Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3
ML23258A140
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/27/2023
From: Siva Lingam
Plant Licensing Branch IV
To: Heflin A
Arizona Public Service Co
Lingam S, 301-415-1564
References
EPID L-2023-LRM-0065
Download: ML23258A140 (1)


Text

September 27, 2023 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF AUGUST 31, 2023, PRESUBMITTAL MEETING WITH ARIZONA PUBLIC SERVICE COMPANY TO DISCUSS PLANNED SUBMITTAL OF A LICENSE RENEWAL COMMITMENT REGARDING ALLOY 600 MANAGEMENT PROGRAM PLAN AT PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (EPID L-2023-LRM-0065)

On August 31, 2023, an Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Arizona Public Service Company (the licensee) via webinar. The purpose of this meeting was to discuss the licensees planned submittal of a license renewal commitment regarding Alloy 600 management program plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). The meeting notice and agenda, dated August 18, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23230A061. A list of attendees is provided in the enclosure.

The licensee presented informational slides at the meeting, which are available in ADAMS at Accession No. ML23240A323. The licensee committed to develop an inspection plan for Alloy 600 management for the period of extended operation at Palo Verde (Commitment No. 23, item A, table 19.5-1, License Renewal Commitments, Sheet 11 of 25 of the Updated Final Safety Analysis Report, Revision 22 (ML23181A166)).

The licensees presentation included an overview to maintain the plant safety and minimize the impact of primary water stress corrosion cracking on plant availability. The licensee provided Alloy 600 locations for reactor pressure vessels, pressurizers, reactor coolant system piping, and steam generators at Palo Verde. The licensee plans to submit the Alloy 600 management program plan by September 2023.

No members of the public called into the meeting. No regulatory decisions or commitments were made at the meeting. Additionally, the NRC staff did not receive Public Meeting Feedback forms.

Please direct any inquiries to me at 301-415-1564 or by email to Siva.Lingam@nrc.gov.

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch IV Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES AUGUST 31, 2023, PRESUBMITTAL WEBINAR REGARDING A PLANNED SUBMITTAL OF A LICENSE RENEWAL COMMITMENT REGARDING ALLOY 600 MANAGEMENT PROGRAM PLAN ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 U.S. Nuclear Regulatory Commission Stephen Cumblidge Varoujan Kalikian Siva Lingam Seung Min John Tsao Arizona Public Service Company (APS)

Boris Bolf Winston Borrero (Senior Consulting Engineer)

William Boyd Matthew Cox Nicholas Doyle Matthew Glenn Maria Groshner Sarah Kane Nicholas Morgan Carl Stephenson David Van Allen (Consulting Engineer)

Enercon Angela Krainik (Consultant to APS)

Structural Integrity Associates, Inc.

Jim Axline (Consultant to APS)

Enclosure

ML23258A144 (Package)

ML23230A061 (Meeting Notice)

ML23240A323 (Public Meeting Slides)

ML23258A140 (Meeting Summary) *by email OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DNRL/NPHP/BC (A)*

NAME SLingam PBlechman SCumblidge DATE 9/15/2023 9/18/2023 9/27/2023 OFFICE NRR/DEX/NVIB/BC* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*

NAME ABuford JDixon-Herrity (WOrders for) SLingam DATE 9/25/2023 9/27/2023 9/27/2023