ML18022A436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:REQULAT RY INFORMATION DIBTRIBUTIO
{{#Wiki_filter:REQULAT RY INFORMATION DIBTRIBUTIO SYSTEN  ~
~SYSTEN (RIDS)ACCESSION NBR: 8b100900" DOC.DATE: 8b/09/29 NO ARIZED: NO DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH.NAl'IE AUTHOR AFFILIATION DEANi J.M.North Carolina>State of REC IP.NANE RECIPIENT AFFILIATION DENTON>H.R.>Office of Nuclear Reactor Regulationi Director (post 851125  
(RIDS)
ACCESSION NBR: 8b100900"         DOC. DATE: 8b/09/29     NO   ARIZED: NO       DOCKET 0 FACIL: 50-400 Shearon     Harris Nuclear   Power   Planti Unit     ii Carolina   05000400 AUTH. NAl'IE         AUTHOR AFFILIATION DEANi J. M.         North Carolina> State of REC IP. NANE         RECIPIENT AFFILIATION DENTON> H. R. >     Office of Nuclear Reactor Regulationi Director (post           851125


==SUBJECT:==
==SUBJECT:==
Supports util request for schedular exemption from requirements of App Ei Section IV.F.1.of 10CFR50 re full participation exercise of emergency plan conducted (within 1 gr of full potuer license.DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL BI ZE: TITLE: Request for NRR Action (e.g.2.20b Petitions) 5 Related Correspondenc NOTES: Application for permit renewal filed.05000400 RECIPIENT ID CODE/NANE PWR-A PD2 LA BUCKLEY.8 01 INTERNAL: EDO/ACB COPIES" RECIPIENT LTTR ENCL ID CODE/MANE PAR-A PD2 PD ELD/HDS1 NRR DIR COPIES LTTR ENCL REC FIL EXTERNAL: LPDR NBIC 04 03 05 NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL  
Supports util request for schedular exemption from requirements of App Ei Section IV. F. 1. of 10CFR50 re full participation exercise of emergency plan conducted (within 1 gr of full potuer license.
*"!i q)'Tii k'',I""."'3i"i<j".,"7P,'6 0>';I'i'id)i>''ll;YH)ii'fc.)IJ".
DISTRIBUTION CODE: YE03D       COPIES RECEIVED: LTR         ENCL       BI ZE:
Ui')'<k")%>'>'"'x"-0"', o8 al<a(('i')'i'763<)~i'.6',~:i t"..-I"",'94lO I 7'.;>>,.ilUi'i
TITLE: Request     for NRR Action (e. g. 2. 20b Petitions) 5 Related Correspondenc NOTES: Application for permit renewal filed.                                       05000400
.!TCil I il'ti" i'" il I'.'iT)',)'ih Pci))ii'I",s WQ"-~f~'.'~'~iT K X 6'f~'))307TAI)K', lh)'N J),"<<X>Ill;39'7 K" 4($4)i'-" J QR)I OPEC"33 i: '.>77,)UIR']0.,i~);ei i iH.i,"".'C.
                                                "
3D,)'.'0<'(i,", jT'.~'>)i',')N.I)l i)A'i iAi~l)7 0'APi ,II"I,':iUI Yi36 ma'<I:to i.~qme>.!-'~
RECIPIENT          COPIES            RECIPIENT             COPIES ID CODE/NANE       LTTR ENCL        ID CODE/MANE          LTTR ENCL PWR-A PD2 LA                         PAR-A PD2 PD BUCKLEY. 8     01 INTERNAL: EDO/ACB                                 ELD/HDS1 NRR DIR REC   FIL       04 EXTERNAL: LPDR             03                   NRC PDR           02 NBIC            05 TOTAL NUMBER OF COPIES REQUIRED: LTTR           11   ENCL
'~s>ib<<Isa-~':;~ijpo.t Ei.-.;ii';I a'~qq'i'l 2 Lu I g,'3i.>)V)0):%u.'".d~nor.$.".'~>>',.3 qq.'s'>@'~4it'~ai i,iup as i'i" uu bg",~ii)~co~~.'kq iivv<~p~;>~a:-',.c,~i<,>.>i,.~o ii 4<quoit i~q ,~i 2~i:i i l.'~')>s}Q q (fit I%0 I>i",IGU<'cl~lk is9bfi062<<)'T a~ai))9 ii0 North Carolina Department of Crime Control and Public Safety James G.Martin, Governor Joseph W.Dean, Secretary September 29, 1986 Mr.Harold R.Denton, Director Office of Nuclear Reacter Regulation United States Nuclear Regulatory Commission Washington, D..C.


