TXX-4874, Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances for Shims Used w/C-type Clamps on Cable Trays.Initially Reported on 860527.Electrical Raceway Items Will Be Consolidated by Ebasco Svcs.Next Rept Expected by 861021

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances for Shims Used w/C-type Clamps on Cable Trays.Initially Reported on 860527.Electrical Raceway Items Will Be Consolidated by Ebasco Svcs.Next Rept Expected by 861021
ML20211L121
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/26/1986
From: Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-39, TXX-4874, NUDOCS 8607010509
Download: ML20211L121 (1)


Text

-

Log # TXX-4874 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY MWEst . 400 NORTH OtJVE STREET. I.B. A 8 . DALLAS. TEXAS 75301 June 26, 1986 03^0h?2Y."Oh \ F j

Mr. Eric H. Johnson, Director M Division of Reactor Safety and Projects 1~- -_lUS U. S. Nuclear Regulatory Commission {

611 Ryan Plaza Drive, Suite 1000 ~

Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CABLE TRAY C-TYPE CLAMP SHIM DIMENSIONS i

SDAR: CP-86-39 (INTERIM REPORT)

Dear Mr. Johnson:

On May 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency ,

involving dimensional tolerances for the shims used in conjunction with C-Type i clamps on cable trays. This is an interim report of a potentially reportable  !

item under the provision of 10CFR50.55(e).

This issue is related to CP-85-19, Conduit Support Spans, and CP-85-34, Conduit Support Design, and these issues are being evaluated under CPRT Program Item VIII. All electrical raceway items (tray, . conduit, supports) have been consolidated under the scope of Ebasco Services. This program plan is scheduled for completion in September,1986. We are continuing our evaluation '

and anticipate submitting our next report by October 21, 1986.

i Very truly yours, )

$ Mid$b W. G. Cou s 1 By: .

G. S. Keeley Manager, NucTeam - ensing JCH/arh l c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 e {$$ $