IR 05000382/2015401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:" " September 1, 2015 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057
{{#Wiki_filter:" " September 1, 2015 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057
-0751
-0751 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401) Dear Mr. Chisum
 
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401) Dear Mr. Chisum
: On August 13 , 2015 , the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit The results of that review have been transmitted to you separately in a publicly available assessment lette This letter informs you of the NRC's plans for future security-related inspections at your facilit The enclosed inspection plan lists the security-related inspections scheduled through June 30, 201 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personne l availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change Routine force
: On August 13 , 2015 , the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit The results of that review have been transmitted to you separately in a publicly available assessment lette This letter informs you of the NRC's plans for future security-related inspections at your facilit The enclosed inspection plan lists the security-related inspections scheduled through June 30, 201 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personne l availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change Routine force
-on-force inspections are conducted approximately every 3 year You will be notified by separate correspondence 8 to 10 weeks in advance of any force
-on-force inspections are conducted approximately every 3 year You will be notified by separate correspondence 8 to 10 weeks in advance of any force

Revision as of 00:18, 18 May 2019

Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401)
ML15244B213
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/01/2015
From: Haire M S
Plant Support Branch-1
To: Chisum M R
Entergy Operations
References
IR 2015401
Download: ML15244B213 (4)


Text

" " September 1, 2015 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057

-0751 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401) Dear Mr. Chisum

On August 13 , 2015 , the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit The results of that review have been transmitted to you separately in a publicly available assessment lette This letter informs you of the NRC's plans for future security-related inspections at your facilit The enclosed inspection plan lists the security-related inspections scheduled through June 30, 201 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personne l availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change Routine force

-on-force inspections are conducted approximately every 3 year You will be notified by separate correspondence 8 to 10 weeks in advance of any force

-on-force inspections scheduled for your facilit While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our countr Thus due to the security

-related information contained in this correspondence, and UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011

-4511 M. Chisum - 2 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this lette

Sincerely,

/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket N License No. NPF-38 Enclosure:

Inspection Plan cc w/encl: M