==Dear Mr.Denton:==
                                '',I""." '3i          "i <j"., "7P,'6        0>';I  'i'id)i> ''ll; YH)ii'fc.)IJ".
On March 4, 1986, Carolina Power 8 Light;Company (CP&L)requested a license to operate.the Shearon Harris Nuclear Power Plant.CP&L further requested that the U.S.Nuclear Regulatory Commission grant a schedular exemption from the requirements in l0 CFR Part 50, Appendix E, S IV.F.1.This regulation would require that a full-participation exercise of t;he Harris emergency plan"be conducted within l year before the issuance of the first operating license for full power and prior to operation above 5$of rated power." The Nort;h Car olina Department of Cr ime Contr ol and Public Safety supports CP&L s request for a schedular exemption.
Ui')  '<k")%  >'>'"            '
The Department s Division of Emergency Management (DEM)is the State agency with primary responsibility for the development and implementation of emergency plans in support of fixed nuclear facilities.
x "-0"',  o8      al  <a((        'i')'i                                .,i~);ei i iH.i,"".'C. 3D,)'.
The Division was involved in the initial decision to request an exemption and has planned its exercise schedule accordingly.
                          '763    < )  ~ i'.6',    ~:i t"..- I "  ",'94lO  I    7'.;>>,.ilUi'i .! TCil I il'ti "                          '0<' (i,", jT '.~'> )
The Division of Emergency Management has worked closely with CP&L,'he NRC, the Federal Emergency Management Agency, and the four affected counties to develop a comprehensive emergency plan for the Harris Plant.The Division has eondueted numerous emergency planning exercises for nuclear power plants since 1980 and has responded to many major non-nuclear emergencies (some of which have involved large-scale evacuations) in our 86100'it0022 860'V2V PDR ADOCK 05000400 F PDR r0~gP 512 N.Salisbury Street o P.O.Box 27687 o Raleigh, North Carolina 27611-7687 o (919)733-2126 An Equal Opportunity
i'" il I'.'iT )', )'ih Pci))ii'I",s                              i',')N .I) l i)A WQ    "-~f ~'.'~'~iT                X 6'f~')
/Affirmative Action Employer L P  
                                                                          )307TAI          )K    ',  lh K
>>>>)g>>g Mr.Harold R.Denton September 29, 1986 Page 2 State.In May 1985, the Division of Emergency Management and the other organizations involved conducted a very successful exercise of the Harris Plant emergency plan.Both the FEMA evaluation and the Division s own internal review confirmed an overall state of readiness for offsite planning and response.Since then, the Division has provided additional training and other assistance to local emergency workers in order to maintain that state of readiness.
                                                                                                            )'N J),"<<X    >  Ill              'i iAi~l    )7 0 'APi
A partial exercise with local participation is scheduled for October 28, 1986, and a full participation exercise of scheduled for February 1987.The Department of Crime Control and Public Safety, which represents the Governor in this matter, is confident that the level of emergency preparedness has been maintained and, indeed, enhanced since the May 1985 exercise.In view of these considerations, the Department of Crime Control and Public Safety does not believe that yet another full-participation exercise prior to operation of the Harris Plant is necessary in light of the previous exercise, the one scheduled for October of this year, and 0he full exercise scheduled for February, 1987.This Department will cooperate fully with any action you think best.With very best wishes, I am Sincerely, Joseph W.Dean JWD:ch J}}
          *"!i q) 'Tii k ;39'7  K" 4    ($ 4) i'  -" J QR) I        OPEC"33          i:  '.> 77,)UIR        ']0                                ,I I "I,':iUI Yi36 ma'<I:to                                                  -~      ':;~ijpo.t                          ';I a'~ qq'i'l 2 Lu I g, i.~qme>.!-'~
                                '3i.>) V)0): %u              .'"'~s>ib
                                                                    .d~
                                                                            <<Isa nor.$    .".'~>>',  .3 qq.'s          '>@
Ei.-.;ii
                                                                                                                          '~  4it'~ai  i,iup
                                                                                                                                                            ",IGU<'cl as i'i" uu    bg", ~ii) ~co~ ~.'kq              iivv<~p~;>~a:-',.c, ~i                  <,>.>    i,.~ o    ii  4<  quoit i~q
                                                                                  ,~i 2 ~i:i i      l.'      ~ ')>s}Q q  (  fit I %0      I>i
                    ~  lk is9bfi062<<)'T  a~ai  ))9 ii0
 
North Carolina Department of Crime Control and Public Safety James G. Martin, Governor                                                              Joseph W. Dean, Secretary September          29, 1986 Mr. Harold R. Denton,              Director Office of Nuclear Reacter Regulation United States Nuclear Regulatory Commission Washington, D.. C.
 
