IR 05000348/2011408: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/04/2012
| issue date = 01/04/2012
| title = IR 05000348-11-408 and 05000364-11-408, on 11/15/2011, Joseph M Farley Nuclear Plant, NRC Special Security Inspection Report. (Letter)
| title = IR 05000348-11-408 and 05000364-11-408, on 11/15/2011, Joseph M Farley Nuclear Plant, NRC Special Security Inspection Report. (Letter)
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Lynch T A
| addressee name = Lynch T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. January 4, 2012 Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant Farley Nuclear Plant P.O. Drawer 470 BIN B500 Ashford, AL 36312
{{#Wiki_filter:January 4, 2012


SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - NRC SPECIAL SECURITY INSPECTION REPORT 05000348/2011408 AND 05000364/2011408
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT - NRC SPECIAL SECURITY INSPECTION REPORT 05000348/2011408 AND 05000364/2011408


==Dear Mr.Lynch:==
==Dear Mr.Lynch:==
Line 28: Line 29:
=s enclosure will not be available for public inspection.
=s enclosure will not be available for public inspection.


Sincerely,/RA/ Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8  
Sincerely,
/RA/ Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8  


===Enclosure:===
Enclosure: Inspection Report 05000348/2011408 and 05000364/2011408 w/Attachment Supplemental Information (OUO) cc w/encl.: (See page 3)  
Inspection Report 05000348/2011408 and 05000364/2011408 w/Attachment Supplemental Information (OUO) cc w/encl.: (See page 3)  


ML120050566 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRP RII:DRS SIGNATURE R A R A R A R A R A NAME I. HALL T.C. SU J. HAMMAN J. HICKEY B. DESAI DATE 01/04/2012 01/04/2012 01/04/2012 01/04/2012 01/04/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl.:  
ML120050566 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRP RII:DRS SIGNATURE R A R A R A R A R A NAME I. HALL T.C. SU J. HAMMAN J. HICKEY B. DESAI DATE 01/04/2012 01/04/2012 01/04/2012 01/04/2012 01/04/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl.:  

Revision as of 06:04, 29 June 2019

IR 05000348-11-408 and 05000364-11-408, on 11/15/2011, Joseph M Farley Nuclear Plant, NRC Special Security Inspection Report. (Letter)
ML120050566
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/04/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Lynch T
Southern Nuclear Operating Co
References
IR-11-408
Download: ML120050566 (4)


Text

January 4, 2012

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NRC SPECIAL SECURITY INSPECTION REPORT 05000348/2011408 AND 05000364/2011408

Dear Mr.Lynch:

The enclosed inspection report documents the results of a Special Inspection Team (SIT) that was conducted by the NRC to review the circumstances surrounding the issues affecting the Plant Security Computer System (PSCS) that occurred at your Joseph M. Farley Nuclear Plant, Units 1 and 2 on November 15, 2011. The inspections results were discussed preliminarily on November 18, 2001 and finally on December 21, 2011, via telephone, with Mr. T. Lynch and other members of the Farley Nuclear Plant staff. The SIT was warranted based on the risk and the deterministic criteria specified in Management Directive 8.3, "NRC Incident Investigation Program." The determination to conduct the SIT was made by the NRC on November 15, 2011, and the inspection started on November 16, 2011. The onsite portion of the SIT was completed on November 18, 2011, followed by the in-office reviews that were completed on December 21, 2011. The inspection was performed in accordance with Inspection Procedure 93812, "Special Inspection," and focused on the areas discussed in the inspection charter that is described in the report. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The team reviewed selected procedures and records, conducted field walk downs, observed licensee activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is SNC 2 accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

Sincerely,

/RA/ Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8

Enclosure: Inspection Report 05000348/2011408 and 05000364/2011408 w/Attachment Supplemental Information (OUO) cc w/encl.: (See page 3)

ML120050566 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP RII:DRP RII:DRS SIGNATURE R A R A R A R A R A NAME I. HALL T.C. SU J. HAMMAN J. HICKEY B. DESAI DATE 01/04/2012 01/04/2012 01/04/2012 01/04/2012 01/04/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl.:

Keith Wooten Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc. 40 Iverness Center Parkway Birmingham, AL 35242 David Burford Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc. 40 Iverness Center Parkway Birmingham, AL 35242 L. B. Hogg Nuclear Licensing Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Birmingham, AL 35242 S. P. McGavin Security Manager Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319