September 15, 2021

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000348/2021402 AND 05000364/2021402

Dear Mr. McGavin:

On August 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant, Units 1 & 2. On August 16, 2021, the NRC inspectors discussed the results of this inspection with Mr. Chuck Kharrl and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000348 and 05000364

License Numbers:

NPF-2 and NPF-8

Report Numbers:

05000348/2021402 and 05000364/2021402

Enterprise Identifier: I-2021-402-0018

Licensee:

Southern Nuclear Operating Co. Inc.

Facility:

Joseph M. Farley Nuclear Plant, Units 1 & 2

Location:

Ashford, AL

Inspection Dates:

August 09, 2021 to August 13, 2021

Inspectors:

R. Patterson, Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Joseph M. Farley Nuclear Plant,

Units 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: (02.06 a - d, 02.07 a, 02.08 a, b, e)
  • Tier III: (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a, 02.06 a, d, e, f, g, h, i, j, k, l, m, n, 02.07 a, b, c, e)
  • Tier III: (02.08, 02.09 a, b, 02.11 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision(s) Version 18 to Version 18 FNP-1 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1 August 2020 through August 2021 Unit 2 August 2020 through August

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 16, 2021, the inspectors presented the security baseline inspection results to Mr. Chuck Kharrl and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

FNP-0-SP-9.0

Lock and Key Control

Version 20.3

NMP-SE-021

Security Search Process

Version 9.0

NMP-SE-023

Personnel Authorization and Badging

Version 4.0

71130.05

Corrective Action

Documents

20-1071156

20-10739688

20-10757568

21-10815987

Miscellaneous

FNP-O-SP-10.0-

F02

Foot Patrol Checklist

December

15, 2020

FNP-O-SP-10.0-

F02

Foot Patrol Checklist

February 15,

21

FNP-O-SP-10.0-

F02

Foot Patrol Checklist

May 30,

21

FNP-O-SP-10.0-

F02

Foot Patrol Checklist

July 4, 2021

FNP-O-SP-10.0-

F02

Foot Patrol Checklist

August 7,

21

Procedures

NMP-SE-006

Security Drill and Exercise Program

Version 7

NMP-SE-008

Use of Force

Version 4.2

NMP-SE-012

Safety/Security Interface

Version 5

71130.09

Miscellaneous

Farley Physical Security Plan

Version 18

FNP-1

Farley Physical Security Plan

Version 18

Corrective Action

Documents

10701326

10714166

10721588

10741780