| issue date = 05/15/2007
| issue date = 05/15/2007
| title = IR 05000440-07-404(DRS); 04/23/2007 - 04/27/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection - Cover Letter
| title = IR 05000440-07-404(DRS); 04/23/2007 - 04/27/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection - Cover Letter
| author name = Riemer K R
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Pearce L W
| addressee name = Pearce L
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled. May 15, 2007Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
{{#Wiki_filter:Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled. May 15, 2007Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097SUBJECT:PERRY NUCLEAR POWER PLANTNRC SECURITY BASELINE INSPECTION REPORT 05000440/2007404 (DRS)
 
SUBJECT: PERRY NUCLEAR POWER PLANTNRC SECURITY BASELINE INSPECTION REPORT 05000440/2007404 (DRS)


==Dear Mr. Pearce:==
==Dear Mr. Pearce:==
Line 33: Line 31:
Date of determination: 05/01/2007 Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled.L. Pearce-2-Electronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
Date of determination: 05/01/2007 Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled.L. Pearce-2-Electronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.


Sincerely,/RA by D. Funk acting for/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-440License No. NPF-58
Sincerely,
 
/RA by D. Funk acting for/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-440License No. NPF-58Enclosure:Inspection Report 05000440/2007404(DRS) w/Attachment: Supplemental Informationcc w/encl:Deani Riffle, NSIR/DSO/DDSOOhio State Liaison Officercc w/o encl:J. Hagan, President and Chief Nuclear Officer - FENOCJ. Lash, Senior Vice President of Operations - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio R. Owen, Ohio Department of Health Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolle
===Enclosure:===
Inspection Report 05000440/2007404(DRS)  
 
===w/Attachment:===
Supplemental Informationcc w/encl:Deani Riffle, NSIR/DSO/DDSOOhio State Liaison Officercc w/o encl:J. Hagan, President and Chief Nuclear Officer - FENOCJ. Lash, Senior Vice President of Operations - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio R. Owen, Ohio Department of Health Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolle
}}
}}

Revision as of 23:59, 12 July 2019

IR 05000440-07-404(DRS); 04/23/2007 - 04/27/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection - Cover Letter
ML071380352
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/15/2007
From: Kenneth Riemer
Plant Support Branch II
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-07-404
Download: ML071380352 (5)


Text

Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled. May 15, 2007Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097SUBJECT:PERRY NUCLEAR POWER PLANTNRC SECURITY BASELINE INSPECTION REPORT 05000440/2007404 (DRS)

Dear Mr. Pearce:

On April 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on April 27, 2007, with Mr. B. Allen and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicEXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5 Nuclear Regulatory Commission review required before publicrelease.Joseph Maynen, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 05/01/2007 Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolled.L. Pearce-2-Electronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.

Sincerely,

/RA by D. Funk acting for/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-440License No. NPF-58Enclosure:Inspection Report 05000440/2007404(DRS) w/Attachment: Supplemental Informationcc w/encl:Deani Riffle, NSIR/DSO/DDSOOhio State Liaison Officercc w/o encl:J. Hagan, President and Chief Nuclear Officer - FENOCJ. Lash, Senior Vice President of Operations - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio R. Owen, Ohio Department of Health Enclosure Contains Sensitive UnclassifiedNon-Safeguards Information. Upon separation, this page is decontrolle