| | issue date = 04/13/2018 | | | issue date = 04/13/2018 |
| | title = EA-18-008 Davis-Besse Nuclear Power Station - Final Significance Determination of a White Finding with Assessment Follow-up and Notice of Violation; NRC Inspection Report 05000346/2018090 | | | title = EA-18-008 Davis-Besse Nuclear Power Station - Final Significance Determination of a White Finding with Assessment Follow-up and Notice of Violation; NRC Inspection Report 05000346/2018090 |
| | author name = West K S | | | author name = West K |
| | author affiliation = NRC/RGN-III | | | author affiliation = NRC/RGN-III |
| | addressee name = Bezilla M | | | addressee name = Bezilla M |
Line 9: |
Line 9: |
| | docket = 05000346 | | | docket = 05000346 |
| | license number = NPF-003 | | | license number = NPF-003 |
| | contact person = Lambert K J | | | contact person = Lambert K |
| | case reference number = EA-18-008 | | | case reference number = EA-18-008 |
| | document report number = IR 2018090 | | | document report number = IR 2018090 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 | | {{#Wiki_filter:UNITED STATES pril 13, 2018 |
|
| |
|
| April 13, 2018 EA-18-008
| | ==SUBJECT:== |
| | | DAVIS-BESSE NUCLEAR POWER STATION - FINAL SIGNIFICANCE DETERMINATION OF A WHITE FINDING WITH ASSESSMENT FOLLOW-UP AND NOTICE OF VIOLATION; NRC INSPECTION REPORT 05000346/2018090 |
| Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company
| |
| | |
| Davis-Besse Nuclear Power Station
| |
| | |
| 5501 North State Route 2 Oak Harbor, OH 43449-9760
| |
| | |
| SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - FINAL SIGNIFICANCE DETERMINATION OF A WHITE FINDING WITH ASSESSMENT FOLLOW-UP AND NOTICE OF VIOLATION; NRC INSPECTION REPORT 05000346/2018090 | |
|
| |
|
| ==Dear Mr. Bezilla:== | | ==Dear Mr. Bezilla:== |
| This letter provides you the final significance determination of the preliminary White finding discussed in U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000346/2018010, dated March 9, 2018. A copy of the inspection report can be found in the NRC's Public | | This letter provides you the final significance determination of the preliminary White finding discussed in U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000346/2018010, dated March 9, 2018. A copy of the inspection report can be found in the NRCs Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html under accession number ML18068A523. The finding involved the failure to provide appropriate instructions to maintain an adequate amount of oil in auxiliary feedwater turbine bearing oil sumps as required by Title 10 of the Code of Federal Regulations (CFR) Part 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings. The auxiliary feedwater pump is a component subject to the requirements of 10 CFR Part 50, Appendix B. The failure to provide instructions to properly calibrate sight glasses resulted in a low oil level in the auxiliary feedwater pump 1 turbine inboard bearing reservoir causing the failure of the auxiliary feedwater pump on September 13, 2017. The pump was inoperable from June 21, 2017, when oil was last removed from the bearing reservoir after the last quarterly surveillance, until September 15, 2017, when the bearing was replaced and the system successfully returned to service. The low oil level resulted in the auxiliary feedwater pump being unable to perform its intended safety function and becoming inoperable for a time longer than its technical specification allowed outage time. |
| | |
| Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html under accession number ML18068A523. The finding involved the failure to provide appropriate instructions to maintain an adequate amount of oil in auxiliary feedwater turbine bearing oil sumps as required by Title 10 of the Code of Federal Regulations (CFR) Part 50 Appendix B, Criterion V, "Instructions, Procedures, and Drawings." The auxiliary feedwater pump is a component subject to the requirements of 10 CFR Part 50, Appendix B. The failure to provide instructions to properly calibrate sight glasses resulted in a low oil level in the auxiliary feedwater pump 1 turbine inboard bearing reservoir causing the failure of the auxiliary feedwater pump on September 13, 2017. The pump was inoperable from June 21, 2017, when oil was last removed from the bearing reservoir after the last quarterly surveillance, until September 15, 2017, when the bearing was replaced and the system successf ully returned to service. The low oil level resulted in the auxiliary feedwater pump being unable to perform its intended safety function and becoming inoperable for a time longer than its technical specification allowed outage time. | |
