Issue date | Title | Topic | |
---|---|---|---|
ML24011A100 | 10 January 2024 | March 2024 Emergency Preparedness Program Inspection - Request for Information | |
ML23334A161 | 30 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue | Aging Management License Renewal |
ML23334A007 | 29 November 2023 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating | |
ML23298A123 | 25 October 2023 | NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle | |
ML23031A339 | 31 January 2023 | In-service Inspection Request for Information | Boric Acid Nondestructive Examination Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
ML23013A063 | 13 January 2023 | NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML22348A167 | 14 December 2022 | March 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML22339A237 | 5 December 2022 | NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing | |
ML22272A325 | 29 September 2022 | Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information | |
ML22209A175 | 28 July 2022 | Inservice Inspection Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML22187A263 | 6 July 2022 | Notification of Inspection (NRC IR 05000528/2022004, 05000529/2022004 and 05000530/2022004) and Request for Information | |
ML22067A229 | 2 March 2022 | Inservice Inspection Inspection PWR Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML22055A584 | 24 February 2022 | NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report | |
ML22035A330 | 10 February 2022 | Requests for Confirmation of Information for Exemption to Delete Diverse Auxiliary Feedwater Actuation System Based on Risk-Informed Process for Evaluations | Exemption Request |
ML22025A401 | 3 January 2022 | March 2022 Emergency Preparedness Program Inspection - Request for Information | |
ML21245A222 | 1 September 2021 | Request for Information | Boric Acid Nondestructive Examination Scaffolding |
ML21200A239 | 20 July 2021 | Docs Request AC - AA August 2021 | |
ML21154A008 | 26 May 2021 | NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) | Incorporated by reference |
ML21064A237 | 3 March 2021 | ISI Request for Information Rls | Boric Acid Nondestructive Examination Pandemic Scaffolding |
ML21042B969 | 18 February 2021 | Notification of NRC Design Bases Assurance Inspection and Initial Request for Information | Stroke time Power-Operated Valves |
ML21043A146 | 11 February 2021 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc | |
ML21023A021 | 13 January 2021 | PVNGS PI&R Request for Information RA | Temporary Modification Pandemic |
ML21011A197 | 12 January 2021 | Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Pandemic Fire Protection Program |
ML20227A099 | 14 August 2020 | Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information | |
ML20118D136 | 28 April 2020 | Licensed Operator Positive Fitness-For-Duty Test Request for Additional Information | |
ML20049A099 | 14 February 2020 | Notification of Cyber Security Inspection (NRC Inspection Report 05000528/2020401; 05000529/2020401; and 05000530/2020401) and Request for Information | Cyber Security |
ML20049A025 | 12 February 2020 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for License Amendment Request Associated with Changes to Emergency Plan Staffing Requirements | Minimum staff |
ML20021A317 | 21 January 2020 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 1 - Official RAIs for Relief Request 64, Impractical Examinations for the Third 10-Year ISI Interval | |
ML19317D078 | 13 November 2019 | NRR E-mail Capture - Palo Verde 1 - Requests for Additional Information on Unit 1 21st Refueling Outage Steam Generator Tube Inspection Report | |
ML19234A320 | 29 August 2019 | Redacted - Request for Additional Information for Amendment and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel (EPID L-2018-LLA-0194; EPID L-2018-LLE-0010) | Loop seal Anticipated operational occurrence Exemption Request Earthquake |
ML19155A184 | 30 May 2019 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mvib Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval | |
ML19095A655 | 4 April 2019 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Unit 3 - Mphb Official RAIs for RR-63, Impractical Examinations for the Third 10-Year ISI Interval | |
ML19044A734 | 13 February 2019 | NRR E-mail Capture - Palo Verde1, 2, and 3 - Official Requests for Additional Information for RR 62, Third and Fourth 10-Year ISI Intervals, Proposed Alternative - Pressurizer Heat Sleeve Repairs | |
ML19008A361 | 8 January 2019 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR Associated with Response Time Testing of Pressure Transmitters | |
ML18341A025 | 3 December 2018 | Notification of NRC Design Bases Assurance Inspection (Teams)(05000528/2019011, 05000529/2019011, and 05000530/2019011) and Initial Request for Information | Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Large early release frequency |
ML18271A039 | 2 October 2018 | Non Proprietary - Supplemental Information Needed for Acceptance of Requested License Amendments and Exemptions Implementation of Framatome High Thermal Performance Fuel (Epids L-2018-LLA-0194 and L-2018-LLE-0010) | Exemption Request |
ML18221A510 | 23 August 2018 | Request for Additional Information License Amendment Request to Adopt Risk-Informed Completion Times (CAC Nos. MF6576, MF6577, and MF6578; EPID: L-2015-LLA-0001) | |
ML18229A313 | 17 August 2018 | NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 - Second Se | |
ML18227A867 | 15 August 2018 | NRR E-mail Capture - Request for Additional Information Relief Request 58: Impractical Examinations for the Third 10-Year Inservice Inspection Interval Arizona Public Service Company Palo Verde Nuclear Generation Station, Unit 2 | |
ML18124A011 | 3 May 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official Eeob RAIs for TSTF-505 (4b) LAR (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) | Anticipated operational occurrence Probabilistic Risk Assessment |
ML18099A007 | 6 April 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for 10 CFR 50.69 LAR (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) | High winds Internal Flooding Probabilistic Risk Assessment Tornado Missile Protection Large early release frequency Risk-Informed Steering Committee Earthquake |
ML18094B112 | 4 April 2018 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAIs for TSTF-505 (Initiative 4b) LAR (CAC Nos. MF6576, MF6577, and MF6578: EPID L-2015-LLA-0001) | Safe Shutdown Ultimate heat sink Fire Barrier Internal Flooding Probabilistic Risk Assessment |
ML18066A703 | 7 March 2018 | Notification of Nrc Design Bases Assurance Inspection (Programs) 05000528/2018011, 05000529/2018011, and 05000530/2018011 Initial Request for Information | Commercial Grade Dedication |
ML17248A016 | 31 August 2017 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Final RAI for RRs PRR-03, PRR-04 and PRR-05, Pump Testing | |
ML17107A005 | 14 April 2017 | NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) | Boric Acid |
ML17082A446 | 28 March 2017 | PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 | Boric Acid |
ML17003A018 | 2 January 2017 | NRR E-mail Capture - Palo Verde, Unit 3 - Draft RAIs for the Second Emergency LAR Associated with EDG 3B Failure | Probabilistic Risk Assessment Arc flash FLEX Job Performance Measure Continuous fire watch Fire Watch |
ML16258A031 | 14 September 2016 | PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) and | Safe Shutdown Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
ML16111B331 | 20 April 2016 | Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for Information | Probabilistic Risk Assessment Temporary Modification |
ML16083A250 | 23 March 2016 | NRR E-mail Capture - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Official RAIs for EAL LAR | High winds Reactor Vessel Water Level Ultimate heat sink |