IR 05000440/2007402

From kanterella
Jump to navigation Jump to search
IR 05000440-07-402(DRS), on 02/12/2007 - 02/16/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection - Cover Letter
ML070860365
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/23/2007
From: Kenneth Riemer
Plant Support Branch II
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-07-402
Download: ML070860365 (5)


Text

rch 23, 2007

SUBJECT:

PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2007402(DRS)

Dear Mr. Pearce:

On February 16, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 16, 2007, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Enclosure Contains Sensitive Unclassified Nuclear Regulatory Commission review required before public Non-Safeguards Information. Upon release. separation, this page is decontrolled.

Joseph Maynen, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 03/05/2007 Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Enclosure: Inspection Report 05000440/2007402(DRS)

w/Attachment: Supplemental Information cc w/encl: B. Westreich, NSIR/DSO/RSOB M. Layton, NSIR/DSP/MTWSB Licensing Assistant, NSIR/DSO/RSOB Ohio State Liaison Officer Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.