ML17340A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17340A130
| number = ML17340A130
| issue date = 12/22/2017
| issue date = 12/22/2017
| title = Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson (EPID L-2017-LRM-0050)
| title = Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson
| author name = Galvin D J
| author name = Galvin D
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000261, 05000324, 05000325, 05000400
| docket = 05000261, 05000324, 05000325, 05000400
| license number = DPR-023, DPR-062, DPR-071, NPF-063
| license number = DPR-023, DPR-062, DPR-071, NPF-063
| contact person = Galvin D J, NRR/DORL/LPL1
| contact person = Galvin D, NRR/DORL/LPL1
| case reference number = EPID L-2017-LRM-0050
| case reference number = EPID L-2017-LRM-0050
| document type = Meeting Summary
| document type = Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE:        Duke Energy Progress, LLC FACILITY:        Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2
FACILITY:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 Duke Energy Progress, LLC Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2  


==SUBJECT:==
==SUBJECT:==


SUMMARY OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)
==SUMMARY==
On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)
The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17319A257.
On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR)
A list of attendees is enclosed.
Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17319A257. A list of attendees is enclosed.
The licensee presented informational slides at the meeting (ADAMS Accession No. ML 17331A627).
The licensee presented informational slides at the meeting (ADAMS Accession No. ML17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs.
During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures,  
The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed.
: Systems, and Components]
 
Categorization Guideline,"
Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received.
dated July 2005 (ADAMS Accession No. ML052910035);
and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs. The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective.
The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews.
The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed. Several members of the public called into the meeting but none offered comments.
No regulatory decisions or commitments were made at the meeting.
No public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.
Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.
Docket Nos. 50-261, 50-324, 50-325, and 50-400  
Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261, 50-324, 50-325, and 50-400


==Enclosure:==
==Enclosure:==
Line 46: Line 38:


==Enclosure:==
==Enclosure:==
Distribution via Listserv


Distribution via Listserv Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty
LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty
* D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman 0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull
* D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman
* participated by phone Enclosure  
: 0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull
* participated by phone Enclosure


==SUBJECT:==
==SUBJECT:==


SUMMARY OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)
==SUMMARY==
DATED DECEMBER 22, 2017 DISTRIBUTION:
OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION:
PUBLIC RidsNrrPMRobinson RidsNrrPMShearonHarris RidsNrrPMBrunswick RidsNrrDssSrxb RidsNrrDmlrMvib  
PUBLIC                           RidsRgn2MailCenter          RidsNrrLABClayton RidsNrrPMRobinson               RidsNrrDorlLpl2-2          TWertz, NRR RidsNrrPMShearonHarris           RidsACRS_MailCTR            JBowen, OEDO RidsNrrPMBrunswick               RidsNrrDraApla              OYee, NRR RidsNrrDssSrxb                   RidsNrrDeEeob              MBiro, NRR RidsNrrDmlrMvib                 SDinsmore, NRR              FForsaty, NRR BHartle, NRR                     EMiller, NRR               ARezai, NRR PSahay, NRR                     CSt. Peters, NRR           PM Reading File RidsNrrDssStsb                  SRuffin, NRR               RidsNrrDeEmib ADAMS Access1on No.: ML17254A349                          *b v e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM         NRR/DORL/LPL2-2/LA         NRR/DRA/APLA/BC*
: BHartle, NRR PSahay, NRR RidsNrrDssStsb RidsRgn2MailCenter RidsNrrDorlLpl2-2
NAME     DGalvin                 BClayton (LRonewicz for)   SRosenberg DATE     12/12/2017               12/12/2017                  12/14/2017 OFFICE NRR/DSS/STSB/BC(A)*         NRR/DORL/LPL2-2/BC         N RR/DORL/LPL2-2/PM NAME     JWhitman                 UShoop                     DGalvin DATE     11/30/2017               12/22/2017                 12/22/2017 OFFICIAL RECORD COPY}}
 
RidsACRS_MailCTR RidsNrrDraApla RidsNrrDeEeob SDinsmore, NRR EMiller, NRR CSt. Peters, NRR SRuffin, NRR ADAMS A ccess1on N ML 17254A349 o.: OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME DGalvin BClayton (LRonewicz for) DATE 12/12/2017 12/12/2017 OFFICE NRR/DSS/STSB/BC(A)*
NRR/DORL/LPL2-2/BC NAME JWhitman UShoop DATE 11/30/2017 12/22/2017 OFFICIAL RECORD COPY RidsNrrLABClayton TWertz, NRR JBowen, OEDO OYee, NRR MBiro, NRR FForsaty, NRR ARezai, NRR PM Reading File RidsNrrDeEmib
*b *1 v e-ma1 NRR/DRA/APLA/BC*
SRosenberg 12/14/2017 N RR/DORL/LPL2-2/PM DGalvin 12/22/2017}}

Latest revision as of 11:11, 22 October 2019

Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson
ML17340A130
Person / Time
Site: Harris, Brunswick, Robinson  Duke Energy icon.png
Issue date: 12/22/2017
From: Dennis Galvin
Plant Licensing Branch II
To:
Duke Energy Progress
Galvin D, NRR/DORL/LPL1
References
EPID L-2017-LRM-0050
Download: ML17340A130 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: Duke Energy Progress, LLC FACILITY: Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)

On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR)

Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17319A257. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs.

The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed.

Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received.

Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.

Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261, 50-324, 50-325, and 50-400

Enclosure:

List of Attendees cc w/

Enclosure:

Distribution via Listserv

LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty

  • D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman
0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull
  • participated by phone Enclosure

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION:

PUBLIC RidsRgn2MailCenter RidsNrrLABClayton RidsNrrPMRobinson RidsNrrDorlLpl2-2 TWertz, NRR RidsNrrPMShearonHarris RidsACRS_MailCTR JBowen, OEDO RidsNrrPMBrunswick RidsNrrDraApla OYee, NRR RidsNrrDssSrxb RidsNrrDeEeob MBiro, NRR RidsNrrDmlrMvib SDinsmore, NRR FForsaty, NRR BHartle, NRR EMiller, NRR ARezai, NRR PSahay, NRR CSt. Peters, NRR PM Reading File RidsNrrDssStsb SRuffin, NRR RidsNrrDeEmib ADAMS Access1on No.: ML17254A349 *b v e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DRA/APLA/BC*

NAME DGalvin BClayton (LRonewicz for) SRosenberg DATE 12/12/2017 12/12/2017 12/14/2017 OFFICE NRR/DSS/STSB/BC(A)* NRR/DORL/LPL2-2/BC N RR/DORL/LPL2-2/PM NAME JWhitman UShoop DGalvin DATE 11/30/2017 12/22/2017 12/22/2017 OFFICIAL RECORD COPY