| number = ML101370289
| number = ML101370289
| issue date = 07/06/2010
| issue date = 07/06/2010
| title = Summary of Tele Conf Call Held on 4/23/10, Between the Usnrc and Arizona Public Service, Concerning the Palo Verde Generating Nuclear Station, Units 1, 2, and 3, License Renewal Application
| title = Summary of Tele Conf Call Held on 4/23/10, Between the USNRC and Arizona Public Service, Concerning the Palo Verde Generating Nuclear Station, Units 1, 2, and 3, License Renewal Application
| author name = Regner L M
| author name = Regner L
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
| addressee name =  
| addressee name =  

Revision as of 09:31, 11 July 2019

Summary of Tele Conf Call Held on 4/23/10, Between the USNRC and Arizona Public Service, Concerning the Palo Verde Generating Nuclear Station, Units 1, 2, and 3, License Renewal Application
ML101370289
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/06/2010
From: Lisa Regner
License Renewal Projects Branch 2
To:
Arizona Public Service Co
Ferrer, N B, NRR/DLR, 415-1045
References
TAC ME0254, TAC ME0255, TAC ME0256
Download: ML101370289 (7)


Text

July 6, 2010 LICENSEE: Arizona Public Service Company

FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALLS HELD BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH AGING MANAGEMENT OF THE COMPRESSED AIR SYSTEM RELATED TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255, AND ME0256)

The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held telephone conference calls on April 23, May 17, and June 9, 2010, to discuss the staff's draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains the draft RAI discussed with the applicant, including a brief description on the status of the item.

The applicant had an opportunity to comment on this summary.

/RA/ Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosures:

As stated cc w/encls: See next page

ML101370289 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR

NAME SFigueroa LRegner DWrona LRegner DATE 06/29/10 06/30/10 07/02/10 07/06/10 Memorandum to Arizona Public Service Company from L. Regner dated July 6, 2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALLS HELD BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH AGING MANAGEMENT OF THE COMPRESSED AIR SYSTEM THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255, AND ME0256)

DISTRIBUTION

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource -------------

L. Regner D. Drucker R. Hall B. Mizuno, OGC R. Treadway, RIV G. Pick, RIV

ENCLOSURE 1 TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 23, 2010 MAY 17, 2010 JUNE 9, 2010 PARTICIPANTS AFFILIATIONSLisa Re gner U.S. Nuclear Re gulator y Commission (NRC) Robert Sun NRC

An gela Krainik Arizona Public Service Com p an y (APS) Glenn Michael APS Eric Blocher Strate gic Teamin g and Resource Sharin g (STARS) Alliance

ENCLOSURE 2 DRAFT REQUEST FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION APRIL 23, MAY 17, AND JUNE 9, 2010

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Arizona Public Service Company (APS or the applicant) held telephone conference calls on April 23, May 17, and June 9, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA).

DRAFT RAI B2.1.20-4

Background

In Table 3 of the Generic Aging Lessons Learned (GALL) Report, line items 53 and 54 indicate that steel or stainless steel piping, piping components, and piping elements exposed to condensation should be managed by the Compressed Air Monitoring Program. The Compressed Air Monitoring Program is based, in part, on results of the applicant's response to Generic Letter (GL) 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment. The GL 88-14 recommends, in part, 1) that licensees describe their program for maintaining proper instrument air quality, and 2) that licensees include preventive maintenance that involves air quality checks.

Specifically, the "Monitoring and Trending" element of the GALL Report Compressed Air Monitoring Program, recommends testing to verify proper operation of the compressed air system by comparing measured system performance values with specified performance limits as part of the aging management program (AMP).

The staff reviewed the applicant's response to GL 88-14 dated February 20, 1989, and April 27, 1989, and found that a periodic air quality test was identified and included as a key feature of the "Program for Maintaining Air Quality."

By letter dated December 29, 2009, the NRC issued RAI B2.1.20-3 which requested that the applicant clarify how the aging effects on piping and valves within the compressed air system that are exposed to condensation will be managed for loss of material and other potential aging effects. In its response dated February 19, 2010, the applicant stated that the LRA would be revised to include the wetted environment and that the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program would be credited for managing loss of material aging effects.

Issue The staff evaluated the applicant's response to RAI B2.1.20-3. The applicant has aligned the subject materials and component types to the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program for management of the loss of material aging effects on carbon steel and stainless steel piping components. However, the corrosion products of carbon steel and stainless steel piping components can influence the quality of the compressed air, and the selected AMP does not address the full set of items that are defined in the GALL Report AMP for Compressed Air Monitoring.

Additionally, the staff noted that the "Program for Maintaining Air Quality" has neither been described nor credited in the LRA for conducting air quality checks even though the program was an integral part of the response to GL 88-14.

The applicant's Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program addresses the detection of age-related degradation products on the internal surfaces of system piping and ducting, but does not include air quality testing and quality confirmation as recommended by the GALL Report for the Compressed Air Monitoring Program, and also as described in the applicant's response to GL 88-14.

Request 1. Describe how the air quality considerations are included in the selected AMP for managing the materials, environments, and aging effects as addressed in GL 88-14 and as specified in the GALL Report. 2. Provide information on how the selected AMP conducts preventative maintenance for the compressed air system by comparing measured compressed air system performance values with specified performance limits.

Discussion

following discussion with APS staff, NRC staff agreed to allow the applicant to provide a supplemental response to RAI B2.1.20-3 (Feb. 9, 2010, ML100610604) addressing the above concern.

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 cc: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ 85040 Mr. Ron Barnes, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. John C. Taylor, Director, Nuclear Generation El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Highway, Bldg. D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100

Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326

Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Station 7602 Phoenix, AZ 85072-2034