|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML20247C7521989-02-18018 February 1989 Advises That Granting Permission to Move Spent Fuel Rods for Storage at Shearon Harris Considered Unsafe Move ML18004B7381987-03-24024 March 1987 Advises That Citizen Committee on Nuclear Energy Now Called Nuclear Energy Public Info Committee.Related Info Encl ML20206A2611986-12-0202 December 1986 Requests Info Re Status of Commission Investigation Into Milam Allegations Re Design Qa/Qc Program Deficiencies for GE Nuclear Power Plants.Allegations Could Pose Serious Safety Problems at Facility & Other GE Nuclear Reactors ML18004B5991986-10-31031 October 1986 Requests Comments & Suggestions Re Proposed Organization of Citizens Advisory Board.Requests Comments Before 861120 ML18022A4361986-09-29029 September 1986 Supports Util Request for Schedular Exemption from Requirements of App E,Section IV.F.1. of 10CFR50 Re Full Participation Exercise of Emergency Plan Conducted within 1 Yr of Full Power License ML18004A5201986-09-18018 September 1986 Opposes Util Request for Waiver of full-scale Evacuation Drill Before Obtaining Ol.Nrc Should Insist That Required Emergency Exercise Drill Be Held on School Day to Enable Affected Parties to Plan Contingencies ML18022A4061986-09-0909 September 1986 Opposes Util Request for Exemption from 10CFR50,App E Requirements Re Full Participation Exercise of Emergency Response Plan within 1 Yr Prior to Commercial Operation.Mods Have Been Made or Planned Since May 1985 Exercise ML20205F4821986-08-14014 August 1986 Urges Denial of Util Request for Exemption from Requirement Under 10CFR50,App E,That Util Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr Prior to Commercial Operation.Served on 860818 ML20214K6411986-08-11011 August 1986 Urges Denial of Util Request for Exemption from 10CFR50,App E Requirement to Conduct Full Participation Exercise of Emergency Response Plan for Plant within 1 Year Prior to Commercial Operation.Served on 860819 ML18004A3761986-07-28028 July 1986 Requests Info Re How State Can Regulate Nuclear Energy by Forming Regulatory Agency,Including Goals,Objectives & Structure.Desires to Have Facility of Stellar Quality ML20214V3021986-07-0909 July 1986 Informs of Change of Address ML20211P0121986-07-0707 July 1986 Forwards 860707 Resolution Agreeing to Carry Out Operational Roles Outlined in Emergency Plan.Served on 860709 ML20199E1711986-06-12012 June 1986 Forwards Resolutions 86-6-9/R-1A & 86-6-9/R-1B,endorsing Conversion of Plant to non-nuclear Fuel Plant & Expressing Concerns Re Proximity of Plant to Town of Chapel Hill,Nc, Respectively.Served on 860620 ML20195B3371986-05-22022 May 1986 Forwards Resolution 6137 Endorsing Conversion of Facility to non-nuclear Fuel Plant & Expressing Opposition to Licensing or Operation of Plant Due to Inadequate Emergency Planning & Insignificant Energy Benefits.Served on 860527 ML20137H7531985-11-22022 November 1985 Forwards Motion to Subpoena Bassiouni in Eddleman Contention 57-C-3 (Sirens) ML18019A4201985-10-14014 October 1985 Requests That Svc List for All Related Matls Be Revised to List Ja Sanford as State of Nc Counsel of Record ML20133E8391985-10-0404 October 1985 Forwards Expurgated Testimony of D Williams to Be Substituted for Prefiled Testimony Previously Furnished & Expunged,Per J Kelley 850930 Ruling.Related Correspondence ML20135H8231985-09-20020 September 1985 Forwards Testimonies of D Williams,Sl Burch & Cj Overton. List of Witnesses Also Encl.Related Correspondence ML20099D3061984-11-13013 November 1984 Submits Comments Supporting Licensing of Facility.Served on 841116 ML18018B5641984-02-0707 February 1984 Forwards Distribution List Denoting Correct Number of Documents Listed Individual Supposed to Receive ML18018B5321983-12-22022 December 1983 Forwards Comments from Dept of Human Resources Re Fes. Chlorine