Issue date | Title | Topic | |
---|---|---|---|
PNO-I-99-011, on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries | 3 March 1999 | PNO-I-99-011:on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries | |
PNO-I-90-073, on 900830,licensee Identified That Reactor Vessel Level Monitoring Instruments Reading About 10 Inches Higher than Expected.Caused by Ref Leg Being Less than Completely Full.Manual Scram from Low Power Initiated | 31 August 1990 | PNO-I-90-073:on 900830,licensee Identified That Reactor Vessel Level Monitoring Instruments Reading About 10 Inches Higher than Expected.Caused by Ref Leg Being Less than Completely Full.Manual Scram from Low Power Initiated | |
PNO-I-90-058, on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation | 27 July 1990 | PNO-I-90-058:on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
ML20246P582 | 30 August 1989 | PNS-I-89-014:on 890829,unusual Event Declared Due to Mischievous Vandalism of Electrical Circuit Breakers.Total of 10 Breakers Found W/Cut Leads.Region I Physical Security Inspector Dispatched to Site & Press Release Issued | |
ML20246H591 | 25 August 1989 | PNS-I-89-012:on 890825,3 Bomb Threats Received.Vital Areas & Administration Bldg Searched.Threat Considered Hoax.Nrc & Commonwealth of PA Informed | |
PNO-I-89-068, on 890804,full Power Reached & Mar 1987 Shutdown Order relaxed.Two-wk Mgt Assessment Period at steady-state 100% Power Plateau Begun,Per Restart Power Testing Program | 4 August 1989 | PNO-I-89-068:on 890804,full Power Reached & Mar 1987 Shutdown Order relaxed.Two-wk Mgt Assessment Period at steady-state 100% Power Plateau Begun,Per Restart Power Testing Program | |
PNO-I-89-060, facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage | 21 July 1989 | PNO-I-89-060:facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage | |
ML20247D442 | 19 July 1989 | PNS-I-89-013:on 890711,trespasser Arrested by Commonwealth of PA at Plant & While Arrested Made Ref to Large Amounts of Weapons & Explosives Stored at Residence in Edgewood,Md.Explosives & Detonators Removed from Residence | |
PNO-I-89-052, facility Authorized to Proceed to 70% Power. Insp on Site Will Continue During Power Ascension from 35% to 70% Power & Subsequent Transient Testing | 28 June 1989 | PNO-I-89-052:facility Authorized to Proceed to 70% Power. Insp on Site Will Continue During Power Ascension from 35% to 70% Power & Subsequent Transient Testing | |
PNO-I-89-050, on 890627,confirmatory Action Ltr Issued on Util & Commonwealth of PA Agreement to Satisfy Concerns Re Restart Plan.Agreement Should Form Basis for Concluding Hearing on Util Reorganization | 26 June 1989 | PNO-I-89-050:on 890627,confirmatory Action Ltr Issued on Util & Commonwealth of PA Agreement to Satisfy Concerns Re Restart Plan.Agreement Should Form Basis for Concluding Hearing on Util Reorganization | |
ML20247H867 | 26 May 1989 | PNS-I-89-007A:on 890525,two Vehicle Bomb Threats Received at Facility.Licensee Maintaining in-force Heightened Security Measures.Law Enforcement Agencies in Plant Vicinity & Commonwealth of PA Notified | |
ML20247H855 | 25 May 1989 | PNS-I-89-007:on 890525,telephone Call Received at Util Headquarters in Philadelphia,Pa Indicating That Van Loaded W/Explosives Would Arrive at Plant.Threat Evaluated as Noncredible.Heightened Security Awareness Initiated | |
PNO-I-89-036, on 890519,reactor High Level Water Feed Pump Tripped.Caused by Shifting of Feedwater Level Control Sys by Reactor Operator from Single Element to Three Element Control.Water Level Recovered & Isolations Reset | 19 May 1989 | PNO-I-89-036:on 890519,reactor High Level Water Feed Pump Tripped.Caused by Shifting of Feedwater Level Control Sys by Reactor Operator from Single Element to Three Element Control.Water Level Recovered & Isolations Reset | |