|
| |
|
| In a letter dated March 16, 2018, you indicated that the Davis-Besse Nuclear Power Station would not request a regulatory conference and would not submit a written response. According to NRC Inspection Manual Chapter 0609, appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to the preliminary determination letter. | | In a letter dated March 16, 2018, you indicated that the Davis-Besse Nuclear Power Station would not request a regulatory conference and would not submit a written response. According to NRC Inspection Manual Chapter 0609, appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to the preliminary determination letter. |
Line 40: |
Line 31: |
| After considering the information developed during the inspection, the NRC has concluded that the finding is appropriately characterized as White, a finding of low to moderate safety significance. | | After considering the information developed during the inspection, the NRC has concluded that the finding is appropriately characterized as White, a finding of low to moderate safety significance. |
|
| |
|
| The NRC has also determined that the failure to provide appropriate instructions on how to calibrate the turbine bearing oil sight glasses is a violation of 10 CFR Part 50, Appendix B, Criterion V and technical specifications as cited in the enclosed Notice of Violation (Notice). The circumstances surrounding the violation were described in detail in Inspection Report 05000346/2018010. In accordance with the NRC Enforcement Policy, the Notice is considered escalated enforcement action because it is associated with a White finding. | | The NRC has also determined that the failure to provide appropriate instructions on how to calibrate the turbine bearing oil sight glasses is a violation of 10 CFR Part 50, Appendix B, Criterion V and technical specifications as cited in the enclosed Notice of Violation (Notice). |
| | |
| | The circumstances surrounding the violation were described in detail in Inspection Report 05000346/2018010. In accordance with the NRC Enforcement Policy, the Notice is considered escalated enforcement action because it is associated with a White finding. |
|
| |
|
| The NRC has concluded that the information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance will be achieved is already adequately addressed on the docket in Inspection Report 05000346/2017004 (ML18045A076). Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. | | The NRC has concluded that the information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance will be achieved is already adequately addressed on the docket in Inspection Report 05000346/2017004 (ML18045A076). Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. |
|
| |
|
| As a result of our review of Davis-Besse Nuclear Power Station's performance, including this White finding, we have assessed the Davis-Besse Nuclear Power Station to be in the Regulatory Response column of the NRC's Action Matrix, effective the fourth quarter of 2017. | | As a result of our review of Davis-Besse Nuclear Power Stations performance, including this White finding, we have assessed the Davis-Besse Nuclear Power Station to be in the Regulatory Response column of the NRCs Action Matrix, effective the fourth quarter of 2017. |
| | |
| Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001,
| |
| "Supplemental Inspection Response To Action Matrix Column 2 Inputs," when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing cause of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.