Used as Biocide Could Result in Trihalomethane Formation in Receiving Waters,Requiring Notification of Water Users ML18018A6071983-07-0505 July 1983 Forwards Nc Dept of Natural Resources & Community Development Comments on Des.Wildlife Mgt Plan for Mitigation of Land Use Impacts Not Yet Received ML20072G2651983-03-17017 March 1983 Requests Ke Long,As Representative of Nc Util Commission,Be Added to Svc List ML18017B9511982-06-28028 June 1982 Ack Receipt of NRC 820614 Ltr Re Preparation of Eis.No Evidence to Indicate That Plant Will Have Any Effect Upon Significant Archeological Resources within 50-mile Radius. Requests Info Re Current Status of Burke & Ragan Houses ML18017A9331980-02-27027 February 1980 Forwards Draft NPDES Permit.Revised Draft Will Be Resubmitted to EPA ML18017A6861979-10-0202 October 1979 Requests Revision of Svc List as Result of Administrative Changes.Jc Brake & Dp Myers Should Be Deleted.Md Gordon, Associate Atty General,Should Be Added ML18017A6281979-08-0606 August 1979 Ack Receipt of 790816 Ltr Re Water Quality Certification 214.Certification Originally Issued 731220,subsequently Revised & Reissued 770914 & Is Still Valid ML19276E8231979-02-27027 February 1979 Delineates Misreading or Misunderstanding by TS Erwin of 781228 Order.It Is Nc Util Commission'S View That NRC Should Be Bound by Prior Findings on Question of Need for Power in Any Licensing Proceeding ML18017B9451977-09-0909 September 1977 Informs of Archeological & Historical Studies Undertaken by Cp&L.Request of 770902 to Be Disregarded ML18017B9441977-09-0202 September 1977 Requests Repts of Assessment of Facility Impact on Archeological Resources,Such as Surveys,Testing or Excavation & Measures Taken to Prevent Any Adverse Effect 1989-02-18
[Table view] |
Text
RESULATORQNFORNATION DISTRIBUTION S'EN (RIOR)
ACCESSION NBR: 8003110576 DOC DATE: 80/02/27 NOTARIZED: NO DOCKET
~
FACIL:50 400 Shear on Harrjs Nuclear Power Pl anti Uni t 50-401 Shearon Herr js Nuclear Power Pl anti Unj t 2i Carolina ii Carol ina 05000400 05000401 50 402 Shear on Harris Nuclear Power Planti Unit 3i Carolina 05000402 AUTH, NAME AUTHOR AFFILIATION MILLS' ~ C, North Carol inai State of REC IP ~ NAME RECIPIENT'FFILIATION KEBLUSEKiS, Assistant Director for Envitonmental Projects SUBJECT! Forwar ds draft NPDES permit.Revised dr af t wi l be 1 resubmitted to EPA ~
DISTRIBUTION CODE: C002B TITLE: Environ ~
COPIES RECEIVED:LTR Comments' I ENCL f SIZE>>
C'
~
e ea~~~~oewes'wea~aeweeewmeeew~~w~weew'eee~~ee~mee I
~~~~oeeeeeee~eee~ee~eeeeweew RECIPIENT CO PIES RECIPIENT'OPIES ID CODE/NAME L~T TR ENCL ID CODE/NAME LTTR ENCL ACTION; 05 PM ~ Kg'Qc-C4SEW 1 1 17 BCCPKZ 1 1 18 LA EPg~ g 1 1 ADWOORg 1 0 INTERNAL 1 PEG FI 1 1 02 NRC PDR 1 1 2 2 09 ENVN SPEC BR 1 1 10 CST BNFT ANL 1 1 12 GEOSCIEN BR 1 1 13 HYDRO~METEOR 1 1 14 ACDENT ANALY 1 1 15 EFLT TRT SYS 1 1 16 RAD ASMT BR 1 1 19 DIR: DSE'D 1 1 AD ENVIRON TECH 1 0 SITE ANALY 1 0 OELD 1 0 EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 20 NATL, LAB 5 5 ACRS 1 0 UwP 4-~~4 9
~wnFQ a ~RP9 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL 22
h tl t
l'-.'4'r g" e'. 4 5.% &p )l s ~
s0<>< ~)
4 g =o I>> -'e t "IP h f44
~ 1~$ mls l
~4
North Carolina Department of Natural QM Resources 8 Community Development Howard N. Lee, Secretary James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT February 27, 1980 Ms. Suzanne Keblusek U.S. Nuclear Regulatory Commission Environmental Pro)ects Branch Washington, D.C. 20555
Subject:
Draft NPDES Permit Carolina Power and Light Company Shearon Harris Nuclear Plant Wake County
Dear Ms. Keblusek:
Please find attached one copy of the draft permit for Shearon Harris Plant. We are in the process of revising this draft for resubmission to EPA. It is hoped that the permit can issue without substantial change from this draft. If we may be of further assistance, please advise.
