ML18018B532
| ML18018B532 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/22/1983 |
| From: | Baggett C NORTH CAROLINA, STATE OF |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8312290304 | |
| Download: ML18018B532 (10) | |
Text
REGULATORY "INORNATION DISTRIBUTION SYSl
('BIDS) p ACCESSION NBR;831?290304 DOC ~ DATE; 83/12/22 NOTARXZED;.NO DOCKET 0 PACIL:50 400 'Shearon Harris Nuclear Power:Planti Onit ii Carolina 05000400 50 401 'Shear on Hart is.Nuclear,Power
'Pl anti. Unit 2< ICaf ol ina 05000401 AUTH'BNAHE AAUTHOR AFF ILIATION BAGGETT,'G Nor.th"Carol'inai'State of REC IP s NAMBY RECIP IENT.'AFFILIATION KNIGHTONgGB'I'I Li censing. Branch.3
SUBJECT:
Forwards comments from Dept of Human Resources re FES<.
Chlor ine>> used 'as biocideI could result, in itrihalomethane formation in receiving water s r equir ing.notification of water usens.
DISTRIBUTION CODE:
CODES iCOPIES RECEIVED:LTR. 5 ENCL Z 'IZE:, E'
'ITLE:,Pub'lie Comment on Envir onmental Statement NOTES!
RECIPIENT IO CODE/NAME NRR LB3 BC 06 NL>>
ORNL INTERNAL: ELD/HDS1 NRA/DE/AEAB 20 NRA/DE/EHEB NRR/DSI/AE8 19 NRR/DSI/RA8 17 RGA2 COPIES
.LTTR ENCL "7
7 1
'1 1
1 1
i 1.
i 1
1 REC IP IENT
'ID CODE/NAME"-
NRR LB3 LA BUCKLEYgB 01 NRR NORRIS' NRR/DE/EEB 16 NRR/DE/SAB 18 NRR METB 15'4 COPIES LTTR.ENCL' 1
1 1
1 1
1 1
1 EXTERNAl! ACRS NAtL LAB N,SIC 21 05.
6 6
<<5 i
1ii "TOTAL NUMBER OF 'COPIES REQUIREDTTR 36 ENCL 36
1
{'c.'nfl))
i 8 I>(') f I i<<< I ~ITi," I i
. '. fT'i>
)
>IL I i' ii)a><
".I T 3 A'J I'. 9 0 0 I)0 0 0 c> 0 lOAO0020 I)l'i:<I'.IX,gi)AT.i)"
ic~hh I bc>~;.>T4
~ )i.'i i <)gI""x"4q) g i) a'nr fo1o
)
>l
') rnU iPnsf'I 19wo l as
) fouii ~.i )~fi)I noose.'iP.
6n r f ops'.)
> 5 x "roU
~ tn6 f 'I 1swo'<
1s
) f su~<
~ r iv). >I noorortc".
AQI IAIJl 1 )4 Hv)I) '>A
)o oft'fB qf)nr foe)i3 rip')o)'I A0IT AIJ I 3 9 ><
l ftIa I1 IJ 3 )I
)<an616 On r anom 'r J
, 83 1
'O'I 890 IMOc Off nGr)UI'l to )q99
)ilog k cgn9w)pOQ c)b'is@10 1; I
~) )I ti");
gnsnf onq f I)rli 19 nr 9 f I)891 b
fedos ob r~p'rU eA boaV on f ao t n3 To nol Pea r t t9 on
$3nrq rupo'l 81996M Qnl v r9001 nr noii'06m')ol
~ Bloc~U 199 68
<<3XI8 J Jii)3 HTJ g3< IJ J38 83IQO J f)h0$ 3 '4094
<"Ilail fI>'ll"" c l i'ne~i) fe)8 fr'9 nownoz >vn3 ny )no'eoJ a i fdu":.
