IR 05000348/2022401

From kanterella
Jump to navigation Jump to search
Cyber Security Inspection Report 05000348/2022401 and 05000364/2022401
ML22126A173
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/06/2022
From: Gerald Mccoy
Division of Reactor Safety II
To: Erb D
Southern Nuclear Operating Co
References
IR 2022401
Download: ML22126A173 (3)


Text

May 6, 2022

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 & 2 - CYBER SECURITY INSPECTION REPORT 05000348/2022401 AND 05000364/2022401

Dear Mr. Erb:

On March 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant, Units 1 & 2. On March 24, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

Licensee-identified violations (LIVs) which were determined to be of very low security significance are documented in the Enclosure of this report. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Joseph M. Farley Nuclear Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available, in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response, in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Gerald J. McCoy, Branch Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8

Enclosure:

As stated

cc w/o encl: Distribution via LISTSERV

cc:

Matthew Grantham Site Security Manager Southern Nuclear Operating Co., Inc.

Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319-0470

Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243

ML22126A173 (Cover letter)

Cover Letter Only:

X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE:

RII/DRS RII/DRS RII/DRS NSIR/CSB RII/DRP

NAME:

G. McCoy W. Monk M. Singletary J. Jauntirans A. Blamey

DATE:

05/06/2022 05/04/2022 05/03/2022 05/04/2022 05/04/2022