MONTHYEARPMNS20240138, Energysolutions Presentation to NRC on Decommissioning Activities at Three Mile Island Station, Unit 2 (TMI-2)2024-02-0909 February 2024
[Table view]Energysolutions Presentation to NRC on Decommissioning Activities at Three Mile Island Station, Unit 2 (TMI-2) PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230921, Presubmittal Meeting on Proposed Alternative for Susquehanna Steam Electric Station, Unit 22023-08-0909 August 2023 Presubmittal Meeting on Proposed Alternative for Susquehanna Steam Electric Station, Unit 2 PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules PMNS20230054, Test Meeting PMNS-1702023-01-13013 January 2023 Test Meeting PMNS-170 PMNS20230018, Planned Emergency License Amendment Request Regarding Control Rod Technical Specifications2023-01-0909 January 2023 Planned Emergency License Amendment Request Regarding Control Rod Technical Specifications ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20210002, Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station2021-01-0505 January 2021 Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19298C0222019-11-0505 November 2019 Agenda - Peach Bottom APS 2 and 3 Sc Draft Meeting Agenda - Sc - November 5, 2019 ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML14232A3452014-08-20020 August 2014 Notice of Public Meeting with PPL, Susquehanna Steam Electric Station, Unit 2, to Discuss Results of Nrc'S Supplemental Inspection Procedure 95002 ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14072A2512014-03-13013 March 2014 April 09, 2014, Notice of Category 1 Public Meeting with PPL Susquehanna to Discuss to Discuss Annual Assessment ML14071A5322014-03-12012 March 2014 2014 Susquehanna Steam Electric Station Annual Assessment Meeting Notice, for April 9, 2014 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13262A1632013-09-23023 September 2013 Meeting Report - Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Public Meeting ML13256A2982013-09-12012 September 2013 09/25/2013 Notice of Meeting with the U.S. Department of Energy to Discuss the Three Mile Island Unit 2 License Renewal ML13221A4462013-08-12012 August 2013 Meeting Notice: to Discuss the Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Submittal and Obtain Public Comments ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13136A2032013-05-20020 May 2013 Meeting Notice with Exelon Generation Company, LLC, to Discuss Once Through Steam Generator Tube-to-Tube Wear at Three Mile Island, Unit 1 ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12271A0212012-09-27027 September 2012 October 16, 2012 - Notice of Licensee Meeting with PPL Susquehanna, LLC Regarding Two Substantive Cross-Cutting Issues at the Susquehanna Steam Electric Station ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12153A1872012-06-0101 June 2012 Closed Meeting Notice for Suquehanna Steam Electric Station, Units 1 and 2, Annual Assessment Meeting Scheduled for June 14, 2012 ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML12066A0772012-03-0707 March 2012 Notice of Public Meeting with PPL Susquehanna, LLC to Discuss the Results of the Nrc'S Supplemental Inspection Procedure 95002,conducted at the Susquehanna Steam Electric Station in February, 2012 ML12066A0642012-03-0707 March 2012 Notice of Public Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of Safety Performance at the Susquehanna Steam Electric Station for 2011 ML1200500362012-01-0909 January 2012 Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1134801002011-12-19019 December 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1111203132011-04-22022 April 2011 Notice of Public Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of Safety Performance at the Susquehanna Steam Electric Station for 2010 ML1109101082011-04-0101 April 2011 Annual Assessment Meeting Notice-REVISED-LOCATION Change ML1105509182011-02-25025 February 2011 Notice of Meeting with Exelon Generation Company, LLC, to Discuss Three Mile Island, Unit 1, Main Steam Safety Valve License Amendment Request ML1105407242011-02-23023 February 2011 2/23/11 Ltr to F. Schiffley Re Participation in Commission Meeting on 50.46a Risk-informed Emergency Core Cooling System Rule on 3/24/11 ML1031902892010-11-22022 November 2010 Summary of October 19, 2010 NRC Petition Board Meeting for 2.206 Petition Regarding TMI-2 Decommissioning Funding Financial Assurance 2024-02-09 Category:Meeting Notice MONTHYEARPMNS20240138, Energysolutions Presentation to NRC on Decommissioning Activities at Three Mile Island Station, Unit 2 (TMI-2)2024-02-0909 February 2024
