 Issue dateTitleTopic
PNO-I-99-011, on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries3 March 1999PNO-I-99-011:on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries
PNO-I-90-073, on 900830,licensee Identified That Reactor Vessel Level Monitoring Instruments Reading About 10 Inches Higher than Expected.Caused by Ref Leg Being Less than Completely Full.Manual Scram from Low Power Initiated31 August 1990PNO-I-90-073:on 900830,licensee Identified That Reactor Vessel Level Monitoring Instruments Reading About 10 Inches Higher than Expected.Caused by Ref Leg Being Less than Completely Full.Manual Scram from Low Power Initiated
PNO-I-90-058, on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation27 July 1990PNO-I-90-058:on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
ML20246P58230 August 1989PNS-I-89-014:on 890829,unusual Event Declared Due to Mischievous Vandalism of Electrical Circuit Breakers.Total of 10 Breakers Found W/Cut Leads.Region I Physical Security Inspector Dispatched to Site & Press Release Issued
ML20246H59125 August 1989PNS-I-89-012:on 890825,3 Bomb Threats Received.Vital Areas & Administration Bldg Searched.Threat Considered Hoax.Nrc & Commonwealth of PA Informed
PNO-I-89-068, on 890804,full Power Reached & Mar 1987 Shutdown Order relaxed.Two-wk Mgt Assessment Period at steady-state 100% Power Plateau Begun,Per Restart Power Testing Program4 August 1989PNO-I-89-068:on 890804,full Power Reached & Mar 1987 Shutdown Order relaxed.Two-wk Mgt Assessment Period at steady-state 100% Power Plateau Begun,Per Restart Power Testing Program
PNO-I-89-060, facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage21 July 1989PNO-I-89-060:facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage
ML20247D44219 July 1989PNS-I-89-013:on 890711,trespasser Arrested by Commonwealth of PA at Plant & While Arrested Made Ref to Large Amounts of Weapons & Explosives Stored at Residence in Edgewood,Md.Explosives & Detonators Removed from Residence
PNO-I-89-052, facility Authorized to Proceed to 70% Power. Insp on Site Will Continue During Power Ascension from 35% to 70% Power & Subsequent Transient Testing28 June 1989PNO-I-89-052:facility Authorized to Proceed to 70% Power. Insp on Site Will Continue During Power Ascension from 35% to 70% Power & Subsequent Transient Testing
PNO-I-89-050, on 890627,confirmatory Action Ltr Issued on Util & Commonwealth of PA Agreement to Satisfy Concerns Re Restart Plan.Agreement Should Form Basis for Concluding Hearing on Util Reorganization26 June 1989PNO-I-89-050:on 890627,confirmatory Action Ltr Issued on Util & Commonwealth of PA Agreement to Satisfy Concerns Re Restart Plan.Agreement Should Form Basis for Concluding Hearing on Util Reorganization
ML20247H86726 May 1989PNS-I-89-007A:on 890525,two Vehicle Bomb Threats Received at Facility.Licensee Maintaining in-force Heightened Security Measures.Law Enforcement Agencies in Plant Vicinity & Commonwealth of PA Notified
ML20247H85525 May 1989PNS-I-89-007:on 890525,telephone Call Received at Util Headquarters in Philadelphia,Pa Indicating That Van Loaded W/Explosives Would Arrive at Plant.Threat Evaluated as Noncredible.Heightened Security Awareness Initiated
PNO-I-89-036, on 890519,reactor High Level Water Feed Pump Tripped.Caused by Shifting of Feedwater Level Control Sys by Reactor Operator from Single Element to Three Element Control.Water Level Recovered & Isolations Reset19 May 1989PNO-I-89-036:on 890519,reactor High Level Water Feed Pump Tripped.Caused by Shifting of Feedwater Level Control Sys by Reactor Operator from Single Element to Three Element Control.Water Level Recovered & Isolations Reset