| |
| | |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
| |
| . To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
| |
| | |
| Sincerely,/RA/ K. Steven West Regional Administrator
| |
|
| |
|
| Docket No. 050-00346 License No. NPF-3
| | Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection Response To Action Matrix Column 2 Inputs, when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing cause of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence. |
|
| |
|
| ===Enclosure:===
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. |
| Notice of Violation
| |
|
| |
|
| cc: Distribution via LISTSERV | | Sincerely, |
| | /RA/ |
| | K. Steven West Regional Administrator Docket No. 050-00346 License No. NPF-3 Enclosure: |
| | Notice of Violation cc: Distribution via LISTSERV |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 IR 05000346/20234022023-12-19019 December 2023 Cyber Security Inspection Report 05000346/2023402 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000346/20220062023-03-0101 March 2023 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2022006) IR 05000346/20220912023-02-10010 February 2023 NRC Inspection Report 05000346/2022091 and Apparent Violation IR 05000346/20220042023-02-0909 February 2023 Integrated Inspection Report 05000346/2022004 and 07200014/2022001 IR 05000346/20224042023-02-0808 February 2023 Material Control and Accounting Program Inspection Report 05000346/2022404 IR 05000346/20224032023-01-23023 January 2023 Security Baseline Inspection Report 05000346/2022403 IR 05000346/20220112023-01-0505 January 2023 Triennial Fire Protection Inspection Report 05000346/2022011 IR 05000346/20220032022-11-10010 November 2022 Integrated Inspection Report 05000346/2022003 IR 05000346/20220402022-11-10010 November 2022 95001 Supplemental Inspection Report 05000346/2022040 and Follow-Up Assessment Letter IR 05000346/20220102022-11-0202 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000346/2022010 IR 05000346/20224402022-10-0404 October 2022 NRC Supplemental Inspection (95001) Interim Report 05000346/2022440 IR 05000346/20220052022-08-25025 August 2022 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2022005) IR 05000346/20220022022-08-11011 August 2022 Integrated Inspection Report 05000346/2022002 ML22208A0652022-07-27027 July 2022 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 IR 05000346/20220122022-06-30030 June 2022 Phase III 71003 License Renewal Report 05000346/2022012 IR 05000346/20224012022-05-17017 May 2022 Security Baseline Inspection Report 05000346/2022401 IR 05000346/20220012022-05-12012 May 2022 Integrated Inspection Report 05000346/2022001 IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 IR 05000346/20210062022-03-0202 March 2022 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2021006) IR 05000346/20210922022-03-0101 March 2022 EA-21-155 Davis Besse - Final Significance Determination of White Finding, Notice of Violation and Assessment Follow Up Letter, NRC Inspection Report 50000346/2021092 IR 05000346/20210042022-02-0909 February 2022 Integrated Inspection Report 05000346/2021004 and Exercise of Enforcement Discretion ML22032A3142022-02-0101 February 2022 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000346/2022010 IR 05000346/20210122022-01-31031 January 2022 Temporary Instruction 2515/194 Inspection Report 05000346/2021012 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding IR 05000346/20214042021-12-0909 December 2021 Security Baseline Inspection Report 05000346/2021404 ML21340A2212021-12-0909 December 2021 NRC Inspection Report (05000346/2021090) Preliminary White Finding IR 05000346/20210502021-11-19019 November 2021 Special Inspection Reactive Report 05000346/2021050 and Apparent Violation IR 05000346/20210032021-11-10010 November 2021 Integrated Inspection Report 05000346/2021003 IR 05000346/20210112021-11-0101 November 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000346/2021011 IR 05000346/20214032021-10-14014 October 2021 Security Baseline Inspection Report 05000346/2021403 IR 05000346/20210102021-10-0707 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000346/2021010 IR 05000346/20214012021-10-0707 October 2021 Cyber Security Inspection Report 05000346/2021401 and Premliminary Greater than Green Finding and Apparent Violation IR 05000346/20210052021-09-0101 September 2021 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2021005) IR 05000346/20210022021-08-12012 August 2021 Integrated Inspection Report 05000346/2021002 and 07200014/2021001 IR 05000346/20215012021-06-15015 June 2021 Emergency Preparedness Inspection Report 05000346/2021501 2024-02-02
[Table view] Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:Notice of Violation
