December 23, 2020

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000348/2020403 AND 05000364/2020403

Dear Mr. McGavin:

On December 4, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant, Units 1 and 2. On December 8, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Ivan Hall, Chief (acting)

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000348 and 05000364

License Numbers:

NPF-2 and NPF-8

Report Numbers:

05000348/2020403 and 05000364/2020403

Enterprise Identifier: I-2020-403-0030

Licensee:

Southern Nuclear Operating Co. Inc.

Facility:

Joseph M. Farley Nuclear Plant, Units 1 and 2

Location:

Ashford AL

Inspection Dates:

September 14 -18, 2020 (On-site)

November 30, - December 04, 2020 (Remote)

Inspectors:

J. Brown, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

James C. Shehee, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Joseph M. Farley Nuclear Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and onsite inspection.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 1 Requirement (02.09)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01)

(1) Since the last NRC inspection of this program area, Security Plan Revision 18-FNP-1 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

The inspectors verified licensee performance indicators submittals listed below:

(1)

(Aug 2019 - Aug 2020)

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

92702 CONF - Enforcement Related Order Follow-Up-Only

Farley Inspection Report 05000348/2020402 and 05000364/2020402 issued on March 20, 2020, verified that the Confirmatory Order, EA-18-032, requirements described in Section V.1.a through V.1.l were implemented in accordance with the Confirmatory Order. During this inspection, the Inspector identified one remaining requirement at Section V.1.m which would need to be reviewed during a future inspection due to the scheduled completion date.

Enforcement Related Order Follow-Up-Only

(1) Confirmatory Order (EA-18-032) requirement V.1.m required an Effectiveness review after 18 months and was completed by the licensee on August 13, 2020. SNC provided the Effectiveness review to the NRC on September 10, 2020. The inspector reviewed the report and verified the Effectiveness review met the requirements outlined in the Confirmatory Order. The licensees implementation of Confirmatory Order requirement V.1.m. completes all requirements of the Confirmatory Order.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 8, 2020, the inspectors presented the security baseline inspection results to Delson Erb and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

10689241

Security Sally Port Wedges not working per design

2/21/2020

Corrective Action

Documents

Resulting from

Inspection

10739680

Security NRC Issue of Concern

09/17/2020

Miscellaneous

10714070,

10714166,

10715065,

10717342,

10711043

Various CR Documents

Procedures

FNP-0-SP-10.0

Patrol Procedures

VERSION

34.1

FNP-0-SP-9.0

Lock and Key Control Procedures

VERSION

20.3

NMP-SE-021

Security Search Processes

VERSION

8.0

NMP-SE-023

Personnel Authorization and Badging Program

VERSION

3.2

71130.09

Miscellaneous

Security Plan Changes

Version

number-18-

FNP-1

71151

Procedures

NMP-AD-029

Preparation and Reporting of Regulatory Assessment

Performance Indicator Data and the Monthly

Operating Report

VERSION

2.0

2702

CONF

Self-Assessments 1036824

Effectiveness Review Technical Evaluation

08/13/2020