Issue date | Title | Topic | |
---|---|---|---|
ML23129A001 | 26 June 2023 | May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High | |
ML23157A320 | 26 June 2023 | Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry | Hot Short High winds Probabilistic Risk Assessment Large early release frequency |
ML23151A123 | 31 May 2023 | Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant | |
ML23151A253 | 31 May 2023 | Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 | |
ML22262A288 | 3 October 2022 | Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 | |
ML22174A287 | 14 July 2022 | Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 | |
ML22166A018 | 7 July 2022 | Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force | |
ML22167A185 | 30 June 2022 | Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 | Coatings |
ML22131A380 | 12 May 2022 | Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 | Coronavirus |
ML22129A006 | 10 May 2022 | Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 | Surveillance Frequency Control Program Operational leakage |
ML22130A030 | 9 May 2022 | Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 | |
ML22091A269 | 19 April 2022 | Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 | Offsite Circuit |
ML21341A554 | 29 December 2021 | Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate | |
ML21172A267 | 13 August 2021 | Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis | |
ML21182A220 | 9 July 2021 | Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele | Coronavirus |
ML21131A147 | 11 May 2021 | Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 | Pandemic Coronavirus |
ML21057A117 | 1 April 2021 | February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time | High winds Probabilistic Risk Assessment FLEX |
ML21068A417 | 17 March 2021 | Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 | Coatings Moisture barrier Coronavirus |
ML21036A311 | 3 March 2021 | Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 | |
ML21028A676 | 24 February 2021 | Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant | |
ML20141L628 | 20 May 2020 | EOC Meeting Summary | Coronavirus COVID-19 |
ML20136A222 | 15 May 2020 | Har - Bru 2019 Aam Meeting Summary | Coronavirus COVID-19 |
ML19331A806 | 29 January 2020 | Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities | |
ML19329A023 | 27 November 2019 | Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections | |
ML19241A290 | 24 September 2019 | Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times | High winds Internal Flooding Probabilistic Risk Assessment |
ML19220A670 | 26 August 2019 | Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan | |
ML19113A065 | 14 May 2019 | Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit | |
ML19120A134 | 6 May 2019 | 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit | Tornado Missile Probabilistic Risk Assessment Tornado Missile Protection Tornado Missile Risk Evaluator |
ML19123A353 | 2 May 2019 | Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 | |
ML19123A352 | 2 May 2019 | Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 | |
ML19123A159 | 1 May 2019 | Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 | |
ML19087A062 | 11 April 2019 | Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request | Dissimilar Metal Weld |
ML18352A357 | 8 January 2019 | Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes | Siren |
ML18361A671 | 8 January 2019 | Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, | |
ML18355A814 | 7 January 2019 | Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS | Probabilistic Risk Assessment |
ML18094A263 | 17 August 2018 | Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology | Tornado Missile Probabilistic Risk Assessment Tornado Missile Risk Evaluator |
ML18144A063 | 24 May 2018 | Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 | |
ML18109A091 | 19 April 2018 | Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 | Open House |
ML18088A073 | 3 April 2018 | March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 | |
ML18064A133 | 19 March 2018 | Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 | |
ML17340A130 | 22 December 2017 | Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson | Probabilistic Risk Assessment |
ML17317A330 | 22 December 2017 | Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) | |
ML17340A061 | 8 December 2017 | 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. | Tornado Missile Tornado Missile Risk Evaluator |
ML17286A122 | 1 November 2017 | Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) | |
ML17244A074 | 28 September 2017 | 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 | Tornado Missile Probabilistic Risk Assessment Tornado Missile Protection Tornado Missile Risk Evaluator |
ML17257A099 | 26 September 2017 | Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 | Tornado Missile Large early release frequency Tornado Missile Risk Evaluator |
ML17254A349 | 19 September 2017 | Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 | Qualified Offsite Circuit |
ML17223A121 | 17 August 2017 | Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson | Shutdown Margin |
ML17145A314 | 25 May 2017 | EOC Meeting Summary | Open House |
ML17137A333 | 17 May 2017 | Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 | Open House |