| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| author name = Taylor N H
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Diya F
| addressee name = Diya F
Line 9: Line 9:
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Taylor N H
| contact person = Taylor N
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| document type = Inspection Plan, Inspection Report, Letter
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000483/2016005]]
See also: [[see also::IR 05000483/2016005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 August 31, 2016 Mr. Fadi Diya, Senior Vice President  and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT (REPORT 05000483/2016005) Dear Mr. Diya: On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Callaway Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.     The NRC determined that overall, Callaway Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at  
{{#Wiki_filter:UNITED STATES
Callaway Plant during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which  
                              NUCLEAR REGULATORY COMMISSION
will be sent via separate, non-publicly available correspondence.   In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff  
                                                REGION IV
F. Diya - 2 - will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017.  This will be the final mid-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the
                                            1600 E LAMAR BLVD
NRC Public Document Room or from the Publicly Available Records (PARS) component of
                                        ARLINGTON, TX 76011-4511
NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1141 with any questions you have regarding this letter. Sincerely, /RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket No. 50-483 License No. NPF-30 Enclosure:  Callaway Plant Inspection/Activity Plan 
                                            August 31, 2016
Page 1 of 208/30/201609:32:44Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteCallawayInspection / Activity Plan07/01/2016-06/30/2018BASELINE-PLANT MODS11 IPAdverse Weather (Site/Imminent)7111101-Imminent01/01/201612/31/2016EB1-07T-CWY HEAT SINK PERFORMANCE11 IPHeat Sink Performance7111107T09/26/201609/30/2016RS 24-RADIATION SAFETY31 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/2016EP-1-EP PERFORMANCE INDICATORS11 IPDrill/Exercise Performance71151-EP0111/14/201611/18/20161 IPERO Readiness71151-EP0211/14/201611/18/20161 IPAlert & Notification System Reliability71151-EP0311/14/201611/18/2016EP-2-BIENNIAL EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140211/14/201611/18/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/20161 IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016ISFSI-ROUTINE INSPECTION (ONE WEEK IN MONTH)11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.102/01/201702/28/2017EXAM-INIT EXAM41 INITIAL EXAM CALLAWAY (09/2017)X0259108/14/201708/18/20171 INITIAL EXAM CALLAWAY (09/2017)X0259109/11/201709/15/2017RS 5678-RS TEAM51 IPRadiation Monitoring Instrumentation71124.0502/27/201703/03/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/27/201703/03/20171 IPRadiological Environmental Monitoring Program71124.0702/27/201703/03/20171 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/27/201703/03/2017EP-2-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140104/24/201704/28/20171 IPEmergency Action Level and Emergency Plan Changes711140404/24/201704/28/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11 IPDrill/Exercise Performance71151-EP0104/24/201704/28/20171 IPERO Readiness71151-EP0204/24/201704/28/20171 IPAlert & Notification System Reliability71151-EP0304/24/201704/28/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Mr. Fadi Diya, Senior Vice President
Page 2 of 208/30/201609:32:44Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteCallawayInspection / Activity Plan07/01/2016-06/30/2018BRQ-BIENNIAL REQUAL INSPECTION31 IPLicensed Operator Requalification Program7111111B06/12/201706/16/2017EB1-21M-CWY COMPONENT DESIGN BASES INSPECTION61 IPComponent Design Bases Inspection (Teams)7111121M07/31/201709/01/2017RS 12 PI-RADIATION SAFETY31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/20171 IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/20171 IPOccupational Exposure Control Effectiveness71151-OR0110/16/201710/20/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/16/201710/20/201771111.08-INSERVICE INSPECTION RFO2211 IPInservice Inspection Activities - PWR7111108P10/16/201710/27/2017EP-1-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140204/23/201804/27/20181 IPEmergency Preparedness Organization Staffing and Augmentation System711140304/23/201804/27/20181 IPEmergency Action Level and Emergency Plan Changes711140404/23/201804/27/20181 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140504/23/201804/27/20181 IPDrill/Exercise Performance71151-EP0104/23/201804/27/20181 IPERO Readiness71151-EP0204/23/201804/27/20181 IPAlert & Notification System Reliability71151-EP0304/23/201804/27/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
   and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:         MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
                (REPORT 05000483/2016005)
Dear Mr. Diya:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Callaway Plant. The NRC reviewed the most recent quarterly
performance indicators (PIs) in addition to inspection results and enforcement actions from
July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your
facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Callaway Plant operated in a manner that preserved public
health and safety and met all cornerstone objectives. The NRC determined the performance at
Callaway Plant during the most recent quarter was within the Licensee Response Column of the
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the
nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline
inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff


  ML16237A033  SUNSI Review By:  ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B  NAME DProulx AVegel TWPruett NTaylor  SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/  DATE 8/22/16 8/22/16 8/23/16 8/23/16   
F. Diya                                            -2-
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016        SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT  (REPORT 05000483/2016005)  DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) 
will confirm through inspections the full implementation of the orders mentioned above by
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)  DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov)  Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov 
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
                                                    Sincerely,
                                                    /RA/
                                                    Nicholas H. Taylor, Chief
                                                    Projects Branch B
                                                    Division of Reactor Projects
Docket No. 50-483
License No. NPF-30
Enclosure:
Callaway Plant Inspection/Activity Plan


            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                        CWY
Page 1 of 2                                                                                      Callaway
08/30/2016    09:32:44                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                        No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                      on Site
                                        BASELINE      - PLANT MODS                                                                                                          1
1          01/01/2016      12/31/2016    IP 7111101-Imminent      Adverse Weather (Site/Imminent)
                                        EB1-07T        - CWY HEAT SINK PERFORMANCE                                                                                          1
1          09/26/2016      09/30/2016    IP 7111107T              Heat Sink Performance
                                        RS 24          - RADIATION SAFETY                                                                                                    3
1          11/07/2016      11/11/2016    IP 71124.02              Occupational ALARA Planning and Controls
1          11/07/2016      11/11/2016    IP 71124.04              Occupational Dose Assessment
                                        EP-1          - EP PERFORMANCE INDICATORS                                                                                          1
1          11/14/2016      11/18/2016    IP 71151-EP01            Drill/Exercise Performance
1          11/14/2016      11/18/2016    IP 71151-EP02            ERO Readiness
1          11/14/2016      11/18/2016    IP 71151-EP03            Alert & Notification System Reliability
                                        EP-2          - BIENNIAL EP PROGRAM INSPECTION                                                                                      1
1          11/14/2016      11/18/2016    IP 7111402              Alert and Notification System Testing
1          11/14/2016      11/18/2016    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          11/14/2016      11/18/2016    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          11/14/2016      11/18/2016    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        ISFSI          - ROUTINE INSPECTION (ONE WEEK IN MONTH)                                                                              1
1          02/01/2017      02/28/2017    IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                        EXAM          - INIT EXAM                                                                                                          4
1          08/14/2017      08/18/2017        X02591                INITIAL EXAM CALLAWAY (09/2017)
1          09/11/2017      09/15/2017        X02591                INITIAL EXAM CALLAWAY (09/2017)
                                        RS 5678        - RS TEAM                                                                                                            5
1          02/27/2017      03/03/2017    IP 71124.05              Radiation Monitoring Instrumentation
1          02/27/2017      03/03/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
1          02/27/2017      03/03/2017    IP 71124.07              Radiological Environmental Monitoring Program
1          02/27/2017      03/03/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                                    4
1          04/24/2017      04/28/2017    IP 7111401              Exercise Evaluation
1          04/24/2017      04/28/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3          - EP PERFORMANCE INDICATOR VERIFICATION                                                                              1
1          04/24/2017      04/28/2017    IP 71151-EP01            Drill/Exercise Performance
1          04/24/2017      04/28/2017    IP 71151-EP02            ERO Readiness
1          04/24/2017      04/28/2017    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                                              Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information    CWY
Page 2 of 2                                                                                      Callaway
08/30/2016    09:32:44                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                  No. of Staff
Number          Start        End        Inspection Activity                                                                Title                on Site
                                        BRQ            - BIENNIAL REQUAL INSPECTION                                                                    3
1          06/12/2017      06/16/2017    IP 7111111B              Licensed Operator Requalification Program
                                        EB1-21M        - CWY COMPONENT DESIGN BASES INSPECTION                                                          6
1          07/31/2017      09/01/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                        RS 12 PI      - RADIATION SAFETY                                                                              3
1          10/16/2017      10/20/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          10/16/2017      10/20/2017    IP 71124.02              Occupational ALARA Planning and Controls
1          10/16/2017      10/20/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          10/16/2017      10/20/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        71111.08      - INSERVICE INSPECTION RFO22                                                                    1
1          10/16/2017      10/27/2017    IP 7111108P              Inservice Inspection Activities - PWR
                                        EP-1          - EP PROGRAM INSPECTION                                                                          1
1          04/23/2018      04/27/2018    IP 7111402              Alert and Notification System Testing
1          04/23/2018      04/27/2018    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          04/23/2018      04/27/2018    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          04/23/2018      04/27/2018    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
1          04/23/2018      04/27/2018    IP 71151-EP01            Drill/Exercise Performance
1          04/23/2018      04/27/2018    IP 71151-EP02            ERO Readiness
1          04/23/2018      04/27/2018    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
ML16237A033
  SUNSI Review            ADAMS                  Publicly Available      Non-Sensitive Keyword:
  By:                        Yes  No            Non-Publicly Available  Sensitive      NRC-002
  OFFICE: RIV  SPE:DRP/B    D: DRS                D: DRP        C: DRP/B
  NAME          DProulx      AVegel                TWPruett      NTaylor
  SIGNATURE    /RA/        /RA Jeff Clark for/  /RA/          /RA/
  DATE          8/22/16      8/22/16              8/23/16      8/23/16
                                       