[Table view]Energysolutions Presentation to NRC on Decommissioning Activities at Three Mile Island Station, Unit 2 (TMI-2) PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-29029 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230921, Presubmittal Meeting on Proposed Alternative for Susquehanna Steam Electric Station, Unit 22023-08-0909 August 2023 Presubmittal Meeting on Proposed Alternative for Susquehanna Steam Electric Station, Unit 2 ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20230288, Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules2023-04-0505 April 2023 Public Pre-Application Meeting for Peach Bottom Atomic Power Station Planned Exemption Request from Part 26 Work-Hour Rules PMNS20230054, Test Meeting PMNS-1702023-01-13013 January 2023 Test Meeting PMNS-170 PMNS20230018, Planned Emergency License Amendment Request Regarding Control Rod Technical Specifications2023-01-0909 January 2023 Planned Emergency License Amendment Request Regarding Control Rod Technical Specifications ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20210002, Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station2021-01-0505 January 2021 Pre-Application Meeting for TSTF-505 Application for Susquehanna Steam Electric Station PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20168A2782020-06-16016 June 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) Corrected Registration Link ML20139A1532020-05-18018 May 2020 Notice of Category 3 Public Meeting - Joint Annual Assessment Meeting for Pa/Md Power Plants (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, and Susquehanna) ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19136A0962019-05-15015 May 2019 Notice of Category 3 Public Meeting (Webinar) - Joint Annual Assessment Meeting for Beaver Valley, Limerick, Peach Bottom, Susquehanna, and Three Mile Island ML19109A0362019-04-23023 April 2019 License Amendment Request to Revise Technical Specifications for a Temporary One-Time Extension of Completion Time ML18100A2112018-04-26026 April 2018 Notice of Public Meeting May 24, 2018 ML18102A0292018-04-23023 April 2018 Notice of Meeting with Susquehanna Nuclear, LLC, to Discuss Nrc'S Assessment of Safety Performance at Susquehanna Steam Electric Station for 2017, as Described in the Annual Assessment Letter Dated February 28, 2018 ML18100A0262018-04-10010 April 2018 Revised: Three Mile Island, Notice of Public Meeting - April 17, 2018 ML18093B1022018-04-0303 April 2018 Notice of Public Meeting with Exelon Generation Company, LLC, to Discuss the NRCs Assessment of Safety Performance at Three Mile Island Nuclear Station, Unit 1 for 2017, as Described in the Annual Assessment Letter Dated February 28, 2018 ML17090A1282017-04-0505 April 2017 Notice of Public Meeting with Exelon Generation Company, LLC to Discuss Nrc'S Assessment of Safety Performance at Peach Bottom Atomic Power Station for 2016 ML17090A1332017-04-0505 April 2017 Notice of Meeting with Susquehanna Nuclear, LLC to Discuss the Nrc'S Assessment of Safety Performance at Susquehanna Steam Electric Station for 2016 ML17079A1642017-03-23023 March 2017 Notice of Three Mile Island, Unit 1 Public Meeting to Discuss the NRCs Assessment of Safety Performance at Three Mile Island Nuclear Station, Unit 1 for 2016, as Described in the Annual Assessment Letter Dated March 1, 2017 ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16081A3492016-03-21021 March 2016 Notice of Annual Assessment Meeting - Peach Bottom Atomic Power Station, Units 2 & 3, on April 6, 2016 ML16081A3662016-03-21021 March 2016 Notice of Annual Assessment Meeting - Susquehanna Steam Electric Station, Units 1 & 2, on April 27, 2016 ML16068A0052016-03-0808 March 2016 Notice of Annual Assessment Meeting on March 23, 2016 ML15140A6262015-06-0101 June 2015 Notice of Public Annual Assessment Meeting - Susquehanna Steam Electric Station, Units 1 and 2, on June 11, 2015 ML15082A1282015-03-23023 March 2015 Notice of Annual Assessment Meeting and Open House on April 7, 2015 - Three Mile Island Nuclear Station Unit 1 ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML15070A5272015-03-11011 March 2015 April 16, 2015 Notice of Public Meeting on Peach Bottom Atomic Power Station, Units 2 & 3, with Exelon Generation Company, LLC ML14232A3452014-08-20020 August 2014 Notice of Public Meeting with PPL, Susquehanna Steam Electric Station, Unit 2, to Discuss Results of Nrc'S Supplemental Inspection Procedure 95002 ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14092A0362014-04-0202 April 2014 2014 Three Mile Island Annual Assessment Meeting on April 17, 2014 ML14072A2512014-03-13013 March 2014 April 09, 2014, Notice of Category 1 Public Meeting with PPL Susquehanna to Discuss to Discuss Annual Assessment ML14071A5892014-03-12012 March 2014 Notice of Category 3 Meeting with Exelon to Discuss Peach Bottom Performance During Calendar Year 2013 ML14071A5322014-03-12012 March 2014 2014 Susquehanna Steam Electric Station Annual Assessment Meeting Notice, for April 9, 2014 ML14055A0042014-03-11011 March 2014 Meeting Notice with Exelon Generation Company, LLC (Exelon) Regarding Emergency Response Organization Annual Training ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13256A2982013-09-12012 September 2013 09/25/2013 Notice of Meeting with the U.S. Department of Energy to Discuss the Three Mile Island Unit 2 License Renewal ML13221A4462013-08-12012 August 2013 Meeting Notice: to Discuss the Three Mile Island, Unit 2, Post-Shutdown Decommissioning Activities Report Submittal and Obtain Public Comments ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC 2024-02-09 Category:Memoranda MONTHYEARML23276A6522023-10-11011 October 2023
