ML21347A442

From kanterella
Jump to navigation Jump to search
Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000348/2022401; 05000364/2022401
ML21347A442
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/13/2021
From: Schaeffer S
NRC/RGN-II
To: Kharrl C
Southern Nuclear Operating Co
References
IR 2022401
Download: ML21347A442 (11)


See also: IR 05000348/2022401

Text

December 13, 2021

Charles Kharrl

Southern Nuclear Operating Co., Inc.

Joseph M. Farley Nuclear Plant

7388 North State Highway 95

Columbia, AL 36319-0470

SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-

SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION

05000348/2022401; 05000364/2022401

Dear Mr. Kharrl:

On March 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in

accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0 at your Farley Nuclear

Plant. The inspection will be performed to evaluate and verify your ability to provide assurance that

your digital computer and communication systems and networks associated with safety, security, or

emergency preparedness (SSEP) functions are adequately protected against cyber-attacks in accordance

with Title 10 of the Code of Federal Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory

Commission (NRC) approved cyber security plan (CSP). The onsite portion of the inspection will take

place during the week of March 21, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for documents needed for the

inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas

(i.e., sample set) to be inspected by the cyber-security IP. This information should be made available

electronically no later than January 14, 2022. The inspection team will review this information and, by

January 28, 2022, will request the specific items that should be provided for review. The second group

of additional requested documents will assist the inspection team in the evaluation of the critical

systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees CSP

selected for the cyber-security inspection. This information will be requested for review in the regional

office prior to the inspection by February 25, 2022, as identified above.

C. Kharrl -2-

The third group of requested documents consists of those items that the inspection team will review, or

need access to, during the inspection. Please have this information available by the first day of the

onsite inspection, March 21, 2022.

The fourth group of information is necessary to aid the inspection team in tracking issues identified as a

result of the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are up to

date and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is William Monk. We understand that our regulatory contact for

this inspection is Gene Surber, Licensing Manager of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at (404) 997-4579 or via e-

mail at william.monk@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the

NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Scott Shaeffer, Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-348; 50-364

License Nos. NPF-2; NPF-8

Enclosure:

Farley Nuclear Plant Cyber-Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000348/2022401; 05000364/2022401

Inspection Dates: March 21 - 25, 2022

Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)

Reference: Guidance Document for Development of the Request for Information

(RFI) and Notification Letter for Full-Implementation of the Cyber-

Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors: William Monk, Lead Melana Singletary

404-909-4579 404-997-4752

william.monk@nrc.gov melana.singletary@nrc.gov

NRC Contractors: Tim Marshall Alexander Prada

301-415-7000 301-415-7000

timothy.marshall@nrc.gov alexander.prada@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team

with the general information necessary to select appropriate components and CSP elements to

develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control

portions of the CSP to be chosen as the sample set required to be inspected by the cyber-

security IP. The first RFIs requested information is specified below in Table RFI #1. The

Table RFI #1 information is requested to be provided to the regional office by January 14, 2022,

or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite

inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI. The inspection team will submit the specific

systems and equipment list to your staff by January 28, 2022, which will identify the specific

systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,

and the areas of the licensees CSP selected for the cyber-security inspection. We request that

the additional information provided from the second RFI be made available to the regional

office prior to the inspection by February 25, 2022. All requests for information shall follow the

guidance document U.S. NRC - Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full Implementation of the Cyber-Security

Inspection, referenced above.

Enclosure

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The required Table RFI 1 information shall be provided electronically to the lead inspector by

January 14, 2022. The preferred file format for all lists is a searchable Excel spreadsheet file.

The information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Paragraph Number/Title: IP Ref

A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new guidance

1 Overall

from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber

security inspection.

2 A list of EP and Security onsite and offsite digital communication systems. Overall

Network Topology Diagrams to include information and data flow for critical

3 Overall

systems in levels 2, 3, and 4 (If available).