Sincerely, William C. Mills Supervisor Discharge Permits Unit WCM/cj Attachment goa27667 Ralalgh, Norah Carolioa2768 0 03 1 R 0 dh'.P An Equal Opportunity Afflrmatlue Action Employer
0 r.
,r
STATE OF NORTH CAROLINA DEPARTMENT OF NATURAL RESOURCES & COMMUNITY, DEVELOPMENT DIVISION OF ENV IRONMENTAL MANAGEMENT PERNIT To Discharge Wastewater Under The NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted, by the North Carolina Environmental Management Comaission, and the Federal Mater Pollution Control Act, as amended, Carolina Pov>er and Light Company is hereby authorized to discharge wastewater from a facility located at Shearon Harris Nuclear Power Plant to receiving waters Sheron Harris Reservoir on Buckhorn Creek in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, and III hereof.
This permit shall become effective This permit and the authorization to discharge shall expire at midnight on september 30, 1980.
Signed this day of Dir'ector 7i..
Division of Environmental Management By Authority of the Environmental Management Commission Ml & Il
(,(
~ 'j~
Page of Permit No. NC 0 03 9586 SUPPLEMENT TO PERMIT COVER SHEET Carolina Power and Light Company is hereby authorized to: (include only appropriate items)
- l. Enter into a contract for construction of wastewater treatment facilities
- 2. Make an outlet into Shearon Harris Reservoir on Buckhoxn Creek 0
- 3. Construct and operate a facilities to control pollutants from cooling tower blowdown, sanitary sewage treatment plant, metal cleaning and low volume wastes in accordance with applicable effluent limits located at Shearon Harris Nuclear Power Plant subject to Part III, condition No. c. of this Permit, and
- 4. Discharge from said treatment works into the Shearon Harris Reservoir Buckhorn Creek which is classified Class "C".
M 2 8I I 2
e T K
) E p p II I
I\ (% 4 I
GJ A. ( ). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning at first discharge and lasting until expiration permittee is authorized to discharge from outfall(s) serial number(s). 001 cooling tower blowdown to Such discharges shall be limited and monitored by the permittee as specified below: the Shearon Harris Reservoir Effluent Characteri sti cs Discha e Limitations Monitorin Re uirements Kg/day (lbs/day) Other Units (Speci fy) Measurement Sample Sample Daily Avg. Daily Max. Daily Avg. Daily Max. Fr equency ~ye Location Flow 1/ 60 mgd Continuous Recorder S Temperature 1/ 1/ 1/
Zinc 1.0 mg/1 1.0 mg/1 1/ week Grab Total Chromium 0.2 mg/1 0.2 mg/1 1/ week Grab E*
Phosphorus 5 mg/1 5 mg/1 1/ week EA'rab Free available Chlorine 2/
1/ Discharge of blowdown from the cooling system shall be limited to the minimum discharge of recirculating water necessary for the purpose of discharging materials contained in the process, the further build-up of which would cause concentrations oa or a-ounts exceeding li-its of establ-'shed engineering practice. Discharge temperature shall not exceed the lowest t'emperatc of the recirculating cooling water prior to the addition of make-up. The discharge shall not result in the violation of Class "C" water quality standards outside of a mixing zone of 200 acres around the point of discharge. The temperature within the mixing zone shall not exceed 95oF at any time. Monitoring adequate to demonstrate compliance with these con-ditions shall be proposed by the permittee and, upon approval of the proposal; the results submitted with the monthly monitoring reports.- The permittee may discharge cooling water to the auxiliary reservoir in compliance with Part XII-E of this permit.
2/ Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant discharge free available or total residual chlorine at any one time unless" the permittee can demonstrate to the Director, Division of Environmental Management that the unit in questi~~~~
cannot operate at or below this level of chlorination.
