Forwards Response to NRC 791001 & 17 Requests for Info Re Loss of Offsite Power Events.Description of Significant sys-wide Improvements & Info Re Major Offsite Events Encl
Date released: 07/31/2018 Download: ML17207A819


Sys Control Ctr Functions.
ML17339A577
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/29/1980
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17339A577 (42)
Forwards Rept on Sys Disturbance 770516.
ML17339A576
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/20/1977
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: STELLO V
Office of Nuclear Reactor Regulation
References
Download: ML17339A576 (1)
Sys Disturbance,Loss of Generation at Facility,790404.
ML17339A575
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/08/1979
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17339A575 (33)
Forwards LER 78-017/03L-0
ML17339A574
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/13/1978
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A574 (6)
Forwards Response to NRC 780607 Request for Proposed Methods & Procedures to Implement NRC Positions Re Sys Operations. Util 790522 Ltr to DOE Encl
ML17339A572
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/05/1978
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: REID R W
Office of Nuclear Reactor Regulation
References
Download: ML17339A572 (6)
Ro:On 740425,generators Tripped When Circuit Breaker Protection Sys Relays Energized During Functional Testing. Caused by Actuation of Generator Backup Relays.Addl Isolation Switches Installed in Protective Sys
ML17339A569
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/31/1974
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17339A569 (8)
LER 78-017/03L-0:on 780514,improper Switching at Pratt & Whitney Substation & Incorrect Wiring of Protective Relays at Midway Substation Led to de-energization.Offsite Power Lost.Incorrect Wiring Corrected
ML17339A567
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/13/1978
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A567 (2)
Ro:On 740301,output Voltage Began to Oscillate.Operator Attempted to Stabilize Voltage by Controlling Generator Voltage Manually.Caused by Lowering Machine Voltage During Min Load Periods
ML17339A565
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/25/1974
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17339A565 (5)
Forwards Response to NRC 791001 & 17 Requests for Info Re Loss of Offsite Power Events.Description of Significant sys-wide Improvements & Info Re Major Offsite Events Encl
ML17207A818
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/11/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References