4 Ongoing Monitoring and Assessment program documentation. 03.01(a)

5 The most recent effectiveness analysis of the Cyber Security Program. 03.01(b)

6 Vulnerability screening/assessment and scan program documentation. 03.01(c)

Cyber Security Incident Response documentation, including incident

03.02(a)

detection, response, and recovery documentation as well as contingency plan

7 and

development, implementation, and including any program documentation

03.04(b)

that requires testing of security boundary device functionality.

8 Device Access and Key Control documentation. 03.02(c)

9 Password/Authenticator documentation. 03.02(c)

10 User Account/Credential and Authentication documentation. 03.02(d)

Portable Media and Mobile Device control documentation, including kiosk

11 03.02(e)

security control assessment/documentation.

Design change/ modification program documentation and a list of all design

12 changes completed since the last cyber security inspection, including either a 03.03(a)

summary of the design change or the 50.59 documentation for the change.

Supply Chain Management documentation including any security impact 03.03(a),

13

analysis for new acquisitions. (b) and (c)

Configuration Management documentation including any security impact

03.03(a)

14 analysis performed due to configuration changes since the last cyber

and (b)

inspection.

5

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Paragraph Number/Title: IP Ref

Cyber Security Plan and any 50.54(p) analysis to support changes to the plan

15 03.04(a)

since the last inspection.

16 Cyber Security Performance Metrics tracked (if applicable). 03.06(b)

Provide documentation describing any cyber security changes to the access

17 Overall

authorization program since the last cyber security inspection.

Provide a list of all procedures and policies provided to the NRC with their

18 Overall

descriptive name and associated number (if available).

19 Performance testing report (if applicable). 03.06(a)

In addition to the above information, please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of

specific systems and equipment to your staff by January 28, 2022 for the second RFI

(i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your staff

by January 28, 2022 for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cyber-security inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document referenced above.

The Table RFI 2 information shall be provided to the lead inspector by February 25, 2022. The

preferred file format for all lists is a searchable Excel spreadsheet. The information should be

indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

6

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s). 03.01(a)

2 All Security Control Assessments for the selected system(s). 03.01(a)

All vulnerability screenings/assessments associated with or scans

3 performed on the selected system(s) since the last cyber security 03.01(c)

inspection.

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

4 03.02(b)

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection).

Documentation (including configuration files and rule sets) for intra-

5 security level firewalls and boundary devices used to protect the selected 03.02(c)

system(s).

Copies of all periodic reviews of the access authorization list for the

6 03.02(d)

selected systems since the last cyber inspection.

7 Baseline configuration data sheets for the selected CDAs. 03.03(a)

Documentation on any changes, including Security Impact Analyses,

8 03.03(b)

performed on the selected system(s) since the last inspection.

Copies of the purchase order documentation for any new equipment

9 03.03(c)

purchased for the selected systems since the last inspection.

Copies of any reports/assessment for cyber security drills performed since 03.02(a)

10

the last inspection. 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)

11

documentation of the results the last time the backups were executed. 03.04(b)

Corrective actions taken as a result of cyber security incidents/issues to

12 include previous NRC violations and Licensee Identified Violations since 03.05

the last cyber security inspection.

7

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table Week Onsite) to the team by March 21, 2022, the first day of the inspection. All

requested information shall follow the guidance document referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table Week Onsite

Paragraph Number/Title: Items

Any cyber security event reports submitted in accordance with 10 CFR

1 03.04(a)

73.77 since the last cyber security inspection.

Updated copies of corrective actions taken as a result of cyber security

incidents/issues, to include previous NRC violations and Licensee

2 03.05

Identified Violations since the last cyber security inspection, as well as

vulnerability-related corrective actions.

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report (UFSAR), if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report; and

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective

actions) generate as a result of the most recent Cyber-Security Quality Assurance

(QA) audit and/or self-assessment.

IV. Information Requested to Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

8

FARLEY NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team

leader.

9

ML21347A442

X NON- Sensitive X Publicly Available

SUNSI Review

Sensitive Non-Publicly

Available

OFFICE RII/DRS RII/DRS RII/DRS

NAME W. Monk M. Singletary S. Shaeffer

DATE 12/07/2021 12/ 07 /2021 12/ 09/2021