PNO-I-89-034, on 890426,Unit 2 Initiated Startup After Receiving Approval to Operate at Power Levels Not Exceeding 35% Full Power.Licensee Will Be Performing Control Rod Manipulations.Addl NRC Inspectors on Site to Monitor Plant27 April 1989PNO-I-89-034:on 890426,Unit 2 Initiated Startup After Receiving Approval to Operate at Power Levels Not Exceeding 35% Full Power.Licensee Will Be Performing Control Rod Manipulations.Addl NRC Inspectors on Site to Monitor Plant
PNO-I-89-014, on 890227 Commonwealth of PA & Util Announced Agreement on Proposed Actions to Address Commonwealth Concerns Re Mgt & Safety at Plant & to Provide Exchange of Info W/Commonwealth for Next 8 Yrs27 February 1989PNO-I-89-014:on 890227 Commonwealth of PA & Util Announced Agreement on Proposed Actions to Address Commonwealth Concerns Re Mgt & Safety at Plant & to Provide Exchange of Info W/Commonwealth for Next 8 Yrs
PNO-I-88-110, on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security21 October 1988PNO-I-88-110:on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security
PNO-I-88-092, on 880901,injured Contaminated Contractor Employee Removed from Site After Falling 20 Ft from Platform.Worker Suffered Broken Wrist & Facial Cut W/ 600 Dpm Contamination.Worker Successfully Decontaminated2 September 1988PNO-I-88-092:on 880901,injured Contaminated Contractor Employee Removed from Site After Falling 20 Ft from Platform.Worker Suffered Broken Wrist & Facial Cut W/ 600 Dpm Contamination.Worker Successfully Decontaminated
PNO-I-88-077, on 880727,Peach Bottom co-owners Sued Philadelphia Electric Co (PECO) for Failure to Comply W/Peco Obligations Under Contract to Notify co-owners of Serious Operator Attentiveness Problems27 July 1988PNO-I-88-077:on 880727,Peach Bottom co-owners Sued Philadelphia Electric Co (PECO) for Failure to Comply W/Peco Obligations Under Contract to Notify co-owners of Serious Operator Attentiveness Problems
PNO-I-88-050, on 880511,FBI Made Addl Arrests of Three Licensee Employees Re Involvement in Illegal Drug Activities Prior to 1987.Followup of PNO-I-87-10812 May 1988PNO-I-88-050:on 880511,FBI Made Addl Arrests of Three Licensee Employees Re Involvement in Illegal Drug Activities Prior to 1987.Followup of PNO-I-87-108
PNO-I-88-042A, on 880414,updated PNO Re Alcohol Bottle Found in Control Room by Engineers Performing Inventory of Agastat Relays Inside Electrical Distribution Panel.Senior Resident Inspector Notified & Investigation Continuing5 May 1988PNO-I-88-042A:on 880414,updated PNO Re Alcohol Bottle Found in Control Room by Engineers Performing Inventory of Agastat Relays Inside Electrical Distribution Panel.Senior Resident Inspector Notified & Investigation Continuing
PNO-I-88-042, licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal18 April 1988PNO-I-88-042:licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal
PNO-I-87-108B, on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees18 March 1988PNO-I-87-108B:on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-I-87-108A, on 871118,FBI Arrested Four Licensee & Two Contractor Employees Accused of Drug Distribution at Plant & Surrounding Area.One Util & Contractor Employees Found Guilty & Remaining Two Util Defendants Suspended20 January 1988PNO-I-87-108A:on 871118,FBI Arrested Four Licensee & Two Contractor Employees Accused of Drug Distribution at Plant & Surrounding Area.One Util & Contractor Employees Found Guilty & Remaining Two Util Defendants Suspended
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
ML20236R57519 November 1987PNS-I-87-019:on 871118,nonspecific Bomb Threats Received Over Plant Internal Telephone Sys.Steps to Heighten Security Awareness Among Plant & Security Supervisors Taken. Investigation Initiated by Licensee