[Table view]Pre-submittal Meeting Summary, September 14, 2023 ML23102A0382023-04-10010 April 2023 Occupational Radiation Exposure Annual Report ML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch CLI-22-04, Change Letter to Peach Bottom Subsequent Renewed Licenses March 17 2022 Rev 12022-03-25025 March 2022 Change Letter to Peach Bottom Subsequent Renewed Licenses_March 17 2022_Rev 1 ML22073A2442022-03-16016 March 2022 TMI NMSS Memo for ISFSI PSP Review Completion, Staff Review of the Three Mile Island Independent Spent Fuel Storage Installation Physical Security Plan (Rev.0) and License Amendment Request (Cac/Epid No: 000078/05000289/L-2021-SPR-0004) ML22074A0922022-03-15015 March 2022 TMI: 1 ISFSI Only PSP Rev. 0 Notice of Safeguards Memo ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21309A5482021-11-15015 November 2021 NSIR Staff Review of the Wolf Creek Generating Stations Security Plan Training & Qualification Plan & Safeguards Contingency Plan for the Verification of ASM EA 20 091 Incorporation ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21243A4492021-09-0202 September 2021 ISFSI Technical Assistance Request - Review of Physical Security Plan ML21218A0082021-08-10010 August 2021 NSIR Review of the Three Mile Island Physical Security Plan Revision 24 for the Verification of ASM 20-103 Incorporation ML21166A1182021-06-15015 June 2021 Technical Assistance Request - Review of Physical Security Plan for the Three Mile Island Unit 1 Power Station Independent Spent Fuel Storage Installation ML21054A3032021-04-22022 April 2021 Memo to File: Final Ea/Fonsi of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Susquehanna ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19088A0462019-03-26026 March 2019 Submittal of 2018 Occupational Exposure Report (1O CFR 20.2206(b) ML19044A3842019-02-0606 February 2019 Notification of the Facility Director Change for the Nuclear Regulatory Commission Regulated Independent Spent Fuel Storage Installations (CLNl90659) ML18288A1942018-10-25025 October 2018 Summary of the Site Visit Related to the Review of the Subsequent License Renewal Application for the Peach Bottom Atomic Power Station Units 2 and 3 ML18151A1632018-06-0404 June 2018 Summary of Peach Bottom Annual Assessment Meeting and Attendee List ML18100A2112018-04-26026 April 2018 Notice of Public Meeting May 24, 2018 ML18093B1022018-04-0303 April 2018 Notice of Public Meeting with Exelon Generation Company, LLC, to Discuss the NRCs Assessment of Safety Performance at Three Mile Island Nuclear Station, Unit 1 for 2017, as Described in the Annual Assessment Letter Dated February 28, 2018 ML18044A1632018-02-20020 February 2018 01/18/2018 Summary of Pre-Application Meeting with Exelon Corporation Regarding the Peach Bottom, Units 2 and 3, Subsequent License Renewal Application ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17090A1332017-04-0505 April 2017 Notice of Meeting with Susquehanna Nuclear, LLC to Discuss the Nrc'S Assessment of Safety Performance at Susquehanna Steam Electric Station for 2016 ML17090A1282017-04-0505 April 2017 Notice of Public Meeting with Exelon Generation Company, LLC to Discuss Nrc'S Assessment of Safety Performance at Peach Bottom Atomic Power Station for 2016 ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16252A2732016-08-26026 August 2016 Notification of the Facility Director Change Update for the NRC Independent Spent Fuel Storage Installations (EM-NRC-16-020) ML16221A6802016-08-0808 August 2016 Draft Request for Additional Information ML16209A2042016-07-27027 July 2016 Draft Request for Additional Information ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16056A5632016-02-25025 February 2016 Draft Request for Additional Information ML15345A0912015-12-17017 December 2015 Closure of Issue Found During 2014 Regulatory Commitment Audit ML15313A2392015-11-0606 November 2015 Request for Additional Information Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval (TAC Nos. MF6302 Through MF6307) ML15253A5802015-09-0909 September 2015 Draft Request for Additional Information ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15223A5152015-08-10010 August 2015 Draft Request for Additional Information ML15175A3002015-08-0606 August 2015 Final Response to Task Interface Agreement 2015-01, Assessment of Three Mile Island Nuclear Station'S Use of a Non-Seismic Qualified Cleanup Path for the Borated Water Storage Tank ML15205A3562015-07-24024 July 2015 Draft Request for Additional Information ML15127A2472015-05-0606 May 2015 Draft Request for Additional Information ML15127A5182015-05-0505 May 2015 Draft Request for Additional Information (Tac No. MF4792) ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15110A0602015-04-17017 April 2015 Draft Request for Additional Information ML15098A0392015-04-0808 April 2015 Draft Request for Additional Information ML15093A3052015-04-0303 April 2015 Memorandum to the Participants NRC Staff Notification of Proposed Issuance of Order and Conforming License Amendments Approving Indirect Transfer ML15078A0832015-03-19019 March 2015 Draft Request for Additional Information (TAC Nos. MF5172 and MF5173) ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML15056A0462015-02-24024 February 2015 Draft Request for Additional Information 2023-04-10 |
Text
MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 rV:{
W-'1 40.
