Notice of Violation from Insp on 970308-0503.Violation Noted:Between 970321-26,PECO Failed to Maintain Measures to Assure That Design Quality Std Deviations for safety-related Rhr,Hpci & HPSW Were Controlled
ML20140D184
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/04/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20140D148 List:
References
50-277-97-02, 50-277-97-2, 50-278-97-02, 50-278-97-2, NUDOCS 9706100282
Download: ML20140D184 (2)


Text

-

4 APPENDlX A NOTICE OF VIOLATIONS PECO Energy Company Docket No. 50-277/278 Peach Bottom Atomic Power Station Unit 2 and 3 License No. DPR-44 I-Delta, PA DPR-56 During an NRC inspection conducted between March 8 and May 3,1997, violations of i

NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions, "10 CFR Part 2, Appendix C (1996), the l

violations are listed below:

A.

10 CFR 50 Appendix B, Criterion Ill, Design Control, requires, in part, that measures be established to assure that deviations from design quality standards for safety-related systems are controlled, t

Contrary to the above, between March 21 and March 26,1997, PECO failed to maintain measures to assure that deviations from the design quality standard for the j

safety-related residual heat removal, high pressure coolant injection, and high pressure service ~ water systems were controlled, Specifically, PECO maintenance j

i personnel constructed scaffolding that was in contact with or within close proximity to components in these safety-related systems without prior evaluation and approval of PECO engineering.

1 B.

Peach Bottom Atomic Power Station, Unit 3, Technical Specifications 3.3.2.2, "Feedwater and Main Turbine High Water Level Trip Instrumentation," requires that if two channels of this instrumentation are not operable with reactor power 2 25%,

that reactor power.be reduced to < 25 % power within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Contrary to the above, between April 4 and April 14,1997, two channels of the feedwater high water level trip for the C reactor feed pump were not operable and power was not reduced to < 25% within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Specifically, due to a blown fuse, the C reactor feedpump trip logic was de-energized and unable to cause the pump to trip on a high level. The main turbine trip function and the trip functions on the two other reactor feed pumps remained operable.

These are Severity Level IV violr,tions (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, PECO Energy Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region 1, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Viola-tion" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved, if an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause 1

9706100282 970604 PDR ADOCK 05000277 i

G-PDR v

m g

2 why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at King of Prussia, Pennsylvania this 4th day of June 1997 1

l