Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17348A566 | 14 September 1990 | Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. | |
ML17348A546 | 7 September 1990 | Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. | VT-2 |
ML17348A550 | 7 September 1990 | Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities | Boric Acid Ultimate heat sink Stroke time |
ML17348A552 | 6 September 1990 | Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs | |
ML17348A543 | 31 August 1990 | Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA | |
ML17348A536 | 27 August 1990 | Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. | Process Control Program |
ML17348A517 | 24 August 1990 | Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request | Safe Shutdown Post Accident Monitoring |
ML17348A504 | 17 August 1990 | Forwards fitness-for-duty Program Performance Data for Jan-June 1990 | Fitness for Duty |
ML17348A505 | 15 August 1990 | Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 | |
ML20059B011 | 14 August 1990 | Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 | |
ML17348A497 | 10 August 1990 | Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed | |
ML17348A470 | 27 July 1990 | Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing | Fitness for Duty |
L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) | 25 July 1990 | Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) | |
ML17348A428 | 25 July 1990 | Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) | |
ML17348A469 | 23 July 1990 | Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request | Safe Shutdown Commercial Grade Dedication |
ML17348A419 | 20 July 1990 | Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 | |
ML17348A420 | 20 July 1990 | Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr | |
ML17348A414 | 20 July 1990 | Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel | |
ML17348A417 | 19 July 1990 | Forwards May 1990 Integrated Schedule Regulatory Rept for Plant | Ultimate heat sink Stroke time |
ML17348A412 | 18 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. | |
ML17348A425 | 17 July 1990 | Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition | |
IR 05000250/1990013 | 16 July 1990 | Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated | |
ML20055G864 | 16 July 1990 | Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc | |
ML17348A416 | 16 July 1990 | Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units | |
ML17348A415 | 16 July 1990 | Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated | |
ML17348A404 | 12 July 1990 | Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project | |
ML17348A392 | 12 July 1990 | Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs | Fitness for Duty Stroke time Commercial Grade Dedication Coatings Job Performance Measure Systematic Assessment of Licensee Performance Generic Fundamentals Examination Stolen |
L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld | 11 July 1990 | Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld | |
L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) | 11 July 1990 | Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) | |
ML17348A432 | 11 July 1990 | Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 | |
ML17348A394 | 9 July 1990 | Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown | Safe Shutdown Boric Acid Fire Barrier Fire Protection Program |
ML17348A388 | 5 July 1990 | Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs | |
ML17348A431 | 5 July 1990 | Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons | |
ML17348A385 | 3 July 1990 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training | |
ML17348A371 | 3 July 1990 | Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement Project | Safe Shutdown Earthquake |
ML17348A367 | 3 July 1990 | Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001 | |
ML17348A384 | 29 June 1990 | Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl | |
ML17348A360 | 29 June 1990 | Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program | |
ML17348A362 | 28 June 1990 | Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731 | |
ML17348A365 | 28 June 1990 | Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements | |
ML17348A359 | 27 June 1990 | Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed | |
ML17348A364 | 27 June 1990 | Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. | |
ML17348A386 | 27 June 1990 | Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 | |
ML17348A355 | 21 June 1990 | Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers | |
ML20055D920 | 20 June 1990 | Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl | |
ML17348A318 | 19 June 1990 | Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008 | Nondestructive Examination |
ML17348A298 | 12 June 1990 | Forwards Rev 16 to Topical QA Rept. | |
ML17348A287 | 8 June 1990 | Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement Performed | Anchor Darling |
ML17348A286 | 8 June 1990 | Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request | |
ML17348A278 | 4 June 1990 | Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info |