PNO-I-87-108, on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area18 November 1987PNO-I-87-108:on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-I-87-057, on 870621,plant Manager Found Security Watchman Asleep at Drywell Access.Watchman Escorted Offsite by Sergeant of Guards & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions22 June 1987PNO-I-87-057:on 870621,plant Manager Found Security Watchman Asleep at Drywell Access.Watchman Escorted Offsite by Sergeant of Guards & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions
PNO-I-87-046, on 870529,security Watchman Found Asleep by Plant Auxiliary Operator & Shift Supervisor.Watchman Escorted Offsite & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions29 May 1987PNO-I-87-046:on 870529,security Watchman Found Asleep by Plant Auxiliary Operator & Shift Supervisor.Watchman Escorted Offsite & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions
PNO-I-87-042, on 870513,nonlicensed Operator Found Sleeping While on Duty During 'Z' Shift.Licensee Suspended Individual Pending Investigation.State of MD & Commonwealth of PA Informed14 May 1987PNO-I-87-042:on 870513,nonlicensed Operator Found Sleeping While on Duty During 'Z' Shift.Licensee Suspended Individual Pending Investigation.State of MD & Commonwealth of PA Informed
PNO-I-87-041, on 870508,util Terminated Employment of Subcontractor Hines Performing CRD Exchange Work.Caused by Poor Work Performance.Workers Escorted Offsite.Media Contacted by Worker Re 870505-08 Facial Contaminations11 May 1987PNO-I-87-041:on 870508,util Terminated Employment of Subcontractor Hines Performing CRD Exchange Work.Caused by Poor Work Performance.Workers Escorted Offsite.Media Contacted by Worker Re 870505-08 Facial Contaminations
PNO-I-87-040, on 870506,30 G of Suspected Marijuana Found Onsite When Substance Fell Out of Jacket of Catalytic Laborer.Caused by Employee Accidentally Bringing Substance Onsite.Employee Terminated8 May 1987PNO-I-87-040:on 870506,30 G of Suspected Marijuana Found Onsite When Substance Fell Out of Jacket of Catalytic Laborer.Caused by Employee Accidentally Bringing Substance Onsite.Employee Terminated
ML20205T1881 April 1987PNO-I-87-26A:on 870331,order Issued Suspending Power Operation Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 Currently in Scheduled Refueling Outage W/In Progress Core Offload 2/3 Complete
PNO-I-87-026, on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete31 March 1987PNO-I-87-026:on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete
PNO-I-87-024, on 870325,unit Auto Scrammed on Low Reactor Water Level When Engineer Lifted Electrohydraulic Control Lead Causing Bypass Valves to Open.Reactor Feed Pump Restarted.Water Level Recovered25 March 1987PNO-I-87-024:on 870325,unit Auto Scrammed on Low Reactor Water Level When Engineer Lifted Electrohydraulic Control Lead Causing Bypass Valves to Open.Reactor Feed Pump Restarted.Water Level Recovered
PNO-I-87-022, on 870317,hi-hi APRM Flux Scram & Group II & III Primary Containment Isolations Occurred.Caused by Electrohydraulic Control Sys Fluctuations.Unit in Cold Shutdown.Isolations Reset18 March 1987PNO-I-87-022:on 870317,hi-hi APRM Flux Scram & Group II & III Primary Containment Isolations Occurred.Caused by Electrohydraulic Control Sys Fluctuations.Unit in Cold Shutdown.Isolations Reset
PNO-I-87-018, on 870305,unit Shut Down Due to Hydrogen Leak from Main Generator.Leak Testing of Generator Identified Several Small & One Large Leak from Hydrogen Control & Analyzer Cabinet.Repairs to Generator & RHR HX in Progress9 March 1987PNO-I-87-018:on 870305,unit Shut Down Due to Hydrogen Leak from Main Generator.Leak Testing of Generator Identified Several Small & One Large Leak from Hydrogen Control & Analyzer Cabinet.Repairs to Generator & RHR HX in Progress