I I I )
- ~31
'v P3X'30 J
~TTJ k
T>>3I~IQJfi ANAii)XJQ't)3 QI AJ ggJ AHP
)0 8>Y3JPl3UL<
BJX"IOJ JQv)3 HTTJ T k>3 19 1 334 3MAlr')%9403 4I Qk)
QHJ HH>>
J~)HO: Ji')
L t
4>cllHRUA RH)il 033sanyflHV I)&c'i % 3 0 % 8 flN 2 L HT3~"thICnif)HN 40 QJIR Od)I t
r 809 J QO I DHIi)
BIIP CHQA:.IH <<)H.I i 4 s
AAJ J l h)~
GLED/i
North Carolina~~
Department ofAdministration 116 West Jones Street Raleigh 27611 James B. Hunt, Jr., Governor Jane Smith Patterson, Secretary Margaret C. Riddle Coordinator Office of Policy and Planning (919) 733.4131 December 22, 1983 George N. Knighton, Chief Licensing Branch No. 3 Division of. Licensing United State Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Knighton:
RE:
SCH File ll84-E-0000-5112; Issuance of Final Environmental Statement
- Shearon -Harris Nuclear Power Plant, Units 1 and 2
The State Clearinghouse has received and reviewed the above referenced project.
As a result of this review, the State Clearinghouse has received the attached comments from the North Carolina Department of Human Resources.
Thank you for the opportunity to review the above referenced document.
Chrys Baggett (Mrs.)
Clearinghouse Director CB/jcp cc:
Region "J" Attachment c
'83i2290304 83i222 PDR ADOCK 05000400 D
P.DR An Equal Opportunity Affirmative Action Employer
I
- ~
% %f I 1 P I g II A
1 1
I N
lg lt
,V r
1 if,
. The applicant should be advised that although an analysis of chlorine usage as a biocide at the facility has been carefully evaluated from several aspects, particularly with regard to total trihalomethane (TTHM) formation in the receiving waters there is a possibility that TTHM formation.could occur in the receiving waters.
In turn, this could create adverse tx'eatment effects on down stream water treatment facilities. It is suggested that from time to time the applicant analyze ~ater samples from selected sites in the receiving waters and a distance down stxeam to determine the extent of TTHM formation.
If TTHMs are found, the water users on the Cape Fear River should be notified.
The application should also be advised that if the biocide use is changed from chlorine to another type of biocide that the Biocide Interagency Task Force be contacted, to determine whether or not the proposed new biocide would have an adverse affect on the environment.
CER':chf
)ames B. Hunt, Jr. /
Soroh T. Morrow M, CThTC CID MCIOTAAChDCII IQh IADDh OTAAOhlT CIC 41 IAAheal OOCCII IDCrO
DEt; ].6 1983
~M C DISTRIBUTION Document Control (50-400/401)
JLee (2)
DOCKET NO(S).
STN 50-400/401 The Honorable Richard Ottinger.
Chairman Subcomittee on Energy Conseration and Power Committee on Energy and Commer'ce United St'ates House of Representative Nashington, D.C.
20515
SUBJECT:
CAROLINA PONER 5 LIGHT COMPANY, ET. AL. - SHEARON HARRIS NUCLEAR PONER PLANT, UNITS 1
AND 2
, dated The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availabilityof Draft/Final Environmental Statement, dated R Safety Evaluation Report, or Supplement No.
, dated November 1983 Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendment No.
to Application/SAR dated Construction Permit No. CPPR-
, Amendment No.
, dated Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated Other (Specify)
Enclosures:
As stated cc:
Representative Carlos Moorhead bcc:
OCA Office of Nuclear Reactor Regulation OFFICEP SURNAME/
DATE/
N3.
jZ/
/83 NRC FORM 318 {10/80) NROM 0240 OFFICIAL RECORD COPY
I
DEC 1G 1983 gq I TRIBUTION bocument ontrol (50-.400/401)
JLee (2)
DOCKET NO(S).
STN 50-400/401 The Honorable Alan Simpson, Chairman Subcommittee on Nuclear Regulation Committee on Environment and Public Works United States Senate Washington.
D.C.
20515
SUBJECT:
CAROLINA POWER 5 LIGHT COI1PANY, ET. AL. - SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 1
AND 2
, dated The following documents concerning our review of the subject facilityare transmitted for your information.,
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Notice of Availabilityof Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
, dated Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume Amendmenf No.
to Application/SAR dated Construction Permit No. CPPR-
, Amendment No.
, dated Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated Other (Spec//y)
Enclosures:
As stated
'c:
Senhtor Gary Hart bcc:
OCA Office of Nuclear Reactor Regulation OFFICE/
SURNAME)
OATE P D 'L 43 JL ft
/R3.
~ ~ ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
NRC FORM 318 (IO/80) NRCM 0240 OFFICIAL RECORD COPY
0 P 1
'll C
'I I
I