==Dear Mr. Denton:==
 
On March 4,           1986, Carolina Power 8 Light; Company (CP&L) requested             a license to operate. the Shearon Harris Nuclear Power Plant. CP&L further requested that the U. S.
Nuclear Regulatory Commission grant a schedular exemption from the requirements in l0 CFR Part 50, Appendix E, S IV.F.1.           This       regulation               would           require     that     a full-participation exercise of t;he Harris emergency plan "be conducted within l year before the issuance of the first operating license for full power and prior to operation above           5$ of rated power ."
The Nort;h Car olina Department of Cr ime Contr ol and Public Safety supports CP&L s request for a schedular exemption.             The     Department s               Division of Emergency Management           (DEM)     is the State agency with primary responsibility for the development and implementation of emergency plans in support of fixed nuclear facilities.
The Division was involved in the initial decision                                           to request an exemption and has planned its exercise schedule accordingly.
The Division of Emergency                             Management       has   worked closely with CP&L, 'he NRC, the Federal Emergency Management         Agency, and the four affected counties to develop a comprehensive emergency plan for the Harris Plant.         The Division has                 eondueted             numerous   emergency planning exercises for nuclear power plants since 1980 and has responded to many major non-nuclear emergencies (some of which have involved large-scale evacuations) in our r0~
86100'it0022 860'V2V PDR F
ADOCK 05000400                                                             gP PDR 512 N. Salisbury Street o P. O. Box 27687 o Raleigh, North Carolina 27611-7687 o (919) 733-2126 An Equal Opportunity / Affirmative Action Employer
 
L P
 
                                            >>
                                          >>)g>> g Mr . Harold R. Denton September 29, 1986 Page 2 State. In May 1985, the Division of Emergency Management and   the other organizations involved conducted a very successful exercise of the Harris Plant emergency plan.
Both the FEMA evaluation and the Division s own internal review confirmed an overall state of readiness for offsite planning and response.       Since then, the Division has provided additional training and other assistance to local emergency workers in order to maintain that state of readiness. A partial exercise with local participation is scheduled for October 28, 1986, and a full participation exercise of scheduled for February 1987. The Department of Crime Control and Public Safety, which represents       the Governor in this matter, is confident that the level of emergency preparedness   has been maintained and, indeed, enhanced since the May 1985 exercise.
In view of these considerations, the Department of Crime Control and Public Safety does not believe that yet another full-participation exercise prior to operation of the Harris Plant is necessary in light of the previous exercise, the one scheduled for October of this year, and 0he full exercise     scheduled for February, 1987. This Department will cooperate fully with any action you think best.
With very best wishes,   I am Sincerely, Joseph     W. Dean JWD:ch
 
J}}

Revision as of 02:45, 22 October 2019

Supports Util Request for Schedular Exemption from Requirements of App E,Section IV.F.1. of 10CFR50 Re Full Participation Exercise of Emergency Plan Conducted within 1 Yr of Full Power License
ML18022A436
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/29/1986
From: Jeremy Dean
NORTH CAROLINA, STATE OF
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610090022
Download: ML18022A436 (6)


Text

REQULAT RY INFORMATION DIBTRIBUTIO SYSTEN ~

(RIDS)

ACCESSION NBR: 8b100900" DOC. DATE: 8b/09/29 NO ARIZED: NO DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. NAl'IE AUTHOR AFFILIATION DEANi J. M. North Carolina> State of REC IP. NANE RECIPIENT AFFILIATION DENTON> H. R. > Office of Nuclear Reactor Regulationi Director (post 851125

SUBJECT:

Supports util request for schedular exemption from requirements of App Ei Section IV. F. 1. of 10CFR50 re full participation exercise of emergency plan conducted (within 1 gr of full potuer license.

DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL BI ZE:

TITLE: Request for NRR Action (e. g. 2. 20b Petitions) 5 Related Correspondenc NOTES: Application for permit renewal filed. 05000400

"

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PWR-A PD2 LA PAR-A PD2 PD BUCKLEY. 8 01 INTERNAL: EDO/ACB ELD/HDS1 NRR DIR REC FIL 04 EXTERNAL: LPDR 03 NRC PDR 02 NBIC 05 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL

,I""." '3i "i <j"., "7P,'6 0>';I 'i'id)i> ll; YH)ii'fc.)IJ".