PNO-I-87-015, on 870304,smoke Reported in Turbine Bldg.Fire Found in Maint Cage in Turbine Bldg Fan Room.Fire Extinguished.Caused by Small Electrical Fan Suspended from Cage5 March 1987PNO-I-87-015:on 870304,smoke Reported in Turbine Bldg.Fire Found in Maint Cage in Turbine Bldg Fan Room.Fire Extinguished.Caused by Small Electrical Fan Suspended from Cage
PNO-I-87-001, on 870102,licensee Notified Region I Ofc of Unplanned Shut Down to Repair Steam Leak on High Pressure Turbine Inlet Flange.Facility Expected to Be Shut Down for Approx 4 Days2 January 1987PNO-I-87-001:on 870102,licensee Notified Region I Ofc of Unplanned Shut Down to Repair Steam Leak on High Pressure Turbine Inlet Flange.Facility Expected to Be Shut Down for Approx 4 Days
ML20211E35720 October 1986PNS-I-86-020:on 861017,licensee Determined That Terminal Strip in Motor Control Ctr Disengaged.Preliminary Investigation by Licensee Found No Evidence of Authorized Work Performed on Sys.Investigation Continuing
PNO-I-86-083, on 861015,licensee Manually Scrammed Unit & Placed in Cold Shutdown for Condensate Pump Repairs.Damaged Thrust Bearing Will Be Repaired & Pump Will Be Returned to Svc on 861019.Startup Planned on 86101917 October 1986PNO-I-86-083:on 861015,licensee Manually Scrammed Unit & Placed in Cold Shutdown for Condensate Pump Repairs.Damaged Thrust Bearing Will Be Repaired & Pump Will Be Returned to Svc on 861019.Startup Planned on 861019
PNO-I-86-080, on 860929,licensee Commenced Shutdown Upon Discovering Water Leakage Into Main Turbine Electrohydraulic Control Oil Sys.Return to Svc Not Expected for Approx 5 Days Following Determination of Source of Leakage30 September 1986PNO-I-86-080:on 860929,licensee Commenced Shutdown Upon Discovering Water Leakage Into Main Turbine Electrohydraulic Control Oil Sys.Return to Svc Not Expected for Approx 5 Days Following Determination of Source of Leakage
PNO-I-86-053, on 860719,scram Occurred When Reactor Pressure Spike Caused High Neutron Flux Signal.Caused by MSIV Closure During Offsite Power Trip Resulting in Loss of Emergency Power.Util Will Repair Failed Dc Coil on MSIV21 July 1986PNO-I-86-053:on 860719,scram Occurred When Reactor Pressure Spike Caused High Neutron Flux Signal.Caused by MSIV Closure During Offsite Power Trip Resulting in Loss of Emergency Power.Util Will Repair Failed Dc Coil on MSIV
PNO-I-86-043, on 860618,unplanned Shutdown Commenced Due to Leak in Emergency Svc Water Sys.Leak Stopped by Installing Pipe Clamp.Permanent Repairs Will Be Made Prior to Startup18 June 1986PNO-I-86-043:on 860618,unplanned Shutdown Commenced Due to Leak in Emergency Svc Water Sys.Leak Stopped by Installing Pipe Clamp.Permanent Repairs Will Be Made Prior to Startup
ML20155H1328 May 1986PNS-I-86-005:on 860506 & 07,bomb Threats Received. Nonessential Personnel Evacuated.No Device Found. Investigation Continuing
PNO-I-86-029, on 860413,explosion & Resultant Fire Occurred in Offsite Transformer.Caused by Internal Phase a Electrical Fault,Resulting in Fire & Damage to Adjacent Phase B.Plant Fire Brigade Extinguished Fire14 April 1986PNO-I-86-029:on 860413,explosion & Resultant Fire Occurred in Offsite Transformer.Caused by Internal Phase a Electrical Fault,Resulting in Fire & Damage to Adjacent Phase B.Plant Fire Brigade Extinguished Fire
PNO-I-86-019, on 860124,diesel Generator E-2 Scavenging Air Blower Failed After 21 H Continuous Operation at Low Load. Caused by Excessive Low Load Operation,As Reported by Vendor.Blower Replaced W/Higher Tolerance Blower20 February 1986PNO-I-86-019:on 860124,diesel Generator E-2 Scavenging Air Blower Failed After 21 H Continuous Operation at Low Load. Caused by Excessive Low Load Operation,As Reported by Vendor.Blower Replaced W/Higher Tolerance Blower