Correction to Issuance of Amendment Nos. 241, 242, 243, and 244
ML23240A001
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/30/2023
From: John Lamb
Plant Licensing Branch II
To: Coleman J
Southern Nuclear Operating Co
Devlin-Gill, Stephanie
References
Download: ML23240A001 (1)


Text

August 30, 2023 Ms. Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244

Dear Ms. Coleman:

On October 9, 2020 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML20121A283), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 227 to Renewed Facility Operating License (RFOL) No. NPF-8 for the Joseph M. Farley Nuclear Plant (Farley), Unit 2, authorizing the revision of the RFOL paragraph 2.C(1) "Maximum Power Level" and associated Technical Specifications (TSs) to implement an increase in the maximum licensed Rated Thermal Power (RTP) from 2,775 megawatts thermal (MWt) to 2,821 MWt.

On August 25, 2023, the licensee informed NRC of an administrative error on the license page No. 3 to RFOL No. NPF-8 for Farley, Unit 2, concerning Amendment Nos. 241, 242, 243, and 244 dated November 8, 2022, March 16, July 3, and August 24, 2023, respectively (ML22308A059, ML23054A455, ML23136B154, and ML23235A296). The NRC stated incorrectly that the maximum licensed RTP for Farley, Unit 2, was 2,775 MWt (i.e., the pre-power uprate authorized limit), when the correct Farley, Unit 2, maximum licensed RTP is 2,821 MWt, as authorized by Amendment No. 227.

The NRC staff has determined that these errors were administrative in nature and has corrected the errors. The corrections do not change any of the conclusions associated with the issuance of Amendment Nos. 241, 242, 243, and 244 to RFOL Nos. NPF-8 for Farley, Unit 2, and do not affect the proposed finding that the amendments involve no significant hazards consideration published in the Federal Register on February 22, 2022 (87 FR 9652), February 22, 2022 (87 FR 9652), and December 6, 2022 (87 FR 74669), for Amendment Nos. 241, 242, and 243, respectively. Amendment No. 244 was an emergency amendment with the no significant hazards consideration contained in Amendment No. 244. This correction does not affect the no significant hazards consideration contained in Amendment No. 244.

Accordingly, Enclosures 1, 2, 3, and 4 to this letter provide corrected pages for Amendment Nos. 241, 242, 243, and 244, respectively, to RFOL No. NPF-8 for Farley, Unit 2.

J. Coleman Consistent with NRC staff guidance dated January 16, 1997 (ADAMS Accession No. ML103260096), based on the NRCs policy established by SECY-96-238, these errors can be corrected by a letter to the licensee from the NRC staff.

If you have any questions, please contact me at 301-415-3100, or via e-mail at John.Lamb@nrc.gov.

Sincerely,

/RA/

John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-364

Enclosure:

1. Corrected Page for Amendment No. 241 to NPF-8
2. Corrected Page for Amendment No. 242 to NPF-8
3. Corrected Page for Amendment No. 243 to NPF-8
4. Corrected Page for Amendment No. 244 to NPF-8 cc: Listserv

ENCLOSURE 1 CORRECTED PAGE FOR AMENDMENT NO. 241 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364

(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.

(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 241, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 241

ENCLOSURE 2 CORRECTED PAGE FOR AMENDMENT NO. 242 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364

(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.

(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 242, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 242

ENCLOSURE 3 CORRECTED PAGE FOR AMENDMENT NO. 243 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364

(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.

(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 243

ENCLOSURE 4 CORRECTED PAGE FOR AMENDMENT NO. 244 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.

ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364

(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.

(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 244, are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications.

(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 244

J. Coleman

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244 DATED AUGUST 30, 2023 DISTRIBUTION:

PUBLIC LPL2-1 R/F RidsAcrs_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMFarley Resource RidsRgn2Mail Center Resource GEMiller, NRR ZTurner, NRR JLamb, NRR ADAMS Accession No.: ML23240A001 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NAME JLamb KGoldstein MMarkley DATE 08/26/2023 08/28/2023 08/30/2023 OFFICE NRR/DORL/LPL2-1/PM NAME JLamb DATE 08/30/2023