ML23346A222
| ML23346A222 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/22/2023 |
| From: | John Lamb NRC/NRR/DORL/LPL2-1 |
| To: | Coleman J Southern Nuclear Operating Co |
| Turner Z, NRR/DORL/LPL2-1 | |
| Shared Package | |
| ML23346A219 | List: |
| References | |
| Download: ML23346A222 (1) | |
Text
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE December 22, 2023 Ms. Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Company 3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - TRANSMITTAL OF DAM INSPECTION REPORT
Dear Ms. Coleman:
Enclosed is a copy of the Dam Safety Inspection Report prepared by the U.S. Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission (NRC). This report contains the results of an inspection conducted on June 23, 2023, of the Cooling Water Storage Pond (CWSP) Dam at the Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley).
Based on observations made during field inspection, review of data submitted by the owner, and discussions with the NRC staff and licensee representatives, FERC found that the Farley CWSP Dam embankment and appurtenances were in satisfactory condition and adequately maintained for service, stability, and longevity.
The information in the enclosed report is considered Critical Energy Infrastructure Information (CEII). Thus, the Enclosure is considered official use only and is being withheld from public disclosure.
The enclosure transmitted with here contains Critical Energy Infrastructure Information.
When separated from the enclosure, this transmittal document is DECONTROLLED.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE If you have any questions, please contact me at (301) 415-3100 or by email at John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364
Enclosure:
FERC Dam Safety Inspection Report (Non-Public) cc without enclosure: Listserv
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE ENCLOSURE FERC DAM SAFETY INSPECTION REPORT JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE OFFICIAL USE ONLY - SECURITY RELATED INFORMATION CEII - DO NOT RELEASE
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - TRANSMITTAL OF DAM INSPECTION REPORT DECEMBER 22, 2023 DISTRIBUTION:
PUBLIC RidsNrrPMFarley Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrLAKGoldstein Resource RidsNrrDorlLpl2-1 Resource RidsNrrDorl Resource FVega, NRR RRivera, NRR KSee, NRR ADAMS Accession Nos.:
Package: ML23346A219 Transmittal Letter: ML23346A234 (Non-Public)
Redacted Transmittal Letter: ML23346A222 (Public)
FERC Security-Related Report: ML23346A224 (Non-Public)
NRR-106 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NAME ZTurner JLamb KGoldstein DATE 12/14/2023 12/17/2023 12/14/2023 OFFICE NRR/DEX/EXHB/DSO NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME KSee MMarkley (SWilliams for)
JLamb DATE 12/18/2023 12/22/2023 12/22/2023 OFFICIAL AGENCY RECORD