A N.3 e cv
- Effluent prior to mixing with any other waste stream.
C>
O pH'hall not be less than 6.0 standard units nor greater than 9.0 standard units CA.
The Qo and shall be monitored weekly on a grab sample of h f 0 There shall be no discharge of floating solids or visible foam in other than trace amounts.
~s t
I
\
I J
f'M h
) ~ ~
C, I
(
I
m A. ( ). EFFLUENT LIHITATIONS ANO HONITORING REQUIREHENTS During the period beginning on initiation of discharge and 1 asti ng until expiration permittee is author ized to discharge from outfall (s) serial number(s). 002 Sanitary vraste treatment Such discharges shall be limited and monitored by the permittee as specified below: plant discharge to Shearu Harris reservoir on Buckhorn Effluent Characteri sti cs Oischar e Limitations Honitorfn Re ufrements CreeL, Kg/day (lbs/day) Other Units (SPecffy) Heasurement Sample Sample a Daily Avg. Daily Hax. Daily Avg. Daily Hax. ~~ye Location 0.05 MGD 0.075 MGD Continuous Recorder I,.or E
- BOD 30 mg/1 45 mg/1 Monthly Composite E 30 mg/1 45 mg/1 Quarterly Composite . E W I-Influent, Z-Effluent D
fD a a Saa
~
CCl $
CO Q M
CO Cv o0 CO The pH shall not be less than 6.0 standard units nor greater than g.0 standard units Q<
and sha11 be monitored monthly on a grab sample of the effluent. 00 Cb There shall be no discharge
- from the point of discharge. of floating solfds-. or vfsfble foam fn other than trace amounts outside of an area 5 meters
I CA
A* -
( ). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning upon initiation of discharge and lasting until expiration permittee is authorized to discharge from outfall(s) serial number(s). 003 metal cleaning wastes Such discharges shall be limited and monitored by the permittee as specified below: discharged to Sheron Harris Reservoir on Buckhorn Cree3c
- fluent Characteristics Discha e Limitations Monitorin Re uirements
(
Kg/day (lbs/day) Other Units (Specify) Measurement Sample Saigl e Daily Avg. Daily Max. Dally Avg. Dally Max. Frequency ~~y e Location Plow pe8 . During discharge E%
30 mg/1 100 mg/1 Daily during discharge Grab pil 8 Grease 15 mg/1 20~/1 Daily during discharge Grab.
Cooper, Total 1.0 mg/1 1.0 mg/1 Daily during discharge Grab Iron, Total 1.0 mg/1 1.0 mg/1 Daily during discharge Grab
+Effluent prior to mixing with any other waste stream 1/ Commensurate with treatment system installed a a Q Ciy Aa QEO 4 C0 o0 The pH shall not be less than 6.p 0 standard units nor greater than 9.p standard units and shall be monitored dai> d~ discharge. bn a grab sample of the effluent. Q; 00 shall- be-no discharge of floating solids or visible foam in other than trace ~Qunt outside of an 5 metert e
x
0 1 l
4 f 0
'I f t
II f 'I
'S
A. ( ). EFFLUENT LIMITATIONS ANO MONITORING RE(UIREMENTS During the period begfannfng upon initiation of discharge and 1astfng until expiration permittee fs authorfzed to discharge from outfall(s) serial number(s). 004 low volume wastes discharged.
Such discharges shall be limited and monitored by the permittee as specified beloved: to Shearon Harris Reservoir on Buckhorn Creek Effluent Characteristics Dfschar e Limitations Monftorfn Re ufrements Kg/day (lbs/day) Other Units (Specify) Measurement Sample Sample Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Location
~Ty e F<ow 3.0 MGD A.5 MGD 1/ 1/ 1/
TSS 30 mg/1 100 mg/1 -
Weekly Grab Zfflu "Oil 8 Grease 15 mg/la 20 mg/1 Weekly Grab 1/ Commensurate with treatment system installed
%Effluent prior to mixing with any %ther waste stream oem'ELl g
<<D oo
~
The pH shall not be less than 6.0 standard unfts nor greater than 9.0 standard units and shall be monitored weekly: on a 0 Qi gra~a Ppl~'.-of
-o the f tQ effluent 00'b There shall be no dfscharae Imp the nant of discharfe. of floatfng solids or visible foam fn other than trace amounts outside of an area 5 meter'
~ I'- J~.