MONTHYEARIR 05000346/20180902018-04-13013 April 2018 EA-18-008 Davis-Besse Nuclear Power Station - Final Significance Determination of a White Finding with Assessment Follow-up and Notice of Violation; NRC Inspection Report 05000346/2018090 IR 05000346/20170012017-05-12012 May 2017 NRC Integrated Inspection Report 05000346/2017001, Notice of Violation, and Quarterly Assessment Letter IR 05000346/20100072010-04-30030 April 2010 EA-09-332, Davis-Besse Nuclear Power Station, Notice of Violation, NRC Inspection Report No. 05000346-10-007(DRS) IR 05000346/20105022010-02-25025 February 2010 IR 05000346-10-502, for Davis-Besse, Final Significance Determination for a White Finding, Notification of Follow-Up Assessment, and Notice of Violation IR 05000346/20050102005-05-0505 May 2005 EA-04-231; EA-04-232 Davis-Besse, Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report No. 05000346/2005010(DRS) ML0505600262005-02-24024 February 2005 EA-01-082; EA-04-172, Williams Power, Notice of Violation ML0412802322004-05-0707 May 2004 EA-03-209, Davis-Besse, Notice of Violation IR 05000346/20040052004-03-0505 March 2004 Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 50-346/04-05), Davis-Besse Nuclear Power Station ML0406800702004-03-0505 March 2004 IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness ML0328017062003-10-0707 October 2003 EA-03-131, Davis-Besse, Notice of Violation ML0420901342003-07-0909 July 2003 Partially Redacted Response to Individual Action IA-01-055, Notice of Violation ML0305100722003-02-19019 February 2003 EA-02-117/EA-02-257, Davis Besse, NOV 2/19/03 & Cover Ltr 2018-04-13
[Table view] |
Text
UNITED STATES pril 13, 2018
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - FINAL SIGNIFICANCE DETERMINATION OF A WHITE FINDING WITH ASSESSMENT FOLLOW-UP AND NOTICE OF VIOLATION; NRC INSPECTION REPORT 05000346/2018090
Dear Mr. Bezilla:
This letter provides you the final significance determination of the preliminary White finding discussed in U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000346/2018010, dated March 9, 2018. A copy of the inspection report can be found in the NRCs Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html under accession number ML18068A523. The finding involved the failure to provide appropriate instructions to maintain an adequate amount of oil in auxiliary feedwater turbine bearing oil sumps as required by Title 10 of the Code of Federal Regulations (CFR) Part 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings. The auxiliary feedwater pump is a component subject to the requirements of 10 CFR Part 50, Appendix B. The failure to provide instructions to properly calibrate sight glasses resulted in a low oil level in the auxiliary feedwater pump 1 turbine inboard bearing reservoir causing the failure of the auxiliary feedwater pump on September 13, 2017. The pump was inoperable from June 21, 2017, when oil was last removed from the bearing reservoir after the last quarterly surveillance, until September 15, 2017, when the bearing was replaced and the system successfully returned to service. The low oil level resulted in the auxiliary feedwater pump being unable to perform its intended safety function and becoming inoperable for a time longer than its technical specification allowed outage time.
In a letter dated March 16, 2018, you indicated that the Davis-Besse Nuclear Power Station would not request a regulatory conference and would not submit a written response. According to NRC Inspection Manual Chapter 0609, appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to the preliminary determination letter.
After considering the information developed during the inspection, the NRC has concluded that the finding is appropriately characterized as White, a finding of low to moderate safety significance.
The NRC has also determined that the failure to provide appropriate instructions on how to calibrate the turbine bearing oil sight glasses is a violation of 10 CFR Part 50, Appendix B, Criterion V and technical specifications as cited in the enclosed Notice of Violation (Notice).
The circumstances surrounding the violation were described in detail in Inspection Report 05000346/2018010. In accordance with the NRC Enforcement Policy, the Notice is considered escalated enforcement action because it is associated with a White finding.
The NRC has concluded that the information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance will be achieved is already adequately addressed on the docket in Inspection Report 05000346/2017004 (ML18045A076). Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position.
As a result of our review of Davis-Besse Nuclear Power Stations performance, including this White finding, we have assessed the Davis-Besse Nuclear Power Station to be in the Regulatory Response column of the NRCs Action Matrix, effective the fourth quarter of 2017.
Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection Response To Action Matrix Column 2 Inputs, when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing cause of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Sincerely,
/RA/
K. Steven West Regional Administrator Docket No. 050-00346 License No. NPF-3 Enclosure:
Notice of Violation cc: Distribution via LISTSERV