MONTHYEARML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal ML23164A2182023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Letter NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover IR 05000348/20230012023-05-0404 May 2023 Integrated Inspection Report 05000348/2023001 and 05000364/2023001 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 2024-01-30
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22263A2252022-11-0101 November 2022 Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML22004A1322022-01-24024 January 2022 Correction of Amendment Nos. 227 and 224 Issuance of Amendments Regarding Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition (EPID L-2019-LLA-027 ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1252017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Operating Company Fleet Emergency Plan ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) NL-16-0388, Alternative Source Term License Amendment Request2016-11-22022 November 2016 Alternative Source Term License Amendment Request ML16196A1612016-11-17017 November 2016 Issuance of Amendments Related to Technical Specification 3.3.5 ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement NL-16-0388, Draft License Amendment Request Regarding Alternative Source Team2016-10-15015 October 2016 Draft License Amendment Request Regarding Alternative Source Team 2023-08-30
[Table view] |
Text
August 30, 2023 Ms. Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244
Dear Ms. Coleman:
On October 9, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20121A283), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 227 to Renewed Facility Operating License (RFOL) No. NPF-8 for the Joseph M. Farley Nuclear Plant (Farley), Unit 2, authorizing the revision of the RFOL paragraph 2.C(1) "Maximum Power Level" and associated Technical Specifications (TSs) to implement an increase in the maximum licensed Rated Thermal Power (RTP) from 2,775 megawatts thermal (MWt) to 2,821 MWt.
On August 25, 2023, the licensee informed NRC of an administrative error on the license page No. 3 to RFOL No. NPF-8 for Farley, Unit 2, concerning Amendment Nos. 241, 242, 243, and 244 dated November 8, 2022, March 16, July 3, and August 24, 2023, respectively (ML22308A059, ML23054A455, ML23136B154, and ML23235A296). The NRC stated incorrectly that the maximum licensed RTP for Farley, Unit 2, was 2,775 MWt (i.e., the pre-power uprate authorized limit), when the correct Farley, Unit 2, maximum licensed RTP is 2,821 MWt, as authorized by Amendment No. 227.
The NRC staff has determined that these errors were administrative in nature and has corrected the errors. The corrections do not change any of the conclusions associated with the issuance of Amendment Nos. 241, 242, 243, and 244 to RFOL Nos. NPF-8 for Farley, Unit 2, and do not affect the proposed finding that the amendments involve no significant hazards consideration published in the Federal Register on February 22, 2022 (87 FR 9652), February 22, 2022 (87 FR 9652), and December 6, 2022 (87 FR 74669), for Amendment Nos. 241, 242, and 243, respectively. Amendment No. 244 was an emergency amendment with the no significant hazards consideration contained in Amendment No. 244. This correction does not affect the no significant hazards consideration contained in Amendment No. 244.
Accordingly, Enclosures 1, 2, 3, and 4 to this letter provide corrected pages for Amendment Nos. 241, 242, 243, and 244, respectively, to RFOL No. NPF-8 for Farley, Unit 2.
J. Coleman Consistent with NRC staff guidance dated January 16, 1997 (ADAMS Accession No. ML103260096), based on the NRCs policy established by SECY-96-238, these errors can be corrected by a letter to the licensee from the NRC staff.
If you have any questions, please contact me at 301-415-3100, or via e-mail at John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-364
Enclosure:
- 1. Corrected Page for Amendment No. 241 to NPF-8
- 2. Corrected Page for Amendment No. 242 to NPF-8
- 3. Corrected Page for Amendment No. 243 to NPF-8
- 4. Corrected Page for Amendment No. 244 to NPF-8 cc: Listserv
ENCLOSURE 1 CORRECTED PAGE FOR AMENDMENT NO. 241 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 241, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 241
ENCLOSURE 2 CORRECTED PAGE FOR AMENDMENT NO. 242 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 242, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 242
ENCLOSURE 3 CORRECTED PAGE FOR AMENDMENT NO. 243 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 243
ENCLOSURE 4 CORRECTED PAGE FOR AMENDMENT NO. 244 TO NPF-8 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 244, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144 (4) Delete Per Amendment 149 (5) Delete per Amend 144 Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 244
J. Coleman
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244 DATED AUGUST 30, 2023 DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsAcrs_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMFarley Resource RidsRgn2Mail Center Resource GEMiller, NRR ZTurner, NRR JLamb, NRR ADAMS Accession No.: ML23240A001 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NAME JLamb KGoldstein MMarkley DATE 08/26/2023 08/28/2023 08/30/2023 OFFICE NRR/DORL/LPL2-1/PM NAME JLamb DATE 08/30/2023