Ui') '<k")% >'>'" '

x "-0"', o8 al <a(( 'i')'i .,i~);ei i iH.i,"".'C. 3D,)'.

'763 < ) ~ i'.6', ~:i t"..- I " ",'94lO I 7'.;>>,.ilUi'i .! TCil I il'ti " '0<' (i,", jT '.~'> )

i'" il I'.'iT )', )'ih Pci))ii'I",s i',')N .I) l i)A WQ "-~f ~'.'~'~iT X 6'f~')

)307TAI )K ', lh K

)'N J),"<<X > Ill 'i iAi~l )7 0 'APi

  • "!i q) 'Tii k ;39'7 K" 4 ($ 4) i' -" J QR) I OPEC"33 i: '.> 77,)UIR ']0 ,I I "I,':iUI Yi36 ma'<I:to -~ ':;~ijpo.t ';I a'~ qq'i'l 2 Lu I g, i.~qme>.!-'~

'3i.>) V)0): %u .'"'~s>ib

.d~

<<Isa nor.$ .".'~>>', .3 qq.'s '>@

Ei.-.;ii

'~ 4it'~ai i,iup

",IGU<'cl as i'i" uu bg", ~ii) ~co~ ~.'kq iivv<~p~;>~a:-',.c, ~i <,>.> i,.~ o ii 4< quoit i~q

,~i 2 ~i:i i l.' ~ ')>s}Q q ( fit I %0 I>i

~ lk is9bfi062<<)'T a~ai ))9 ii0

North Carolina Department of Crime Control and Public Safety James G. Martin, Governor Joseph W. Dean, Secretary September 29, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reacter Regulation United States Nuclear Regulatory Commission Washington, D.. C.

Dear Mr. Denton:

On March 4, 1986, Carolina Power 8 Light; Company (CP&L) requested a license to operate. the Shearon Harris Nuclear Power Plant. CP&L further requested that the U. S.

Nuclear Regulatory Commission grant a schedular exemption from the requirements in l0 CFR Part 50, Appendix E, S IV.F.1. This regulation would require that a full-participation exercise of t;he Harris emergency plan "be conducted within l year before the issuance of the first operating license for full power and prior to operation above 5$ of rated power ."

The Nort;h Car olina Department of Cr ime Contr ol and Public Safety supports CP&L s request for a schedular exemption. The Department s Division of Emergency Management (DEM) is the State agency with primary responsibility for the development and implementation of emergency plans in support of fixed nuclear facilities.

The Division was involved in the initial decision to request an exemption and has planned its exercise schedule accordingly.

The Division of Emergency Management has worked closely with CP&L, 'he NRC, the Federal Emergency Management Agency, and the four affected counties to develop a comprehensive emergency plan for the Harris Plant. The Division has eondueted numerous emergency planning exercises for nuclear power plants since 1980 and has responded to many major non-nuclear emergencies (some of which have involved large-scale evacuations) in our r0~

86100'it0022 860'V2V PDR F

ADOCK 05000400 gP PDR 512 N. Salisbury Street o P. O. Box 27687 o Raleigh, North Carolina 27611-7687 o (919) 733-2126 An Equal Opportunity / Affirmative Action Employer

L P

>>

>>)g>> g Mr . Harold R. Denton September 29, 1986 Page 2 State. In May 1985, the Division of Emergency Management and the other organizations involved conducted a very successful exercise of the Harris Plant emergency plan.

Both the FEMA evaluation and the Division s own internal review confirmed an overall state of readiness for offsite planning and response. Since then, the Division has provided additional training and other assistance to local emergency workers in order to maintain that state of readiness. A partial exercise with local participation is scheduled for October 28, 1986, and a full participation exercise of scheduled for February 1987. The Department of Crime Control and Public Safety, which represents the Governor in this matter, is confident that the level of emergency preparedness has been maintained and, indeed, enhanced since the May 1985 exercise.

In view of these considerations, the Department of Crime Control and Public Safety does not believe that yet another full-participation exercise prior to operation of the Harris Plant is necessary in light of the previous exercise, the one scheduled for October of this year, and 0he full exercise scheduled for February, 1987. This Department will cooperate fully with any action you think best.

With very best wishes, I am Sincerely, Joseph W. Dean JWD:ch

J