| title = Forwards 740301 News Release Re Brief Shutdown Due to Electrical Disturbance Initiated by Generator Voltage Control Problem.Disturbance Not nuclear-related
| title = Forwards 740301 News Release Re Brief Shutdown Due to Electrical Disturbance Initiated by Generator Voltage Control Problem.Disturbance Not nuclear-related
| author name = SCHMIDT A D
| author name = Schmidt A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = HARDIN A K
| addressee name = Hardin A
| addressee affiliation = US ATOMIC ENERGY COMMISSION (AEC)
| addressee affiliation = US ATOMIC ENERGY COMMISSION (AEC)
| docket = 05000250, 05000251
| docket = 05000250, 05000251
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Reference 3~*p~~,~g y~whee, AOeOA S~~~'C.qygl pe<~lOSsOA K7AII a~l~Nakh 1, 1974 Mr.A.K.Hazdin, Reactor Inspector Facilities Operat bns Branch U.S.Ataaic Energy Coeaission Suite 818 230 Peachtree Street, N.M.Atlanta, Georgia 30303  
{{#Wiki_filter:Reference   3
                                                                                  ~
* p
                                                                          ~ ~, ~g y~ whee, AOeOA S~
                      'C.
                                                                                            ~
              ~    ~
                                                                      ~ lOSsOA K7AIIa ~l qygl          pe<                                                      Nakh 1,     1974 Mr. A. K. Hazdin, Reactor Inspector Facilities Operat bns Branch U.S. Ataaic Energy Coeaission Suite   818 230 Peachtree     Street, N. M.
Atlanta, Georgia 30303


==Dear Mr.Hardin:==
==Dear Mr. Hardin:==
xs a copy of the news release issued on the incident involving the'Iurkey Point Plant uni riday, hhrch 1, 1974.Pleaser le ma if&ere is any additional infoxmation you need.~~Very truly yours, A.D.Schaidt Director of Power Resources r ADS:pa@bcc: Messrs./~H.J.Dager H.F Yaeger


Vlor~I'<~r r t I.ight Gorn~oy Corporate Comnwnicstloas Department I'.Itos 01 3100/Mis ml, F I o r I de 33101 Phooei 305/44%64!1-Est 218g i@arch 1~1974 FOR IhCMEDIATE REI EASE Florida Power 4c Light's two nuclear units at Turkey Point were re-turned to service during the middle of the aCternoon today following a brief shutdown due to an electrical disturbance initiated by a generator voltage control'problem.Jllthough the two nuclear units were off the line for several hours, the disturbance itself was not nuclear-related and could have occurred at any, one of FPL's conventional oil-fired units.FoQowing the initial disturbance at about 3 a.m.~the FPL system began automatically shedding some of its load Crom South Dade to the northern end of the system'With the exception of a few isolated areas.bower, most power was restored wQhtn ten~s and power to all asoae was rastored by 2 a aa.FPL'e two aecteer watts eepply ehoet 8 per~ef the total geo~eectews cayelbChog See she~poor e ewe eeal~heL eaQLsee c~~te W lS eeeemteo Cheengi~FSee~}}
xs a copy  of the news release issued on  the incident involving the 'Iurkey Point Plant uni            riday, hhrch 1, 1974.
Pleaser  le    ma        if &ere is any additional
                                                    ~ ~
infoxmation you need.
Very  truly yours, A. D. Schaidt Director of    Power Resources
                                  /~
r ADS:pa@
bcc:    Messrs.
H. J. Dager H. F Yaeger
 
Vlor~ I'<~r r t I.ight Gorn~oy I'.
Corporate Comnwnicstloas Department Itos 01 3100/Mis ml, F I o r I de 33101 Phooei 305/44% 64!1-Est 218g i@arch   1~ 1974 FOR IhCMEDIATE REI EASE Florida Power     4c Light's two nuclear units at Turkey Point were re-turned to service during the middle of the aCternoon today following a brief shutdown     due to an electrical disturbance initiated by a generator voltage control 'problem.
Jllthough the two nuclear units were off the line for several hours, the disturbance     itself was not nuclear-related     and could have occurred at any, one of FPL's conventional       oil-fired units.
FoQowing the initial disturbance at about       3 a.m.   ~ the FPL system began automatically shedding some of its load Crom South Dade to the northern end of the system       'With the exception of a few isolated areas.
bower,       most power was restored wQhtn ten         ~s         and power to all asoae was rastored by 2 a aa.
FPL'e two aecteer watts eepply ehoet       8 per   ~       ef the total geo
~ eectews cayelbChog   See she ~poor     e ewe eeal ~ heL   eaQLsee   c~~te W lS eeeemteo Cheengi~         FSee~}}

Latest revision as of 10:24, 22 October 2019

Forwards 740301 News Release Re Brief Shutdown Due to Electrical Disturbance Initiated by Generator Voltage Control Problem.Disturbance Not nuclear-related
ML17339A563
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/01/1974
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: Hardin A
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML17207A819 List:
References
NUDOCS 8002150472
Download: ML17339A563 (4)


Text

Reference 3

~

  • p

~ ~, ~g y~ whee, AOeOA S~

'C.

~

~ ~

~ lOSsOA K7AIIa ~l qygl pe< Nakh 1, 1974 Mr. A. K. Hazdin, Reactor Inspector Facilities Operat bns Branch U.S. Ataaic Energy Coeaission Suite 818 230 Peachtree Street, N. M.

Atlanta, Georgia 30303

Dear Mr. Hardin:

xs a copy of the news release issued on the incident involving the 'Iurkey Point Plant uni riday, hhrch 1, 1974.

Pleaser le ma if &ere is any additional

~ ~

infoxmation you need.

Very truly yours, A. D. Schaidt Director of Power Resources

/~

r ADS:pa@

bcc: Messrs.

H. J. Dager H. F Yaeger

Vlor~ I'<~r r t I.ight Gorn~oy I'.

Corporate Comnwnicstloas Department Itos 01 3100/Mis ml, F I o r I de 33101 Phooei 305/44% 64!1-Est 218g i@arch 1~ 1974 FOR IhCMEDIATE REI EASE Florida Power 4c Light's two nuclear units at Turkey Point were re-turned to service during the middle of the aCternoon today following a brief shutdown due to an electrical disturbance initiated by a generator voltage control 'problem.

Jllthough the two nuclear units were off the line for several hours, the disturbance itself was not nuclear-related and could have occurred at any, one of FPL's conventional oil-fired units.

FoQowing the initial disturbance at about 3 a.m. ~ the FPL system began automatically shedding some of its load Crom South Dade to the northern end of the system 'With the exception of a few isolated areas.

bower, most power was restored wQhtn ten ~s and power to all asoae was rastored by 2 a aa.

FPL'e two aecteer watts eepply ehoet 8 per ~ ef the total geo

~ eectews cayelbChog See she ~poor e ewe eeal ~ heL eaQLsee c~~te W lS eeeemteo Cheengi~ FSee~