l s'~ k ( l J
I
A. ( ). EFFLUENT LIHITATIONS AND HONITORING RE(UIREHENTS During the period beginning upon initiation of dis harg and lasting until expiration permittee is authorized to discharge from outfa11(s] serial number(s). 005 Point source run-orr Such discharges shall be limited and monitored by the permittee as specified below: from construction-Effluent Characteristics Dischar e Limitations Honitorin Re uirements Kg/day (lbs/day)
- Other Units (Specify) Heasurement Sample Samp1e Daily Avg. Daily Max. Daily Avg. Daily Max. Frequency Type Location Point source run-off from construction is permitted in compliance with a
the Land Quality Section of the Division of Earth Resources. sedimentation and erosion control plan a roved. b
0 ( ~
g
~> h >
v K l ART II Permit No. NC
- 5. Toxic Pollutants Notwithstanding Part if II, B-4 above, a toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established under Section 307(a) of the Act for a toxic pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant,. in this permit, this permit shall be revised.or modified in accordance with the toxic effluent standard or prohibition and the permittee so notified.
- 6. Civil and Criminal Liability Except as provided in permit conditions on "Bypassing" (Part II, A-5) and "Power Failures" (Part II, A-7), nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance pursuant to N. C. G. S. 'l43-215.6 or Section 309 of the Federal Act, 33 USC 1319.
- 7. Oil and Hazardous Substance Liability Nothing in this permit shall be construed to'preclude the institution of any legal action or relieve the permittee from any"responsibilities, liabilities, or penalties to which the permittee is or may be subject under N. C. G, S. 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
- 8. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does authorize any injury to private property or any invasion of personal it rights, nor any infringement of Federal, State or local laws or regulations.
- 9. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circum-stance, is held invalid, the application of such provision to other cir-cumstances, and the rescinder of this permit shall not be affected thereby.
All & I10
j'p
> ~
'a.
b PART II Page of Permit No NC
- 10. Expiration of Permit Permittee is not authorized to discharge after the expiration date.
In order to rece/Ve authorization to discharge beyond the expiration date, the permittee shall submit such information, forms, and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any discharge without a permit after the expiration will subject the permittee to enforcement procedures as provided in N. C. G. S. 143-215.6 and 33 USC 1251 et seq..
ART III Page of Permit No. NC B. Previous Permits All previous State water quality permits issued to this facility, whether for construction or operation or discharge, are hereby revoked by issuance of this permit. The conditions, requirements, terms, and provisions of this permit authorizing discharge under the National Pollutant Discharge Elimination System governs discharges from this facility.
C. Construction I
No construction of wastewater treatment facilities or additions thereto shall be begun until Final Plans and Specifications have been submitted to the Division of Environmental management and written approval and Authorization to Construct has been issued. If no objections to Final Plans and Specifications has been made by the DEN after 30 days following receipt of the plans or issuance of this permit, whichever is latter, the plans may be considered approved and construction authorized.
D. Certified Operator Pursuant to Chapter 90A of North Carolina General Statutes, the permittee shall employ a certified wastewater treatment plant operator in responsible charge of the wastewater treatment facilities. Such operator must hold a certification of the grade equivalent to the classification assigned to the wastewater treatment facilities.
M 15 5 I 12
Cv l
I
Part III E Heated water discharge to the Auxiliary Reservoir In order to insure that the Auxiliary reservoir is available for its'esigned use at all times the permittee may circulate heated water through the auxiliary re-servoir $ o prevent ice formation at any time that the surface water temperature~ is below 35 F provided that )he surface water temperature in the auxiliary reservoir is not raised more than 5 F above ambient temperature and in no case is raised to more than 40 F.
Part III F There shall be no discharge of polychlorinated biphenyls (PCB's) from this site.
Part III - G Withdrawal from the Cape Fear River Withdrawals from the Cape Fear River, shall be limited to 255 of the flow in the river except that no withdrawals shall be made from the river when the flow is
-600 cfs or less nor which will reduce the flow in the river to less than 600 cfs as measured at the USGS Lillington Gauge.