The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF) Change TSTF-425.
The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF) Change TSTF-425.
On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected.
On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected.
The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below. 1. TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1." 2. TS page 3.3-5 -the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.  
The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below. 1. TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1." 2. TS page 3.3-5 -the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.
: 3. TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12321A234).  
: 3. TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12321A234).
: 4. TS page 3.6-34 -SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).  
: 4. TS page 3.6-34 -SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).  
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE AL TERA TIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).  
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE AL TERA TIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.
Line 40: Line 40:


Sincerely, Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15 ACTIONS (continued)
Sincerely, Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15 ACTIONS (continued)
CONDITION  
CONDITION
: c. One or more control C.l rod scram accumulators inoperable with reactor steam dome pressure < 900 psig. AND -C.2 D. Required Action and D.l associated Completion Time of Required Action B.l or C.l not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE Control Rod Scram Accumulators  
: c. One or more control C.l rod scram accumulators inoperable with reactor steam dome pressure < 900 psig. AND -C.2 D. Required Action and D.l associated Completion Time of Required Action B.l or C.l not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE Control Rod Scram Accumulators  


Line 89: Line 89:
Verify a control rod withdrawal block is inserted.
Verify a control rod withdrawal block is inserted.
Perform SR 3.1.1.1. Verify no other CORE ALTERATIONS are in progress.
Perform SR 3.1.1.1. Verify no other CORE ALTERATIONS are in progress.
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program According to SR 3.1.1.1 In accordance with the Surveillance Frequency Control Program 3.10-15 Amendment No. +/-J4, 201 P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).  
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program According to SR 3.1.1.1 In accordance with the Surveillance Frequency Control Program 3.10-15 Amendment No. +/-J4, 201 P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).  
: 5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other'' was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).  
: 6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other'' was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3.7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
: 7. TS pages 3.1-17, 3.1-19, 3.6-32, 3.7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.
Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.

Revision as of 10:04, 27 April 2019

Corrections to Amendment No. 201 Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425
ML16039A121
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/18/2016
From: Rankin J K
Plant Licensing Branch III
To: Fessler P
DTE Electric Company
Rankin J K
References
CAC MF7296
Download: ML16039A121 (15)


Text

Mr. Paul Fessler UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 18, 2016 Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 -210 NOC 6400 North Dixie Highway Newport, Ml 48166

SUBJECT:

FERMI 2 -CORRECTIONS TO AMENDMENT NO. 201 REGARDING RELOCATION OF SPECIFIC SURVILLANCE FREQUENCIES TO A CONTROLLED PROGRAM BASED ON TECHNICAL SPECIFICATION TASK FORCE CHANGE TSTF-425 (CAC NO. MF7296)

Dear Mr. Fessler:

On July 14, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 201 to Renewed Facility Operating License No. NPF-43 for the Fermi 2 facility (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15155B416).

This amendment consisted of changes to the technical specifications (TSs) and Renewed Facility Operating License in response to your application dated September 16, 2014 (ADAMS Accession No. ML 14259A564), as supplemented by letter dated April 17, 2015 (ADAMS Accession No. ML 15107A407).

The amendment modified the TSs by relocating specific surveillance frequencies to a licensee-controlled program based on TS Task Force (TSTF) Change TSTF-425.

On January 29, 2016, the NRC staff identified an error in the TSs for Fermi 2. Upon further review, it was determined some of the clean pages prepared to support issuance of the amendment contained format and typographical errors; therefore, additional TS pages needed to be corrected.

The NRC has reviewed the corrected TS pages attached and determined that they are consistent with the proposed TS markups included in the application dated September 16, 2014, and the errors were inadvertently introduced in License Amendment No. 201, dated July 14, 2015. The specific corrections are described below. 1. TS page 3.2-4-the heading "3.2.3 LINEAR HEAT GENERATION RATE (LHGR)" was corrected from "3.2.1." 2. TS page 3.3-5 -the words "FUNCTIONAL TEST" in SR 3.3.1.1.5 were capitalized.

3. TS pages 3.5-7 and 3.6-21-SRs3.5.1.13 and 3.6.1.6.1 should state, " ... valve is capable of being opened" instead of, " ... valve opens when manually actuated." The change to the SRs were approved by License Amendment No. 190 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12321A234).
4. TS page 3.6-34 -SR 3.6.2.3 should state. "Verify each required RHR pump develops a flow 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode." The change from 10,000 gpm to 9,250 gpm was P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).
5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of" 10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).
6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE AL TERA TIONS are in progress." The addition of the word "other" was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 99102201218).
7. TS pages 3.1-17, 3.1-19, 3.6-32, 3. 7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and are entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.

Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.

Docket No. 50-341

Enclosure:

Sincerely, Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv ENCLOSURE FERMI 2 DOCKET NO. 50-341 CORRECTED PAGES TO LICENSE AMENDMENT NO. 201 TECHNICAL SPECIFICATIONS PAGE 3.1-17 PAGE 3.1-19 PAGE 3.2-4 PAGE 3.3-5 PAGE 3.5-7 PAGE 3.6-21 PAGE 3.6-32 PAGE 3.6-34 PAGE 3.6-50 PAGE 3.7-2 PAGE 3.10-15 ACTIONS (continued)

CONDITION

c. One or more control C.l rod scram accumulators inoperable with reactor steam dome pressure < 900 psig. AND -C.2 D. Required Action and D.l associated Completion Time of Required Action B.l or C.l not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE Control Rod Scram Accumulators

3.1.5 REQUIRED

ACTION COMPLETION TIME Verify all control Immediately upon rods associated with discovery of inoperable charging water accumulators are header pressure fully inserted.

< 940 psig Declare the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated control rod inoperable. --------NOTE ---------Not applicable if all inoperable control rod scram accumulators are associated with fully inserted control rods . ... ---------... -----.. ----Place the reactor Immediately mode switch in the shutdown position.

FREQUENCY SR 3 .1. 5 .1 Verify each control rod scram accumulator pressure is 940 psig. In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.1-17 Amendment No. 201 ACTIONS (continued)

CONDITION B. Nine or more OPERABLE B.1 control rods not in compliance with the prescribed withdrawal sequence.

SURVEILLANCE REQUIREMENTS AND B.2 SURVEILLANCE REQUIRED ACTION --------NOTE ---------Rod worth minimizer (RWM) may be bypassed as a 11 owed by LCO 3 . 3 . 2 . 1. Rod Pattern Control 3.1.6 COMPLETION TIME Suspend withdrawal of Immediately control rods. Place the reactor mode switch in the shutdown position.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> FREQUENCY SR 3 .1.6.1 Verify all OPERABLE control rods comply with the prescribed withdrawal sequence.

In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.1-19 Amendment No. !J4, 201

3.2 POWER

DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR) LHGR 3.2.3 LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY:

THERMAL POWER 25% RTP. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any LHGR not within A.1 Restore LHGR(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits. within limits. B. Required Action and B.l Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.2.3.1 Verify all LHGRs are less than or equal to the limits specified in the COLR. FERMI -UNIT 2 3.2-4 FREQUENCY Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 25% RPT AND In accordance with the Surveillance Frequency Control Program Amendment No. 201 RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)

SR 3 . 3 . 1. 1. 5 SR 3 . 3 . 1. 1. 6 SR 3 . 3 . 1. 1. 7 SR 3 . 3 . 1. 1. 8 SR 3 . 3 . 1. 1. 9 FERMI -UNIT 2 SURVEILLANCE Perform CHANNEL FUNCTIONAL TEST. FREQUENCY In accordance with the Surveillance Frequency Control Program Verify the source range monitor (SRM) and Prior to fully intermediate range monitor (!RM) channels withdrawing overlap. SRMs from the core ------------------

NOTE ------------------

Only required to be met during entry into MODE 2 from MODE 1. Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program Calibrate the local power range monitors.

In accordance with the Surveillance Frequency Control Program Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program (continued) 3.3-5 Amendment No.-+/-J4. 201 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3 . 5 . 1 .

11 -------------------

NOTE --------------------

Vessel injection/spray may be excluded.

Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal. SR 3 . 5 . 1. 12 -------------------

NOTE --------------------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or simulated automatic initiation signal. SR 3.5.1.13 Verify each ADS valve is capable of being opened. SR 3 . 5 .1 .14 -------------------

NOTE --------------------

ECCS instrumentation response times are not required to be measured.

ECCS-Operati ng 3.5.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Verify ECCS RESPONSE TIME is within limits. In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.5-7 Amendment No. 201 LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SR 3 . 6 . 1. 6 . 1 SR 3 . 6 . 1. 6 . 2 FERMI -UNIT 2 SURVEILLANCE FREQUENCY Verify each LLS valve is capable of being In accordance opened. with the Surveillance Frequency Control Program ------------------

NOTE -------------------

Valve actuation may be excluded.

Verify the LLS System actuates on an actual or simulated automatic initiation signal. In accordance with the Surveillance Frequency Control Program 3.6-21 Amendment No. l.J4 +/-9-0, 201

3.6 CONTAINMENT

SYSTEMS Suppression Pool Water Level 3.6.2.2 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall -2 inches and s +2 inches. APPLICABILITY:

MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool water A.1 Restore suppression 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> level not within pool water level to limits. within limits. B. Required Action and B.l Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND -B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SR 3.6.2.2.1 FERMI -UNIT 2 SURVEILLANCE FREQUENCY Verify suppression pool water level is In accordance within limits. with the Surveillance Frequency Control Program 3.6-32 Amendment No. +/-J4, 201 RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SR 3.6.2.3.1 SR 3.6.2.3.2 FERMI -UNIT 2 SURVEILLANCE Verify each RHR suppression pool cooling subsystem manual. power operated.

and automatic valve in the flow path that is not locked. sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

Verify each required RHR pump develops a flow rate 9,250 gpm through the associated heat exchanger while operating in the suppression pool cooling mode. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Testing Program 3.6-34 Amendment No. !J4. +/-9-+/-, 201 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 SURVEILLANCE Operate each SGT subsystem for 15 continuous minutes with heaters operating.

Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP). Verify each SGT subsystem actuates on an actual or simulated initiation signal. Verify each SGT filter cooler bypass damper can be opened and the fan started. SGT System 3.6.4.3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.6-50 Amendment No. 201 ACTIONS (continued)

CONDITION REQUIRED ACT! ON D. Required Action and D.l --------NOTE ---------associated Completion LCD 3.0.4.a is not Time of Condition A, applicable when B, or C not met. entering MODE 3. ----................................

Be in MODE 3. E. Both RHRSW subsystems E.l --------NOTE ---------inoperable for reasons Enter applicable other than Conditions and Condition B. Required Actions of LCD 3.4.8 for RHR shutdown cooling made inoperable by RHRSW System . .. ----........ ---.............. --.. Restore one RHRSW subsystem to OPERABLE status. F. Required Action and F.1 Be in MODE 3. associated Completion Time of Condition E AND not met. -F.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SR 3 .7 .1.1 SURVEILLANCE Verify each RHRSW manual, power operated.

and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.

RHRSW System 3.7.1 COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8 hours 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program FERMI -UNIT 2 3.7-2 Amendment No. +/-94, 201 Single CRD Removal-Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SR 3.10.5.1 SR 3.10.5.2 SR 3.10.5.3 SR 3.10.5.4 SR 3.10.5.5 FERMI

  • UNIT 2 SURVEILLANCE Verify all control rods. other than the control rod withdrawn for the removal of the associated CRD. are fully inserted.

Verify all control rods. other than the control rod withdrawn for the removal of the associated CRD. in a five by five array centered on the control rod withdrawn for the removal of the associated CRD. are disarmed.

Verify a control rod withdrawal block is inserted.

Perform SR 3.1.1.1. Verify no other CORE ALTERATIONS are in progress.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program According to SR 3.1.1.1 In accordance with the Surveillance Frequency Control Program 3.10-15 Amendment No. +/-J4, 201 P. Fessler approved by License Amendment No. 191 issued in letter dated December 21, 2012 (ADAMS Accession No. ML 12333A327).

5. TS page 3.6-50 -SR 3.6.4.3.1 should state, " ... 15 continuous minutes" instead of "10 continuous hours." The change to this SR was approved by License Amendment No. 192 issued in letter dated May 13, 2013 (ADAMS Accession No. ML 13112A142).
6. TS page 3.10-15 -SR 3.10.5.5 should state, "Verify no other CORE ALTERATIONS are in progress." The addition of the word "other was approved by License Amendment No. 134 issued in letter dated September 30, 1999 (ADAMS Legacy Accession No. 9910220121B).
7. TS pages 3.1-17, 3.1-19, 3.6-32, 3.7-2 -spaces were added to properly align the text in the REQUIRED ACTION or CONDITION columns. The NRC staff concludes that the errors were introduced during preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Enclosed are the corrected TS pages for License Amendment No. 201 for the Fermi 2 facility.

Please replace the affected pages in the Fermi 2 TSs with the enclosed pages. If you have any questions regarding this matter, please call me at (301) 415-1530.

Docket No. 50-341

Enclosure:

Sincerely, IRA/ Jennivine K. Rankin, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Corrected Pages to License Amendment No. 201 cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrPMFermi Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnm_MailCTR Resource ADAMS Accession No.: ML 16039A121 OFFICE DORL/LPLI 11-1 /PM DORL/LPLlll-1/LA NAME JRankin MHenderson DATE 2/10/2016 2/10/2016 RidsRgn3MailCenter Resource RidsNrrLAMHenderson Resource RecordsAmend Resource DORL/LPLI 11-1 /BC DORL/LPLlll-1/PM DWrona JRankin 2/18/2016 2/18/2016 OFFICIAL RECORD COPY