ACCELERATED DISTBXBUTION DEMONSTPA,TION SYSTEM REGULATO INFORMATION DISTRIBUTION+STEM (RIDE)
,I
~ACCESSION NBR:9006210326 DOC.DATE: 90/06/12 NOTARIZED:
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and ight C
05000251 AUTH.NAME AUTHOR AFFILIATION
~p
/ (g+
GEIGER,J.E.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 16 to "Topical QA Rept."
DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: QA Topical Report, Amendment, or Correspondence (Docket/Utilxt NOTES:
eci RECIPIENT ID CODE/NAME PD2-2 LA INTERNAL:
R PQ/LPEB10 REG F
01 EXTERNAL: IHS NRC PDR COPIES LTTR ENCL 1
1 2
2 2
2 1
1 1
1 RECIPIENT ID CODE/NAME EDISON,G OC/LFMB RGN2 FILE LPDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
r C
P.O. Box1400u uno Beach FL 33408-0420 JUgg 1 2 1990 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 L-90-204 10 CFR 50.54(a)
Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3),
please find attached the annual update of the Florida Power 6 Light Company Topical Quality Assurance Report (Revision 16 dated June 12, 1990).
The document is divided into three separate enclosures:
Enclosure I
Executive Summary Enclosure II Marked versions of the previous Topical Quality Assurance Report showing the changes that have been made.
Please see the introductory paragraph of the Executive Summary for the explanation of why TQR 1.0, Organization, and the organization charts shown in Appendix A are not marked.
Enclosure III The version of the TQAR to be issued within FPL on June 12, 1990.
All changes have been reviewed by Quality Assurance and it is concluded that these changes do not reduce the commitments made in our program which has been previously accepted by the NRC.
Should there are any questions, please contact us.
y truly yours, E. Gei er Vice President Nuclear Assurance JEG/wFK/gp
(
gpppzrpzzp gpppiz PDR ADOCig 05000250 Enclosure r
p o04 cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company
AC( 'ULNA.'LDU USA'KLlsU'I'LUjN MULVLULNSLKA'lAUDI 5 X5 l&lVI REGULATOR INFORMATION DISTRIBUTIONSTEM (RIDE)
ACCESSION NBR:9006210326 DOC.DATE: 90/06/12 NOTARIZED:
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3,'lorida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION GEIGERFJ.E.
Florida Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Co trol Desk)
SUBJECT:
Forwards Rev 16 to "Topical QA Rept."
DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: QA Topical Report, Amendment, or Correspondence (Docket/Utxlit NOTES:
eci
.RECIPIENT ID CODE/NAME PD2-2 LA INTERNAL: NRR/DLPQ/LPEB10 EG PI-5 01 EXTERNAL: IHS NRC PDR COPIES LTTR ENCL 1
1 2
2 2
2 1
1 1
1 RECIPIENT ID CODE/NAME EDISONFG OC/LFMB RGN2 FILE LPDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENIS:
PLEASE WLP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXI'. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
P.O. Box1400, uno Beach, FL 33408-0420 JU~
1 2 1990 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 L-90-204 10 CFR 50.54(a)
Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3),
please find attached the annual update of the Florida Power
& Light Company Topical Quality Assurance Report (Revision 16 dated June 12, 1990).
The document is divided into three separate enclosures:
Enclosure I -
Executive Summary Enclosure II Marked versions of the previous Topical Quality Assurance Report showing the changes that have been made.
Please see the introductory paragraph of the Executive Summary for the explanation of why TQR 1.0, Organization, and the organization charts shown in Appendix A are not marked.
Enclosure III The version of the TQAR to be issued within FPL on June 12, 1990.
All changes have been reviewed by Quality Assurance and it is concluded that these changes do not reduce the commitments made in our program which has been previously accepted by the NRC.
Should there are any questions, please contact us.
truly yours, E. Gei er Vice President Nuclear Assurance JEG/WFK/gp q00$ 2f032+ p006f2 PDR ADOCN, 05000250 Enclosure P
,ot; cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company