IR 05000440/2007501

From kanterella
Jump to navigation Jump to search

Download: ML080520237

Text

February 14, 2008

Mr. Barry Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000440/2007501; NRC SECURITY ANNUAL INSPECTION REPORT NO. 05000440/2007403

Dear Mr. Allen:

On December 31, 2007, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Perry Nuclear Power Plant. This inspection began on January 1, 2007. Issuance of this letter closes Inspection Report Number 2007501. On December 31, 2007, the NRC staff also completed its annual inspection of the Security Program at the Perry Nuclear Power Plant. This inspection began on January 1, 2007. Issuance of this letter closes Inspection Report Number 2007403. Some of the time NRC expended during routine Emergency Preparedness and Security Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Inspection reports are posted on the Reactor Oversight Process (ROP) Web page. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

DISTRIBUTION See next page

Mr. Barry Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000440/2007501; NRC SECURITY ANNUAL INSPECTION REPORT NO. 05000440/2007403

Dear Mr. Allen:

On December 31, 2007, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Perry Nuclear Power Plant. This inspection began on January 1, 2007. Issuance of this letter closes Inspection Report Number 2007501. On December 31, 2007, the NRC staff also completed its annual inspection of the Security Program at the Perry Nuclear Power Plant. This inspection began on January 1, 2007. Issuance of this letter closes Inspection Report Number 2007403. Some of the time NRC expended during routine Emergency Preparedness and Security Program reviews was charged to these report numbers. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Inspection reports are posted on the Reactor Oversight Process (ROP) Web page. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

DISTRIBUTION See next page DOCUMENT NAME: G:\Security & EP Ltrs\PER Security & EP Ltr.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME RJickling:co DF for DFunk EDuncan DATE 02/14/08 02/14/08 02/14/08 OFFICIAL RECORD COPY Letter to Barry from Eric Duncan dated February 14, 2008.

SUBJECT: PERRY NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000440/2007501; NRC SECURITY ANNUAL INSPECTION REPORT NO. 05000440/2007403

cc: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health Letter to Barry from Eric Duncan dated February 14, 2008.

SUBJECT: PERRY NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000440/2007501; NRC SECURITY ANNUAL INSPECTION REPORT NO. 05000440/2007403

cc: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.