PNO-I-79-040, on 791218,contractor Painter Fell from Ladder in Reactor Bldg & Sprained Ankle.Painter Was Treated & Released from Hosp.No Radiation or Contamination Involved

From kanterella
Jump to navigation Jump to search
PNO-I-79-040:on 791218,contractor Painter Fell from Ladder in Reactor Bldg & Sprained Ankle.Painter Was Treated & Released from Hosp.No Radiation or Contamination Involved
ML20125E339
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/18/1979
From: Brunner E, Caphton D, Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-I-79-040, PNO-I-79-40, NUDOCS 8002070474
Download: ML20125E339 (1)


,

j '

4. ; . 3, 3a -..-

- + ~ - i 7 c c s. _

' , 1 PRELIMINA,RY NOTIFICAYION -

Date: December 18. 1979

_ PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-7940

' This preliminary notification constitutes EARLY notice of events of POSSIBLE '

i safety or oublic~ interest significance. fne information presented is as ETtlally received Without verification or evaluation and is' basically all that is known

~

by 'E staff on this date.  !

Facility: Philadelphia Electric Cornpany Fooch Bottom Atomic Power Station. Unit 2 (DN 50-277)

Delta, Pennsylvania subject:

IN.1hRY TO CONTRAcr0R EMPl0YEE A contractor painter was treated and released from liarford. Pa. Memorial Hospital

.:fter he fell from a laddcr in the reactor building and suffered a sprained  :

ankle at 10:00 AM on December 18, 1979. No radiation or personnel contamination ,

was involved in 1.his industrial accident. '

Medin interest is expected due to interesL in matters relative to nuclear power  !

plants. The Commonwealth of Pennsylvania and the State of Maryland have been 1 i nformed. A press release is not planned by the licensee nor NRC.

This PN is issued for inforulation only and no further action by 1E is anticipated.

NRC, Region I, (Philadelphia) received notification of this occurrence by a telephone call from the Renctor Resident . Inspector (RRI) at 3:30 PM, December 18,19/9.

l

Contact:

E. Greenman D. Caphton 488-1?fil E. Brunner . 488-1240 9 7-3311//1/-466-7614 '

DISTRIBUTION: (Facsimile Transmission Times Noted)

H ST BLOG _

MARYLAND NATIONAL IE: X00$

Chairman E @ nc SANK BUILDING NRC/TMI Resident I Commissioner Kennerty L. V. Gossick, E00 office _

~

l Commissioner Gilinsky H. L. Ornstein, EDO Comissinner Bradford - J. J. Fouchard, PA Region II Commissioner Hendrie N. M. Haller, MPA Region III -

l ACR$ _

R. G. Ryan, OSP Regiori IV '

5. J. Chilk, SECY H. K. Shopar, ELD Region V w C. C. Kammerer, CA (For Distribution) WILTSIE BLOG RI Resident Sites W. J. Dircks,'NMSS ._/

PHILLIPS BLOG S. Levin, RES /

H. R. Dentun, NRR I R. C. DeYoung, NRR (MAIL)

R. J. Mattson, NRR R""'TIInogue, SD _

D. Vassallo, NRR ,

IE: X005 D. Eisenhut, NRR l ..

' PRELIMINARY NOTIFICATION Ragion'IForm63- 8002070  ;

(Rev.. December 79)