August 27, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018412

Dear Mr. Bezilla:

On July 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Inspection at your Davis-Besse Nuclear Power Station. On July 24, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Enclosure:

IR 05000346/2018412 cc: Distribution via LISTSERV

SUMMARY

The U.S. Nuclear Regulatory Commission continued monitoring licensees performance by conducting a Security Baseline Inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.05Protective Strategy Evaluation and Performance Evaluation Program

The inspectors evaluated the Security Protective Strategy and Performance Evaluation Program. The following elements were evaluated:

Tier I:

All Tier II:

02.05 a; 02.06 a b, c, d, e, f, g, h, i, j, k, l, m Tier III: 02.09 a, b, c; 02.10 a

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. The inspectors verified no proprietary information was retained or documented in this report.

  • On July 24, 2018, the inspectors presented the security inspection results to Mr. Bezilla, and other members of the licensee staff.

DOCUMENTS REVIEWED

71130.05 Protective Strategy Evaluation and Performance Evaluation Program

Davis-Besse Nuclear Power Station Physical Security Plan; Revision 22

NOP-LP-1402; Performance Evaluation Program; Revision 02

NOP-LP-1651; Security Contingency Instructions; Revision 4

NOBP-LP-1112; Training Drills and Exercise Risk Management; Revision 0

NOBP-LP-1114; FENOC Composite Adversary Program; Revision 2

DBBP-LP-1851; Security Protective Strategy; Revision 16

DBBP-LP-1907; Pathway Inspections; Revision 0

C-CSS-099.06-20; Blast Effects Analysis: Safe Standoff Distance for Structures; 06/03/2004

C-CSS-099.06-19; Vehicle Barrier System; Revision 0

Law Enforcement Review Plan; Revision 3

Protective Strategy Manual; Revision 15

CR-2018-06220; 2018 A/B Evaluated Force on Force Exercises Final Roll-up; 07/11/2018

ATA-2018-16046; NRC.05 Inspection - Evaluate Process of Adversaries Throwing Charges;

07/10/2018

ATA-2018-16141; 2018 A/B Annual Force on Force Exercise Improvement Opportunity

(Hot Wash); 07/12/2018

ATA-2018-16143; 2018 A/B Annual Force on Force Exercise Improvement Opportunity

(Drill Itinerary); 07/12/2018

ATA-2018-16139; 2018 A/B Annual Force on Force Exercise Improvement Opportunities;

07/12/2018

ATA-2018-16212; 2018 A/B Annual Force on Force Exercise-Provide Lessons Learned;

07/12/2018