IR 05000440-07-405(DRS); 10/22/2007 - 10/26/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection
ML073470721
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/07/2007
From: Eric Duncan
Plant Support Branch II
To: Allen B
FirstEnergy Nuclear Operating Co
References
IR-07-405
Download: ML073470721 (5)


Text

ber 7, 2007

SUBJECT:

PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2007405(DRS)

Dear Mr. Allen:

On October 26, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 26, 2007, with Mr. and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents two findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. However, because of the very low security significance and because they are entered into your corrective action program, the NRC is treating these violations as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5___________

Nuclear Regulatory Commission review required before Enclosure Contains Safeguards public release. Information. Upon separation, this page is decontrolled.

Joseph Maynen, RIII/DRS/PSB___________

Name and organization of person making determination.

Date of determination: 11/02/2007______ If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Perry Nuclear Power Plant.

The findings were NRC identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-440 License Nos. NPF-58 Nonpublic Enclosure: Inspection Report 05000440/2007405(DRS);

w/Attachment: Supplemental Information ( )

cc w/encl ( ): Enclosure Contains Safeguards D. Riffle (NSIR/DSO/DDSO) Information. Upon separation, this page is Ohio State Liaison Officer decontrolled.