MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency 2024-09-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23240A0012023-08-30030 August 2023 – Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22263A2252022-11-0101 November 2022 Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML22004A1322022-01-24024 January 2022 Correction of Amendment Nos. 227 and 224 Issuance of Amendments Regarding Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition (EPID L-2019-LLA-027 ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1252017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Operating Company Fleet Emergency Plan ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) NL-16-0388, Alternative Source Term License Amendment Request2016-11-22022 November 2016 Alternative Source Term License Amendment Request ML16196A1612016-11-17017 November 2016 Issuance of Amendments Related to Technical Specification 3.3.5 ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement 2024-08-29
[Table view] |
Text
August 30, 2023
Ms. Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244
Dear Ms. Coleman:
On October 9, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20121A283), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 227 to Renewed Facility Operat ing License (RFOL) No. NPF-8 for the Joseph M. Farley Nuclear Plant (Farley), Unit 2, authorizing the revision of the RFOL paragraph 2.C(1) "Maximum Power Level" and associated Technical Specifications (TSs) to implement an increase in the maximum licensed Rated Thermal Power (RTP) from 2,775 megawatts thermal (MWt) to 2,821 MWt.
On August 25, 2023, the licensee informed NRC of an administrative error on the license page No. 3 to RFOL No. NPF-8 for Farley, Unit 2, concerning Amendment Nos. 241, 242, 243, and 244 dated November 8, 2022, March 16, July 3, and August 24, 2023, respectively (ML22308A059, ML23054A455, ML23136B154, and ML23235A296). The NRC stated incorrectly that the maximum licensed RTP for Farley, Unit 2, was 2,775 MWt (i.e., the pre-power uprate authorized limit), when the correct Farley, Unit 2, maximum licensed RTP is 2,821 MWt, as authorized by Amendment No. 227.
The NRC staff has determined that these errors were administrative in nature and has corrected the errors. The corrections do not change any of the conclusions associated with the issuance of Amendment Nos. 241, 242, 243, and 244 to RFOL Nos. NPF-8 for Farley, Unit 2, and do not affect the proposed finding that the amendments involve no significant hazards consideration published in the Federal Register on February 22, 2022 (87 FR 9652), February 22, 2022 (87 FR 9652), and December 6, 2022 (87 FR 74669), for Amendment Nos. 241, 242, and 243, respectively. Amendment No. 244 was an em ergency amendment with the no significant hazards consideration contained in Amendment No. 244. This correction does not affect the no significant hazards consideration contained in Amendment No. 244.
Accordingly, Enclosures 1, 2, 3, and 4 to this letter provide corrected pages for Amendment Nos. 241, 242, 243, and 244, respectively, to RFOL No. NPF-8 for Farley, Unit 2.
J. Coleman - 2 -
Consistent with NRC staff guidance dated J anuary 16, 1997 (ADAMS Accession No. ML103260096), based on the NRCs policy established by SECY-96-238, these errors can be corrected by a letter to the licensee from the NRC staff.
If you have any questions, please contact me at 301-415-3100, or via e-mail at John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reac tor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-364
Enclosure:
- 1. Corrected Page for Amendment No. 241 to NPF-8
- 2. Corrected Page for Amendment No. 242 to NPF-8
- 3. Corrected Page for Amendment No. 243 to NPF-8
- 4. Corrected Page for Amendment No. 244 to NPF-8
cc: Listserv ENCLOSURE 1
CORRECTED PAGE FOR AMENDMENT NO. 241 TO NPF-8
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2
DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
(4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
(5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
(6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level
Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 241, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144
(4) Delete Per Amendment 149
(5) Delete per Amend 144
Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 241 ENCLOSURE 2
CORRECTED PAGE FOR AMENDMENT NO. 242 TO NPF-8
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2
DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
(4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
(5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
(6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level
Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 242, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144
(4) Delete Per Amendment 149
(5) Delete per Amend 144
Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 242 ENCLOSURE 3
CORRECTED PAGE FOR AMENDMENT NO. 243 TO NPF-8
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2
DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
(4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
(5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
(6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level
Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144
(4) Delete Per Amendment 149
(5) Delete per Amend 144
Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 243 ENCLOSURE 4
CORRECTED PAGE FOR AMENDMENT NO. 244 TO NPF-8
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
ALABAMA POWER COMPANY
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2
DOCKET NO. 50-364
(2) Alabama Power Company, pursuant to Section 103 of the Act and 10 CFR Part 50, Licensing of Production and Utilization Facilities, to possess but not operate the facility at the designated location in Houston County, Alabama in accordance with the procedures and limitations set forth in this renewed license.
(3) Southern Nuclear, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
(4) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
(5) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproducts, source or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and
(6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporate below:
(1) Maximum Power Level
Southern Nuclear is authorized to operate the facility at reactor core power levels not in excess of 2821 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 244, are hereby incorporated in the renewed license.
Southern Nuclear shall operate the facility in accordance with the Technical Specifications.
(3) Delete per Amendment 144
(4) Delete Per Amendment 149
(5) Delete per Amend 144
Farley - Unit 2 Renewed License No. NPF-8 Amendment No. 244 J. Coleman
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - CORRECTION TO ISSUANCE OF AMENDMENT NOS. 241, 242, 243, AND 244 DATED AUGUST 30, 2023
DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsAcrs_MailCTR Resource RidsNrrDorlLpl2-1 Resource RidsNrrLAKGoldstein Resource RidsNrrPMFarley Resource RidsRgn2Mail Center Resource GEMiller, NRR ZTurner, NRR JLamb, NRR
ADAMS Accession No.: ML23240A001 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NAME JLamb KGoldstein MMarkley DATE 08/26/2023 08/28/2023 08/30/2023 OFFICE NRR/DORL/LPL2-1/PM NAME JLamb DATE 08/30/2023