PNO-I-89-034, on 890426,Unit 2 Initiated Startup After Receiving Approval to Operate at Power Levels Not Exceeding 35% Full Power.Licensee Will Be Performing Control Rod Manipulations.Addl NRC Inspectors on Site to Monitor Plant | 27 April 1989 | PNO-I-89-034:on 890426,Unit 2 Initiated Startup After Receiving Approval to Operate at Power Levels Not Exceeding 35% Full Power.Licensee Will Be Performing Control Rod Manipulations.Addl NRC Inspectors on Site to Monitor Plant | |
PNO-I-89-014, on 890227 Commonwealth of PA & Util Announced Agreement on Proposed Actions to Address Commonwealth Concerns Re Mgt & Safety at Plant & to Provide Exchange of Info W/Commonwealth for Next 8 Yrs | 27 February 1989 | PNO-I-89-014:on 890227 Commonwealth of PA & Util Announced Agreement on Proposed Actions to Address Commonwealth Concerns Re Mgt & Safety at Plant & to Provide Exchange of Info W/Commonwealth for Next 8 Yrs | |
PNO-I-88-110, on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security | 21 October 1988 | PNO-I-88-110:on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security | |
PNO-I-88-092, on 880901,injured Contaminated Contractor Employee Removed from Site After Falling 20 Ft from Platform.Worker Suffered Broken Wrist & Facial Cut W/ 600 Dpm Contamination.Worker Successfully Decontaminated | 2 September 1988 | PNO-I-88-092:on 880901,injured Contaminated Contractor Employee Removed from Site After Falling 20 Ft from Platform.Worker Suffered Broken Wrist & Facial Cut W/ 600 Dpm Contamination.Worker Successfully Decontaminated | |
PNO-I-88-077, on 880727,Peach Bottom co-owners Sued Philadelphia Electric Co (PECO) for Failure to Comply W/Peco Obligations Under Contract to Notify co-owners of Serious Operator Attentiveness Problems | 27 July 1988 | PNO-I-88-077:on 880727,Peach Bottom co-owners Sued Philadelphia Electric Co (PECO) for Failure to Comply W/Peco Obligations Under Contract to Notify co-owners of Serious Operator Attentiveness Problems | |
PNO-I-88-050, on 880511,FBI Made Addl Arrests of Three Licensee Employees Re Involvement in Illegal Drug Activities Prior to 1987.Followup of PNO-I-87-108 | 12 May 1988 | PNO-I-88-050:on 880511,FBI Made Addl Arrests of Three Licensee Employees Re Involvement in Illegal Drug Activities Prior to 1987.Followup of PNO-I-87-108 | |
PNO-I-88-042A, on 880414,updated PNO Re Alcohol Bottle Found in Control Room by Engineers Performing Inventory of Agastat Relays Inside Electrical Distribution Panel.Senior Resident Inspector Notified & Investigation Continuing | 5 May 1988 | PNO-I-88-042A:on 880414,updated PNO Re Alcohol Bottle Found in Control Room by Engineers Performing Inventory of Agastat Relays Inside Electrical Distribution Panel.Senior Resident Inspector Notified & Investigation Continuing | |
PNO-I-88-042, licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal | 18 April 1988 | PNO-I-88-042:licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal | |
PNO-I-87-108B, on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees | 18 March 1988 | PNO-I-87-108B:on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees | |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-I-87-108A, on 871118,FBI Arrested Four Licensee & Two Contractor Employees Accused of Drug Distribution at Plant & Surrounding Area.One Util & Contractor Employees Found Guilty & Remaining Two Util Defendants Suspended | 20 January 1988 | PNO-I-87-108A:on 871118,FBI Arrested Four Licensee & Two Contractor Employees Accused of Drug Distribution at Plant & Surrounding Area.One Util & Contractor Employees Found Guilty & Remaining Two Util Defendants Suspended | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
ML20236R575 | 19 November 1987 | PNS-I-87-019:on 871118,nonspecific Bomb Threats Received Over Plant Internal Telephone Sys.Steps to Heighten Security Awareness Among Plant & Security Supervisors Taken. Investigation Initiated by Licensee | |
PNO-I-87-108, on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area | 18 November 1987 | PNO-I-87-108:on 871118,FBI Arrested 6 Individuals,Accused of Drug Distribution at Peach Bottom Power Station & Surrounding York County Area | |