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016
SUBJECT:        MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
                (REPORT 05000483/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 15:50, 30 October 2019

Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
ML16237A033
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Union Electric Co
Taylor N
References
IR 2016005
Download: ML16237A033 (6)


See also: IR 05000483/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

Dear Mr. Diya:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Callaway Plant. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Callaway Plant operated in a manner that preserved public

health and safety and met all cornerstone objectives. The NRC determined the performance at

Callaway Plant during the most recent quarter was within the Licensee Response Column of the

NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very

low (i.e., Green) safety significance, and all PIs indicated that your performance was within the

nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline

inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

F. Diya -2-

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects

Docket No. 50-483

License No. NPF-30

Enclosure:

Callaway Plant Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY

Page 1 of 2 Callaway

08/30/2016 09:32:44 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

BASELINE - PLANT MODS 1

1 01/01/2016 12/31/2016 IP 7111101-Imminent Adverse Weather (Site/Imminent)

EB1-07T - CWY HEAT SINK PERFORMANCE 1

1 09/26/2016 09/30/2016 IP 7111107T Heat Sink Performance

RS 24 - RADIATION SAFETY 3

1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment

EP-1 - EP PERFORMANCE INDICATORS 1

1 11/14/2016 11/18/2016 IP 71151-EP01 Drill/Exercise Performance

1 11/14/2016 11/18/2016 IP 71151-EP02 ERO Readiness

1 11/14/2016 11/18/2016 IP 71151-EP03 Alert & Notification System Reliability

EP-2 - BIENNIAL EP PROGRAM INSPECTION 1

1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing

1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

ISFSI - ROUTINE INSPECTION (ONE WEEK IN MONTH) 1

1 02/01/2017 02/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

EXAM - INIT EXAM 4

1 08/14/2017 08/18/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)

1 09/11/2017 09/15/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)

RS 5678 - RS TEAM 5

1 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation

1 02/27/2017 03/03/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

1 02/27/2017 03/03/2017 IP 71124.07 Radiological Environmental Monitoring Program

1 02/27/2017 03/03/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation

1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 04/24/2017 04/28/2017 IP 71151-EP01 Drill/Exercise Performance

1 04/24/2017 04/28/2017 IP 71151-EP02 ERO Readiness

1 04/24/2017 04/28/2017 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY

Page 2 of 2 Callaway

08/30/2016 09:32:44 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

BRQ - BIENNIAL REQUAL INSPECTION 3

1 06/12/2017 06/16/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - CWY COMPONENT DESIGN BASES INSPECTION 6

1 07/31/2017 09/01/2017 IP 7111121M Component Design Bases Inspection (Teams)

RS 12 PI - RADIATION SAFETY 3

1 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls

1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

71111.08 - INSERVICE INSPECTION RFO22 1

1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR

EP-1 - EP PROGRAM INSPECTION 1

1 04/23/2018 04/27/2018 IP 7111402 Alert and Notification System Testing

1 04/23/2018 04/27/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 04/23/2018 04/27/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 04/23/2018 04/27/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

1 04/23/2018 04/27/2018 IP 71151-EP01 Drill/Exercise Performance

1 04/23/2018 04/27/2018 IP 71151-EP02 ERO Readiness

1 04/23/2018 04/27/2018 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A033

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: Yes No Non-Publicly Available Sensitive NRC-002

OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B

NAME DProulx AVegel TWPruett NTaylor

SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/

DATE 8/22/16 8/22/16 8/23/16 8/23/16

Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov