IR 05000382/2018405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18058A989
| number = ML18087A397
| issue date = 02/26/2018
| issue date = 03/28/2018
| title = Waterford Steam Electric Station Unit 3 - NRC Material Control and Accounting Program Inspection Report 05000382/2018405
| title = Errata - Waterford Steam Electric Station, Unit 3 - NRC Material Control and Accounting Program Inspection Report 05000382/2018405
| author name = Gepford H J
| author name = Gepford H J
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| addressee name = Dinelli J
| addressee name = Dinelli J
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = IR 2018405
| document report number = IR 2018405
| document type = Inspection Report, Letter
| document type = Letter
| page count = 3
| page count = 3
}}
}}
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::February 26, 2018]]
[[Issue date::March 28, 2018]]


Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
Mr. John Dinelli, Site Vice President Entergy Operations, Inc.
Line 25: Line 25:
17265 River Road Killona, LA 70057-0751
17265 River Road Killona, LA 70057-0751


SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000382/2018405
SUBJECT: ERRATA - WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000382/2018405


==Dear Mr. Dinelli:==
==Dear Mr. Dinelli:==
On January 25, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Waterford Steam Electric Station, Unit 3. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on January 25, 2018, with you and other members of your staff.
Based on an internal review, the NRC has confirmed an error in Inspection Report No. 05000382/2018405, dated February 26, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18058A945). Specifically, the report omitted one of the samples inspected in the Inspection Scope Sect ion. The NRC has reissued the report in its entirety to correct this error.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Based on the results of this inspection, no findings were identified.
However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), t he NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC P ublic Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,/RA/
Sincerely,/RA/
Line 58: Line 54:
17265 River Road Killona, LA 70057-0751
17265 River Road Killona, LA 70057-0751


ML18058A945
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: HJG Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: HJG Yes No Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PSB2 C:DRP/D C:PSB2 NAME JO'Donnell HGepford GMiller HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 3/21/18 3/28/18 3/28/18 3/28/18
 
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18058A989 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PSB2 C:DRP/D C:PSB2 NAME JO'Donnell HGepford GMiller HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 2/22/18 2/22/18 2/23/18 2/26/18
}}
}}

Revision as of 15:48, 21 September 2018

Errata - Waterford Steam Electric Station, Unit 3 - NRC Material Control and Accounting Program Inspection Report 05000382/2018405
ML18087A397
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/28/2018
From: Gepford H J
NRC/RGN-IV/DRS/PSB-2
To: Dinelli J
Entergy Operations
References
IR 2018405
Download: ML18087A397 (3)


Text

March 28, 2018

Mr. John Dinelli, Site Vice President Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

SUBJECT: ERRATA - WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000382/2018405

Dear Mr. Dinelli:

Based on an internal review, the NRC has confirmed an error in Inspection Report No. 05000382/2018405, dated February 26, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18058A945). Specifically, the report omitted one of the samples inspected in the Inspection Scope Sect ion. The NRC has reissued the report in its entirety to correct this error.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Heather J. Gepford, PhD., CHP, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No. 50-382 License No. NPF-38

Nonpublic

Enclosure:

Inspection Report 05000382/2018405

w/Attachments:

1. Supplemental Information 2. Information Request

cc w/enclosure:

Mr. André James

Manager, Security Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: HJG Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: HJG Yes No Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PSB2 C:DRP/D C:PSB2 NAME JO'Donnell HGepford GMiller HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 3/21/18 3/28/18 3/28/18 3/28/18