclear Regulatory Commission (NRC)One White Flint North 11555 Rockville Pike, Room O-13B4Rockville, Maryl and 20852PURPOSE:To discuss PPL's schedules and approach for submitting requests forextended power uprates in conjunction with submittal of license renewal applications.CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe thismeeting and will have one or more opportunities to communicate withthe NRC after the business portion but before the meeting is adjour ned. ACCOMMODATIONS:If special equipment or accommodations are needed to attend orpresent information at the public meeting, the need should be broughtto the attention of Mr. Hoffman, at 301-415-3245 at least four business days prior to the meeting to provide the NRC staff adequate notice todetermine whether the request can be accommodated.CONTACT:Stephen T. Hoffman, NRR301-415-3245 sth@nrc.gov*Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"67 Federal Register 36920, May 28, 2002.

J. Zimmerman- 2 -PARTICIPANTS:Participants include members from the Office of Nuclear ReactorRegulation (NRR), and PPL Susquehanna.NRC/NRR PPL F. GillespieR. SgarroL. LundJ. Oddo Y. Diaz-Sanabria,M. Dettimore, et al.et al.Docket Nos. 50-387 and 50-388cc: See next page J. Zimmerman- 2 -PARTICIPANTS:Participants include members from the Office of Nuclear ReactorRegulation (NRR), and PPL Susquehanna.NRC/NRR PPL F. GillespieR. SgarroL. LundJ. Oddo Y. Diaz-Sanabria,M. Dettimore, et al.et al.Docket Nos. 50-387 and 50-388cc: See next page DISTRIBUTION: See next pageAdams Accession No. ML060810701E:\Filenet\ML060810701.wpdOFFICEPM:RLRB:DLRLA:RLRA:DLRBC:RLRB:DLRNAMESHoffmanYEdmondsJZimmermanDATE03/ 22 /0603/ 22 /0603/ 22 /06OFFICIAL RECORD COPY Memo to: Jacob I. Zimmerman, from Stephen T. Hoffman, dated: March 22, 2006

SUBJECT:

FORTHCOMING MEETING WITH PPL SUSQUEHANNA, LLC (PPL), SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) ON LICENSE RENEWAL AND EXTENDED POWER UPRATEHARD COPYlDLR RF E-MAIL:PUBLICRidsNrrDss RidsNrrDssSbwb RidsNrrDssSpwb RidsNrrDssSnpb RidsNrrDssSbpb RidsNrrDci RidsNrrDciCsgb RidsNrrDciCpnb RidsNrrDciCvib RidsNrrDciCptb RidsNrrDe RidsNrrDeEemb RidsNrrDeEgcb RidsNrrDeEicb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDeEqvb RidsNrrDra RidsNrrAfpb RidsNrrAcvb K. Winsberg R. Weisman S. Duraiswamy S. Smith (srs3)

Y. L. (Renee) Li DLR RLR/REB Staff


R. Guzman R. Laufer T. Alexion C. Colleli T. Mensah OPA, (RidsOpaMailCenter)

OCA, (RidsOcaMailCenter)

PMNS Susquehanna Steam Electric StationUnits 1 and 2 cc:

Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3Berwick, PA 18603-0467Robert A. SacconeVice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3Berwick, PA 18603-0467Aloysius J. Wrape, IIIGeneral Manager - Performance Improvement and Oversight PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Terry L. HarpsterGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Walter E. MorrisseySupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Steven M. CookManager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266Director, Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Susquehanna Steam Electric Station-2-Units 1 and 2 cc:

Regional Administrator, Region 1U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township

P.O. Box 405 Berwick, PA 18603-0035Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803Mr. James RossNuclear Energy Institute 1776 I St., N.W., Suite 400 Washington, DC 20006-3708