PNO-I-87-026:on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete
ML20212E292
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/31/1987
From: Cowgill C, Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-87-026, PNO-I-87-26, NUDOCS 9711030134
Download: ML20212E292 (1)


1 P Det  !

) i CORRECTED COPY 005 No: 50278870331 Nd Date: March 31, 987 PREllMINARY NOTIFICATION OF tVENT OR UNt'SUAL OCCURRENCE--PNO-I-87-26 O

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date. '

g Facility: Licensee Emergency Classification:

Philadelphia Electric Co. Notification of Unusual Event

. Peach Bottom Atomic Power Station, Alert Units 2 and 3 Site Area Emergency Divs 50-277 and 50-278 General Emergency Delta Pennsylvania 17314 gX hot Applicable

Subject:

SHUTDOWN IN RESPONCE TO NRC ORDER At 11:30 a.m. on March 31,1987, thb4RCkssMd EM ortier suspending power operation a

effective imediately. Unit 3 began a controlled shutdown from 100% reactor power at about 11:40 a.m. The order requires Unit 3 to be in a cold condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

At 3:18 p.m., Unit 3 was manually scramed in accordance with procedures. Unit 2 is currently in a scheduled refueling outage; core offload is in prearess and is about 50%

complete. On March 24, 1987, NRC Region I, received information that control room personnel had been observed sleeping while on duty. On March 24, 1987 the NRC began a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inspection coverage of the Peach Bottom contiol room, and special safety investigation of licensed activities, which is still ongoing. To date the ,

investigation has established that licensed reactor operators have fo; the past five months periodically slept or have been otherwise inattentive to licensed dytte. and that shift supervision and plant management were aware of the situation anditook no action. The Region is continuing its investigation. Region I inspectors'a.re e continuing 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inspection coverage. Region I issued a press release at 1:00 p.m.

today and has received heavy media interest.

The Comonwealth of Pennsylvania and State of Meryland have been informed.

l s CCNTACT: C. Cowgill R. Gallo FTS 488-1234 488-1225 ,

DISTRIBUTION:

H. St. MNBB Phillips E/W Willste Mail: ADM:DMB Chairman Zech EDO MR- TT TMIS DOT:Trans only Com. Bernthal PA OIA RES Com. Roberts ELD AEOD NRC Ops Crt Com. Asselstine Com. Carr y (0 ~2 -

ACRS Air Rights INPO----

SECY SP NSAC---- p \

PDR Regional Offices ~

TMI Resident Section RI Resident Office Licensee:

(Reactor Licensees)

Region I Form 83 (Rev. July 1986) 3 C R Distribution: Chm, Cm; -

. GC, CA, M Historian SECY, Records.

io G5- .

9711030134 870331 PDR I&E -

PNO-I-87-026 P"H