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | 9 October 1987 | PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | |
PNO-I-87-057, on 870621,plant Manager Found Security Watchman Asleep at Drywell Access.Watchman Escorted Offsite by Sergeant of Guards & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions | 22 June 1987 | PNO-I-87-057:on 870621,plant Manager Found Security Watchman Asleep at Drywell Access.Watchman Escorted Offsite by Sergeant of Guards & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions | |
PNO-I-87-046, on 870529,security Watchman Found Asleep by Plant Auxiliary Operator & Shift Supervisor.Watchman Escorted Offsite & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions | 29 May 1987 | PNO-I-87-046:on 870529,security Watchman Found Asleep by Plant Auxiliary Operator & Shift Supervisor.Watchman Escorted Offsite & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions | |
PNO-I-87-042, on 870513,nonlicensed Operator Found Sleeping While on Duty During 'Z' Shift.Licensee Suspended Individual Pending Investigation.State of MD & Commonwealth of PA Informed | 14 May 1987 | PNO-I-87-042:on 870513,nonlicensed Operator Found Sleeping While on Duty During 'Z' Shift.Licensee Suspended Individual Pending Investigation.State of MD & Commonwealth of PA Informed | |
PNO-I-87-041, on 870508,util Terminated Employment of Subcontractor Hines Performing CRD Exchange Work.Caused by Poor Work Performance.Workers Escorted Offsite.Media Contacted by Worker Re 870505-08 Facial Contaminations | 11 May 1987 | PNO-I-87-041:on 870508,util Terminated Employment of Subcontractor Hines Performing CRD Exchange Work.Caused by Poor Work Performance.Workers Escorted Offsite.Media Contacted by Worker Re 870505-08 Facial Contaminations | |
PNO-I-87-040, on 870506,30 G of Suspected Marijuana Found Onsite When Substance Fell Out of Jacket of Catalytic Laborer.Caused by Employee Accidentally Bringing Substance Onsite.Employee Terminated | 8 May 1987 | PNO-I-87-040:on 870506,30 G of Suspected Marijuana Found Onsite When Substance Fell Out of Jacket of Catalytic Laborer.Caused by Employee Accidentally Bringing Substance Onsite.Employee Terminated | |
ML20205T188 | 1 April 1987 | PNO-I-87-26A:on 870331,order Issued Suspending Power Operation Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 Currently in Scheduled Refueling Outage W/In Progress Core Offload 2/3 Complete | |
PNO-I-87-026, on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete | 31 March 1987 | PNO-I-87-026:on 870331,NRC Issued Order Suspending Power Operation Effective Immediately.Unit 3 Began Controlled Shutdown from 100% Reactor Power.Unit 2 in Scheduled Refueling Outage:Core Offload in Progress & 50% Complete | |
PNO-I-87-024, on 870325,unit Auto Scrammed on Low Reactor Water Level When Engineer Lifted Electrohydraulic Control Lead Causing Bypass Valves to Open.Reactor Feed Pump Restarted.Water Level Recovered | 25 March 1987 | PNO-I-87-024:on 870325,unit Auto Scrammed on Low Reactor Water Level When Engineer Lifted Electrohydraulic Control Lead Causing Bypass Valves to Open.Reactor Feed Pump Restarted.Water Level Recovered | |
PNO-I-87-022, on 870317,hi-hi APRM Flux Scram & Group II & III Primary Containment Isolations Occurred.Caused by Electrohydraulic Control Sys Fluctuations.Unit in Cold Shutdown.Isolations Reset | 18 March 1987 | PNO-I-87-022:on 870317,hi-hi APRM Flux Scram & Group II & III Primary Containment Isolations Occurred.Caused by Electrohydraulic Control Sys Fluctuations.Unit in Cold Shutdown.Isolations Reset | |
PNO-I-87-018, on 870305,unit Shut Down Due to Hydrogen Leak from Main Generator.Leak Testing of Generator Identified Several Small & One Large Leak from Hydrogen Control & Analyzer Cabinet.Repairs to Generator & RHR HX in Progress | 9 March 1987 | PNO-I-87-018:on 870305,unit Shut Down Due to Hydrogen Leak from Main Generator.Leak Testing of Generator Identified Several Small & One Large Leak from Hydrogen Control & Analyzer Cabinet.Repairs to Generator & RHR HX in Progress | |