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING CLOSED MEETING TO DISCUSS DAM FAILURE ANALYSIS FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 DATE AND TIME: Thursday, April 24, 2014 8:00a.m.- 5:00p.m. EST LOCATION: U.S. Army Corps of Engineers, Baltimore District Headquarters 10 South Howard Street Baltimore, MD 21201 PURPOSE: The purpose of this meeting is to discuss the analysis of dams near the Peach Bottom Atomic Power Station, Units, 2 and 3, Susquehanna Steam Electric Station, Units 1 and 2, and Three Mile Island Nuclear Station, Unit 1 and the dam's potential impact on site flooding. Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO).
PARTICIPANTS: See Enclosure 2.
MEETING CONTACT: Robert F. Kuntz, NRR/JLD 301-415-3733 Robert. Kuntz@nrc.gov Docket Nos. 50-277, 50-278, 50-387, 50-388, and 50-289
Enclosures:
- 1. Agenda
- 2. List of Participants
CLOSED MEETING AGENDA FORTHCOMING CLOSED MEETING TO DISCUSS DAM FAILURE ANALYSIS FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; SUSQUEHANNA STEAM ELECTRIC STATION UNITS, 1 AND 2; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Thursday, April 24, 2014, 8:00a.m. to 5:00p.m.
U.S. Army Corps of Engineers, Baltimore District Headquarters 10 South Howard Street Baltimore, MD 21201 8:00a.m.: Introductions 8:30a.m.: Modeling Update 11:00 a.m.: Break 11:30 a.m.: NRC Licensee Questions 12:30 p.m.: Lunch 1:30 p.m.: Discussion between NRC Staff, US Army Corps of Engineers, and the Federal Energy Regulatory Commission*
5:00p.m.: Meeting Adjourned The time of the meeting is local to the jurisdiction where the meeting is being held.
- This portion of the meeting will be closed to the licensees.
Enclosure 1
LIST OF PARTICIPANTS U.S. Nuclear Regulatory Commission (NRC) Participants George Wilson, JLD Flooding Lead Chris Cook, Branch Chief, Hydrology Ken See, Senior Hydrologist Brad Harvey, Contract Officer Rep Hosung Ahn, Hydrologist Barbara Hayes, Hydrologist Steve Monarque, Project Manager Corps of Engineers. North Atlantic Division. Baltimore District Participants Harvey Johnson, Chief, Civil Works Branch Tom Rossbach, Chief Geotechnical Branch Jim Snyder, Dam Safety Program Manager Dan Risley, Senior H&H Engineer Julia Fritz, Chief Water Control Section Yohannes Asserafa, Chief Structural Engineering Ron Maj, Chief Engineering Division Corps of Engineers. Northwestern Division. Omaha District Participants Teresa Reinig, Program Manager Roger Kay, Chief, Hydraulics Section Doug Clementson, Hydrology Section Federal Energy Regulatory Commission Participants NickAgnoli Ken Fearson Dave Capka Exelon Generation Company, LLC Participants Chuck Behrend, SAMG Corporate David Distel, SAMG Licensing Jesse Lucas, Peach Bottom Site Engineering William McSorley, TMI Site Engineering Joseph Bellini Matt Lehrer Kevin Craft Jay Campbell Jerry Gomez PPL Susquehanna, LLC Participants John Emmett Rich Centenaro Enclosure 2
- ML14112A239 00 *via email OFFICE DORULPLI-2/PM DORULPLI-2/LA NRR/JLD/PMB/BC DORULPLI-2/BC DORULPLI-2/PM NAME JWhited ABaxter GWilson MKhanna JWhited DATE 04/22/2014 04/22/2014 04/22/2014 04/22/2014 04/22/2014