September 15, 2021
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000348/2021402 AND 05000364/2021402
Dear Mr. McGavin:
On August 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant, Units 1 & 2. On August 16, 2021, the NRC inspectors discussed the results of this inspection with Mr. Chuck Kharrl and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000348 and 05000364
License Numbers:
Report Numbers:
05000348/2021402 and 05000364/2021402
Enterprise Identifier: I-2021-402-0018
Licensee:
Southern Nuclear Operating Co. Inc.
Facility:
Joseph M. Farley Nuclear Plant, Units 1 & 2
Location:
Ashford, AL
Inspection Dates:
August 09, 2021 to August 13, 2021
Inspectors:
R. Patterson, Physical Security Inspector
A. Richardson, Physical Security Inspector
J. Wallo, Senior Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Joseph M. Farley Nuclear Plant,
Units 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: (02.06 a - d, 02.07 a, 02.08 a, b, e)
- Tier III: (02.09)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)
- Tier III: (02.08, 02.09 a, b, 02.11 a)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) Since the last NRC inspection of this program area, Security Plan Revision(s) Version 18 to Version 18 FNP-1 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) Unit 1 August 2020 through August 2021 Unit 2 August 2020 through August
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 16, 2021, the inspectors presented the security baseline inspection results to Mr. Chuck Kharrl and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
FNP-0-SP-9.0
Lock and Key Control
Version 20.3
NMP-SE-021
Security Search Process
Version 9.0
NMP-SE-023
Personnel Authorization and Badging
Version 4.0
Corrective Action
Documents
20-1071156
20-10739688
20-10757568
21-10815987
Miscellaneous
FNP-O-SP-10.0-
F02
Foot Patrol Checklist
December
15, 2020
FNP-O-SP-10.0-
F02
Foot Patrol Checklist
February 15,
21
FNP-O-SP-10.0-
F02
Foot Patrol Checklist
May 30,
21
FNP-O-SP-10.0-
F02
Foot Patrol Checklist
July 4, 2021
FNP-O-SP-10.0-
F02
Foot Patrol Checklist
August 7,
21
Procedures
NMP-SE-006
Security Drill and Exercise Program
Version 7
NMP-SE-008
Use of Force
Version 4.2
NMP-SE-012
Safety/Security Interface
Version 5
Miscellaneous
Farley Physical Security Plan
Version 18
FNP-1
Farley Physical Security Plan
Version 18
Corrective Action
Documents
10701326
10714166
10721588
10741780