PNO-I-87-015, on 870304,smoke Reported in Turbine Bldg.Fire Found in Maint Cage in Turbine Bldg Fan Room.Fire Extinguished.Caused by Small Electrical Fan Suspended from Cage | 5 March 1987 | PNO-I-87-015:on 870304,smoke Reported in Turbine Bldg.Fire Found in Maint Cage in Turbine Bldg Fan Room.Fire Extinguished.Caused by Small Electrical Fan Suspended from Cage | |
PNO-I-87-001, on 870102,licensee Notified Region I Ofc of Unplanned Shut Down to Repair Steam Leak on High Pressure Turbine Inlet Flange.Facility Expected to Be Shut Down for Approx 4 Days | 2 January 1987 | PNO-I-87-001:on 870102,licensee Notified Region I Ofc of Unplanned Shut Down to Repair Steam Leak on High Pressure Turbine Inlet Flange.Facility Expected to Be Shut Down for Approx 4 Days | |
ML20211E357 | 20 October 1986 | PNS-I-86-020:on 861017,licensee Determined That Terminal Strip in Motor Control Ctr Disengaged.Preliminary Investigation by Licensee Found No Evidence of Authorized Work Performed on Sys.Investigation Continuing | |
PNO-I-86-083, on 861015,licensee Manually Scrammed Unit & Placed in Cold Shutdown for Condensate Pump Repairs.Damaged Thrust Bearing Will Be Repaired & Pump Will Be Returned to Svc on 861019.Startup Planned on 861019 | 17 October 1986 | PNO-I-86-083:on 861015,licensee Manually Scrammed Unit & Placed in Cold Shutdown for Condensate Pump Repairs.Damaged Thrust Bearing Will Be Repaired & Pump Will Be Returned to Svc on 861019.Startup Planned on 861019 | |
PNO-I-86-080, on 860929,licensee Commenced Shutdown Upon Discovering Water Leakage Into Main Turbine Electrohydraulic Control Oil Sys.Return to Svc Not Expected for Approx 5 Days Following Determination of Source of Leakage | 30 September 1986 | PNO-I-86-080:on 860929,licensee Commenced Shutdown Upon Discovering Water Leakage Into Main Turbine Electrohydraulic Control Oil Sys.Return to Svc Not Expected for Approx 5 Days Following Determination of Source of Leakage | |
PNO-I-86-053, on 860719,scram Occurred When Reactor Pressure Spike Caused High Neutron Flux Signal.Caused by MSIV Closure During Offsite Power Trip Resulting in Loss of Emergency Power.Util Will Repair Failed Dc Coil on MSIV | 21 July 1986 | PNO-I-86-053:on 860719,scram Occurred When Reactor Pressure Spike Caused High Neutron Flux Signal.Caused by MSIV Closure During Offsite Power Trip Resulting in Loss of Emergency Power.Util Will Repair Failed Dc Coil on MSIV | |
PNO-I-86-043, on 860618,unplanned Shutdown Commenced Due to Leak in Emergency Svc Water Sys.Leak Stopped by Installing Pipe Clamp.Permanent Repairs Will Be Made Prior to Startup | 18 June 1986 | PNO-I-86-043:on 860618,unplanned Shutdown Commenced Due to Leak in Emergency Svc Water Sys.Leak Stopped by Installing Pipe Clamp.Permanent Repairs Will Be Made Prior to Startup | |
ML20155H132 | 8 May 1986 | PNS-I-86-005:on 860506 & 07,bomb Threats Received. Nonessential Personnel Evacuated.No Device Found. Investigation Continuing | |
PNO-I-86-029, on 860413,explosion & Resultant Fire Occurred in Offsite Transformer.Caused by Internal Phase a Electrical Fault,Resulting in Fire & Damage to Adjacent Phase B.Plant Fire Brigade Extinguished Fire | 14 April 1986 | PNO-I-86-029:on 860413,explosion & Resultant Fire Occurred in Offsite Transformer.Caused by Internal Phase a Electrical Fault,Resulting in Fire & Damage to Adjacent Phase B.Plant Fire Brigade Extinguished Fire | |
PNO-I-86-019, on 860124,diesel Generator E-2 Scavenging Air Blower Failed After 21 H Continuous Operation at Low Load. Caused by Excessive Low Load Operation,As Reported by Vendor.Blower Replaced W/Higher Tolerance Blower | 20 February 1986 | PNO-I-86-019:on 860124,diesel Generator E-2 Scavenging Air Blower Failed After 21 H Continuous Operation at Low Load. Caused by Excessive Low Load Operation,As Reported by Vendor.Blower Replaced W/Higher Tolerance Blower |